| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 69 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1165 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 6, 2026 | Unknown CLASS - 1 MISCELLANEOUS VIOLATION OF THE ELECTRICAL CODE TECHNICAL STANDARDS. OBSERVED THAT THE BOILER RM WHERE THREE HUNG BOILERS ARE INSTALLED HAS NO REMOTE SHUTDOWN. M.C. 1006.8.1 REMOTE SHUTDOWN POINTS OF EGRESS NEC #39199552M | Dec 11, 2026 PENDING | $1,600 |
| Aug 6, 2026 | Construction CLASS - 1 ATOI OBSERVED THROUGH THE OFFICE REST ROOMS AND IN THE LAUNDRY ROOM PVC FITTINGS/PIPING USED FOR WASTE LINES CONTRARY TO PC 1101.10 - PVC PIPING USED FOR WASTE PIPING WAS OBSERVED CONTRARY TO THE APPROVED INSTA #39199543K | Dec 11, 2026 PENDING | $2,500 |
| Aug 6, 2026 | Construction CLASS - 1 ATOI OBSERVED IN THE GARAGE LEVEL MAIN BOILER ROOM NEWLY INSTALLED WALL HUNG BOILERS INSTALLED WITH NO PERMITS ON FILE CHECK BIS/DOBNOW NO PERMITS ON FILE., OBTAIN PERMIT #39199544M | Dec 11, 2026 PENDING | $2,500 |
| Aug 6, 2026 | Unknown CLASS - 1 ELECTRICAL WORK WITHOUT A PERMIT. OBSERVED IN THE PARKING GARAGE NEW LIGHTS WITH NEW ARMORED CABLE INSTALLED, AND POWER FOR NEW 3 HUNG GAS BOILERS WITH NEW RECEPTACLES CHECKED BIS / DOB NOW NO PERMIT ON FILE AL #39199551K | Dec 11, 2026 PENDING | $2,500 |
| Aug 6, 2026 | Unknown CLASS - 2 FAILURE TO PROVIDE ADEQUATE GROUNDING OF ELECTRICAL SYSTEMS. OBSERVED IN THE WATER METER RM THAT THE MAIN BUILDING WATER GROUND CLAMP IS IN A STATE OF RUSTED/ CORROSION IS NO LONGER MAINTAIN A SOLID GROUND FOR #39199550Z | Dec 11, 2026 PENDING | $2,400 |
| Aug 6, 2026 | Construction CLASS - 1 ATOI OBSERVED SPRINKLER HEAD ABOVE THE CEIL DROP TILES BEING OBSTRUCTED AND CAUSING FAULT TO THE SYSTEM OPERATION CONTRARY TO FGC 903.3.3 OBSTRUCTED LOCATIONS IN AUTOMATIC FIRE SPRINKLER SYSTEMS. IT MANDATES TH #39199542Z | Dec 11, 2026 PENDING | $2,500 |
| Aug 6, 2026 | Unknown CLASS - 2 UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT, APPARATUS, MATERIALS, DEVICES, APPLIANCES OR WIRING IN USE. OBSERVED ON THE 2ND FL EXTENSION / FLEX CORDS PASSING THRU DOORWAYS IN THE OFFICE FEED FANS AND POW #39199553Y | Dec 11, 2026 PENDING | $800 |
| Aug 12, 2021 | Construction CLASS - 2 OBSERVED: AT EXPOSURE # 1, 2, 3 & 4 VARIOUS LOCATION, SEVERAL CRACKS IN BLOCK WALLS, DETACHMENT STUCCO, MISSING MORTAR IN COLUMNS DECORATION., REPAIR AND/OR REPLACE #39045929L | Dec 15, 2021 DEFAULT | $0 |
None open.
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Aug 6, 2026 | ECB | Unknown: MISCELLANEOUS VIOLATION OF THE ELECTRICAL CODE TECHNICAL STANDARDS. OBSERVED THAT THE BOILER RM WHERE THREE HUNG BOILERS ARE INSTALLED HAS NO REMOTE SHUTDOWN. M.C. 1006.8.1 REMOTE SHUTDOWN POINTS OF EGRESS NEC | Open |
| Aug 6, 2026 | ECB | Construction: ATOI OBSERVED THROUGH THE OFFICE REST ROOMS AND IN THE LAUNDRY ROOM PVC FITTINGS/PIPING USED FOR WASTE LINES CONTRARY TO PC 1101.10 - PVC PIPING USED FOR WASTE PIPING WAS OBSERVED CONTRARY TO THE APPROVED INSTA | Open |
| Aug 6, 2026 | ECB | Construction: ATOI OBSERVED IN THE GARAGE LEVEL MAIN BOILER ROOM NEWLY INSTALLED WALL HUNG BOILERS INSTALLED WITH NO PERMITS ON FILE CHECK BIS/DOBNOW NO PERMITS ON FILE., OBTAIN PERMIT | Open |
| Aug 6, 2026 | ECB | Unknown: ELECTRICAL WORK WITHOUT A PERMIT. OBSERVED IN THE PARKING GARAGE NEW LIGHTS WITH NEW ARMORED CABLE INSTALLED, AND POWER FOR NEW 3 HUNG GAS BOILERS WITH NEW RECEPTACLES CHECKED BIS / DOB NOW NO PERMIT ON FILE AL | Open |
| Aug 6, 2026 | ECB | Unknown: FAILURE TO PROVIDE ADEQUATE GROUNDING OF ELECTRICAL SYSTEMS. OBSERVED IN THE WATER METER RM THAT THE MAIN BUILDING WATER GROUND CLAMP IS IN A STATE OF RUSTED/ CORROSION IS NO LONGER MAINTAIN A SOLID GROUND FOR | Open |
| Aug 6, 2026 | ECB | Construction: ATOI OBSERVED SPRINKLER HEAD ABOVE THE CEIL DROP TILES BEING OBSTRUCTED AND CAUSING FAULT TO THE SYSTEM OPERATION CONTRARY TO FGC 903.3.3 OBSTRUCTED LOCATIONS IN AUTOMATIC FIRE SPRINKLER SYSTEMS. IT MANDATES TH | Open |
| Aug 6, 2026 | ECB | Unknown: UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT, APPARATUS, MATERIALS, DEVICES, APPLIANCES OR WIRING IN USE. OBSERVED ON THE 2ND FL EXTENSION / FLEX CORDS PASSING THRU DOORWAYS IN THE OFFICE FEED FANS AND POW | Open |