3 floors · 3 apartments · 2,800 sq ft · built 1965 · class C0 · owner of record: Achinefu, Reagan Chinedu
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 52 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 52 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 52 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 68 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 296 days | Registered through 2027-09-01 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 11, 2026 | Unknown CLASS - 1 AT THE TIME OF INSPECTION, ELECTRICAL WORK / AC UNITS, CONDUITS FOR LIGHTS WERE INSTALLED WITHOUT THE REQUIRED ELECTRICAL PERMIT AND/OR APPROVALS. THE INSTALLATION WAS PERFORMED WITHOUT AUTHORIZATION FROM THE A #39200209K | Jan 22, 2027 PENDING | $2,500 |
| Aug 11, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN IN CODE-COMPLIANT MANNER. ATOI, OBSERVED PORTIONS OF THE CEILING/CEILING FINISHES HAVE COLLAPSED ARE IN A DETERIORATED CONDITION, WITH EXTENSIVE LOOSE AND FALLEN CEILING MATERIALS, INSULATIO #35721955K | Jan 22, 2027 PENDING | $12,500 |
| Aug 11, 2026 | Construction CLASS - 1 ATOI CONSTRUCTION/ALTERATION WORK, INCLUDING REMOVAL AND/OR REPLACEMENT OF CEILING AND INTERIOR BUILDING ELEMENTS LIKE WALL PARTITIONS, KITCHEN AND TOILET WAS OBSERVED CONSTRUCTED WITHOUT A VALID DOB PERMIT, OB #39200208Z | Jan 22, 2027 PENDING | $2,500 |
| Aug 11, 2026 | Plumbing CLASS - 2 ATOI OBSERVED PLUMBING WORK, INCLUDING INSTALLATION, ALTERATION AND/OR MODIFICATION OF PLUMBING PIPING AND FIXTURES, BEING PERFORMED WITHOUT A VALID PERMIT. VIOLATION OF PC 102.3; ADMINISTRATIVE CODE 27-902, RE #39200210H | Jan 22, 2027 PENDING | $1,250 |
| Aug 11, 2026 | Construction CLASS - 1 ATOI THE PREMISES IS BEING OCCUPIED/USED FOR A PURPOSE DIFFERENT FROM THE USE OR OCCUPANCY PERMITTED BY THE CURRENT CERTIFICATE OF OCCUPANCY, WITHOUT OBTAINING THE REQUIRED APPROVAL AND/OR AMENDED CERTIFICATE O #39200207R | Jan 22, 2027 PENDING | $2,500 |
| Issued | Violation | Status |
|---|---|---|
| Aug 11, 2026 | CONSTRUCTION REQUESTING AN ENGINEER'S REPORT DUE TO CEILING COLLAPSED, ROOF INSULATION FALL DOWN. AN ENGINEER'S REPORT IS REQUIRED TO ASSESS ALL WOOD JOISTS AND STABILITY OF APARTMENT IN 3RD FLOOR DUE TO COLLAPSED DAMAGES. #26-01985 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 9) | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Aug 13, 2026 | B | Apt 3RDFLO · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE 1ST WOODEN TREAD UP FROM BOTTOM IN THE ENTRANCE LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 17, 2026 |
| Aug 12, 2026 | B | Apt 2 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 4th ROOM FROM EAST AT SOUTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 16, 2026 |
| Aug 12, 2026 | C | Apt 2 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 7, 2026 |
| Aug 12, 2026 | B | Apt 3RDFLO · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 16, 2026 |
| Aug 12, 2026 | B | Apt 3RDFLO · § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 16, 2026 |
| Aug 12, 2026 | B | Apt 3RDFLO · § 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF EXPOSED ELECTRIC WIRES AT CEILING IN THE 4th ROOM FROM EAST AT NORTH LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 16, 2026 |
| Aug 12, 2026 | B | Apt 3RDFLO · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE 4th ROOM FROM EAST AT NORTH LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 16, 2026 |
| Aug 12, 2026 | B | Apt 3RDFLO · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT NORTH WALL IN THE 4th ROOM FROM EAST AT SOUTH LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 16, 2026 |
| Aug 12, 2026 | B | Apt 3RDFLO · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 16, 2026 |
| Aug 12, 2026 | B | Apt 3RDFLO · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 16, 2026 |
