2 floors · 3,500 sq ft · built 1920 · class K4 · owner of record: 719 Grand Street Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 50 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 781 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 7, 2026 | Construction CLASS - 2 AT THE TIME OF INSPECTION ON AN ACTIVE JOB SITE , I OBSERVED SIDEWALK SHED AT EXPOSURE 1 UPON MY REQUEST WHEN I ASKED CONTRACTORS ON SITE FOR LETTER OF INSTALLATION AND DAILY LOGBOOK FOR SIDEWALK SHED NONE WAS #39560264M | Dec 16, 2026 PENDING | $1,250 |
| Oct 7, 2026 | Construction CLASS - 2 AT THE TIME OF INSPECTION ON AN ACTIVE JOB SITE I OBSERVED CONSTRUCTION FENCE AT EXPOSURE 1 AND WAS NOT AS PER BC 3307.7.2 DOOR WAS SWING OUT TOWARDS IN THE PATHWAY OF PEDESTRIANS PASSING BY SITE CREATING POTEN #39560259H | Dec 16, 2026 PENDING | $1,000 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 1) | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 7, 2026 | ECB | Construction: AT THE TIME OF INSPECTION ON AN ACTIVE JOB SITE , I OBSERVED SIDEWALK SHED AT EXPOSURE 1 UPON MY REQUEST WHEN I ASKED CONTRACTORS ON SITE FOR LETTER OF INSTALLATION AND DAILY LOGBOOK FOR SIDEWALK SHED NONE WAS | Open |
| Oct 7, 2026 | ECB | Construction: AT THE TIME OF INSPECTION ON AN ACTIVE JOB SITE I OBSERVED CONSTRUCTION FENCE AT EXPOSURE 1 AND WAS NOT AS PER BC 3307.7.2 DOOR WAS SWING OUT TOWARDS IN THE PATHWAY OF PEDESTRIANS PASSING BY SITE CREATING POTEN | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 11, 2026, 7:39 AM ET. BBL 3027820029.