| Aug 12, 2026 | B | Apt 3RDFLO · § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE FLOOR IN THE KITCHEN LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 16, 2026 |
| Jul 27, 2026 | B | Apt TOPFLO · § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT TOPFLO, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 31, 2026 |
| Jul 27, 2026 | A | Apt TOPFLO · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING AND ALL WALLS IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT TOPFLO, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 30, 2026 |
| Jul 27, 2026 | B | Apt TOPFLO · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT TOPFLO, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 31, 2026 |
| Jul 27, 2026 | B | Apt TOPFLO · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT TOPFLO, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 31, 2026 |
| Jul 27, 2026 | B | Apt TOPFLO · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 4th ROOM FROM EAST AT SOUTH LOCATED AT APT TOPFLO, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 31, 2026 |
| Jul 27, 2026 | B | Apt TOPFLO · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 30SQ FT AT CEILING IN THE 4th ROOM FROM EAST AT SOUTH LOCATED AT APT TOPFLO, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 31, 2026 |
| Jul 27, 2026 | B | Apt TOPFLO · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING AND SOUTH WALL IN THE 4th ROOM FROM EAST AT SOUTH LOCATED AT APT TOPFLO, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 31, 2026 |
| Jul 27, 2026 | C | Apt TOPFLO · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT DOOR IN THE ENTRANCE LOCATED AT APT TOPFLO, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 10, 2026 |
| Oct 16, 2009 | B | Apt 1 · SECTION 9, 170, 171, 300, 301, 302 M.D.LAW-FILE PLANS AND APPLICATION AND OBTAIN A CERTIFICATE OF OCCUPANCY TO LEGALIZE THE CONVERSION FROM A PRIVATE DWELLING TO MULTIPLE DWELLING USE IF LAWFULLY FEASIBLE OR RESTORE TO LAWFUL OCCUPANCY IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY, APARTMENT A | Nov 20, 2009 |
| Oct 16, 2009 | B | Apt 1 · SECTION 27-2073 ADM CODE - DISCONTINUE UNLAWFUL COOKING SPACE OR FILE PLANS AND APPLICATION WITH THIS DEPARTMENT TO LEGALIZE SAME, IF LAWFULLY FEASIBLE AT KITCHEN IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY, APARTMENT AT WEST | Nov 20, 2009 |
| Jul 23, 2009 | A | Apt 1FL · SECTION 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF EXPOSED WIRES AT EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 1FL, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 26, 2009 |
| Jul 23, 2009 | A | Apt 1FL · SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 1FL, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 26, 2009 |
| Jul 23, 2009 | A | Apt 1FL · SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 1FL, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 26, 2009 |
| Jul 23, 2009 | A | Apt 1FL · SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE MECHANICAL VENT AT CEILING IN THE BATHROOM LOCATED AT APT 1FL, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 26, 2009 |
| Jul 23, 2009 | A | Apt 1FL · SECTION 27-2026 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE CONNECTION AT SINK IN THE KITCHEN LOCATED AT APT 1FL, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 26, 2009 |
| Date | Source | What | Now |
|---|---|---|---|
| Aug 13, 2026 | HPD C | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING 6TH TO 9TH BALUSTER AT INTERMEDIATE LANDING 3RD STORY IN THE PRIVATE HALLWAY LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Closed |
| Aug 13, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE 1ST WOODEN TREAD UP FROM BOTTOM IN THE ENTRANCE LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Aug 12, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 4th ROOM FROM EAST AT SOUTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Aug 12, 2026 | HPD C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Aug 12, 2026 | HPD B | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Aug 12, 2026 | HPD B | § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Aug 12, 2026 | HPD B | § 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF EXPOSED ELECTRIC WIRES AT CEILING IN THE 4th ROOM FROM EAST AT NORTH LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Aug 12, 2026 | HPD B | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE 4th ROOM FROM EAST AT NORTH LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Aug 12, 2026 | HPD B | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT NORTH WALL IN THE 4th ROOM FROM EAST AT SOUTH LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Aug 12, 2026 | HPD B | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Aug 12, 2026 | HPD B | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Aug 12, 2026 | HPD B | § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE FLOOR IN THE KITCHEN LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Aug 11, 2026 | DOB | CONSTRUCTION: REQUESTING AN ENGINEER'S REPORT DUE TO CEILING COLLAPSED, ROOF INSULATION FALL DOWN. AN ENGINEER'S REPORT IS REQUIRED TO ASSESS ALL WOOD JOISTS AND STABILITY OF APARTMENT IN 3RD FLOOR DUE TO COLLAPSED DAMAGES. | Open |
| Aug 11, 2026 | ECB | Unknown: AT THE TIME OF INSPECTION, ELECTRICAL WORK / AC UNITS, CONDUITS FOR LIGHTS WERE INSTALLED WITHOUT THE REQUIRED ELECTRICAL PERMIT AND/OR APPROVALS. THE INSTALLATION WAS PERFORMED WITHOUT AUTHORIZATION FROM THE A | Open |
| Aug 11, 2026 | ECB | Construction: FAILURE TO MAINTAIN IN CODE-COMPLIANT MANNER. ATOI, OBSERVED PORTIONS OF THE CEILING/CEILING FINISHES HAVE COLLAPSED ARE IN A DETERIORATED CONDITION, WITH EXTENSIVE LOOSE AND FALLEN CEILING MATERIALS, INSULATIO | Open |
| Aug 11, 2026 | ECB | Construction: ATOI CONSTRUCTION/ALTERATION WORK, INCLUDING REMOVAL AND/OR REPLACEMENT OF CEILING AND INTERIOR BUILDING ELEMENTS LIKE WALL PARTITIONS, KITCHEN AND TOILET WAS OBSERVED CONSTRUCTED WITHOUT A VALID DOB PERMIT, OB | Open |
| Aug 11, 2026 | ECB | Plumbing: ATOI OBSERVED PLUMBING WORK, INCLUDING INSTALLATION, ALTERATION AND/OR MODIFICATION OF PLUMBING PIPING AND FIXTURES, BEING PERFORMED WITHOUT A VALID PERMIT. VIOLATION OF PC 102.3; ADMINISTRATIVE CODE 27-902, RE | Open |
| Aug 11, 2026 | ECB | Construction: ATOI THE PREMISES IS BEING OCCUPIED/USED FOR A PURPOSE DIFFERENT FROM THE USE OR OCCUPANCY PERMITTED BY THE CURRENT CERTIFICATE OF OCCUPANCY, WITHOUT OBTAINING THE REQUIRED APPROVAL AND/OR AMENDED CERTIFICATE O | Open |
| Jul 27, 2026 | HPD B | § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT TOPFLO, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Jul 27, 2026 | HPD A | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING AND ALL WALLS IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT TOPFLO, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Jul 27, 2026 | HPD B | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT TOPFLO, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Jul 27, 2026 | HPD B | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT TOPFLO, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Jul 27, 2026 | HPD B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 4th ROOM FROM EAST AT SOUTH LOCATED AT APT TOPFLO, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Jul 27, 2026 | HPD B | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 30SQ FT AT CEILING IN THE 4th ROOM FROM EAST AT SOUTH LOCATED AT APT TOPFLO, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Jul 27, 2026 | HPD B | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING AND SOUTH WALL IN THE 4th ROOM FROM EAST AT SOUTH LOCATED AT APT TOPFLO, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 9, 2026, 5:37 PM ET. BBL 2035960017.