Brooklyn · Block 4258 · Lot 6 · 11208

714 Conduit Boulevard

2 floors · 17,410 sq ft · built 1988 · class H4 · owner of record: Sanraj Inc

8open violations
$14,800ECB/OATH penalties owed
0HPD class C (immediately hazardous)
1165dto Gas piping inspection (2029 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 69 days
Keep the report on file (not filed with DOB)
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1165 days
Next cycle year 2029

Open violations

ECB / OATH (8) · $14,800 owed
IssuedViolationHearingBalance
Aug 6, 2026Unknown CLASS - 1
MISCELLANEOUS VIOLATION OF THE ELECTRICAL CODE TECHNICAL STANDARDS. OBSERVED THAT THE BOILER RM WHERE THREE HUNG BOILERS ARE INSTALLED HAS NO REMOTE SHUTDOWN. M.C. 1006.8.1 REMOTE SHUTDOWN POINTS OF EGRESS NEC
#39199552M
Dec 11, 2026
PENDING
$1,600
Aug 6, 2026Construction CLASS - 1
ATOI OBSERVED THROUGH THE OFFICE REST ROOMS AND IN THE LAUNDRY ROOM PVC FITTINGS/PIPING USED FOR WASTE LINES CONTRARY TO PC 1101.10 - PVC PIPING USED FOR WASTE PIPING WAS OBSERVED CONTRARY TO THE APPROVED INSTA
#39199543K
Dec 11, 2026
PENDING
$2,500
Aug 6, 2026Construction CLASS - 1
ATOI OBSERVED IN THE GARAGE LEVEL MAIN BOILER ROOM NEWLY INSTALLED WALL HUNG BOILERS INSTALLED WITH NO PERMITS ON FILE CHECK BIS/DOBNOW NO PERMITS ON FILE., OBTAIN PERMIT
#39199544M
Dec 11, 2026
PENDING
$2,500
Aug 6, 2026Unknown CLASS - 1
ELECTRICAL WORK WITHOUT A PERMIT. OBSERVED IN THE PARKING GARAGE NEW LIGHTS WITH NEW ARMORED CABLE INSTALLED, AND POWER FOR NEW 3 HUNG GAS BOILERS WITH NEW RECEPTACLES CHECKED BIS / DOB NOW NO PERMIT ON FILE AL
#39199551K
Dec 11, 2026
PENDING
$2,500
Aug 6, 2026Unknown CLASS - 2
FAILURE TO PROVIDE ADEQUATE GROUNDING OF ELECTRICAL SYSTEMS. OBSERVED IN THE WATER METER RM THAT THE MAIN BUILDING WATER GROUND CLAMP IS IN A STATE OF RUSTED/ CORROSION IS NO LONGER MAINTAIN A SOLID GROUND FOR
#39199550Z
Dec 11, 2026
PENDING
$2,400
Aug 6, 2026Construction CLASS - 1
ATOI OBSERVED SPRINKLER HEAD ABOVE THE CEIL DROP TILES BEING OBSTRUCTED AND CAUSING FAULT TO THE SYSTEM OPERATION CONTRARY TO FGC 903.3.3 OBSTRUCTED LOCATIONS IN AUTOMATIC FIRE SPRINKLER SYSTEMS. IT MANDATES TH
#39199542Z
Dec 11, 2026
PENDING
$2,500
Aug 6, 2026Unknown CLASS - 2
UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT, APPARATUS, MATERIALS, DEVICES, APPLIANCES OR WIRING IN USE. OBSERVED ON THE 2ND FL EXTENSION / FLEX CORDS PASSING THRU DOORWAYS IN THE OFFICE FEED FANS AND POW
#39199553Y
Dec 11, 2026
PENDING
$800
Aug 12, 2021Construction CLASS - 2
OBSERVED: AT EXPOSURE # 1, 2, 3 & 4 VARIOUS LOCATION, SEVERAL CRACKS IN BLOCK WALLS, DETACHMENT STUCCO, MISSING MORTAR IN COLUMNS DECORATION., REPAIR AND/OR REPLACE
#39045929L
Dec 15, 2021
DEFAULT
$0
DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Aug 6, 2026ECBUnknown: MISCELLANEOUS VIOLATION OF THE ELECTRICAL CODE TECHNICAL STANDARDS. OBSERVED THAT THE BOILER RM WHERE THREE HUNG BOILERS ARE INSTALLED HAS NO REMOTE SHUTDOWN. M.C. 1006.8.1 REMOTE SHUTDOWN POINTS OF EGRESS NECOpen
Aug 6, 2026ECBConstruction: ATOI OBSERVED THROUGH THE OFFICE REST ROOMS AND IN THE LAUNDRY ROOM PVC FITTINGS/PIPING USED FOR WASTE LINES CONTRARY TO PC 1101.10 - PVC PIPING USED FOR WASTE PIPING WAS OBSERVED CONTRARY TO THE APPROVED INSTAOpen
Aug 6, 2026ECBConstruction: ATOI OBSERVED IN THE GARAGE LEVEL MAIN BOILER ROOM NEWLY INSTALLED WALL HUNG BOILERS INSTALLED WITH NO PERMITS ON FILE CHECK BIS/DOBNOW NO PERMITS ON FILE., OBTAIN PERMITOpen
Aug 6, 2026ECBUnknown: ELECTRICAL WORK WITHOUT A PERMIT. OBSERVED IN THE PARKING GARAGE NEW LIGHTS WITH NEW ARMORED CABLE INSTALLED, AND POWER FOR NEW 3 HUNG GAS BOILERS WITH NEW RECEPTACLES CHECKED BIS / DOB NOW NO PERMIT ON FILE ALOpen
Aug 6, 2026ECBUnknown: FAILURE TO PROVIDE ADEQUATE GROUNDING OF ELECTRICAL SYSTEMS. OBSERVED IN THE WATER METER RM THAT THE MAIN BUILDING WATER GROUND CLAMP IS IN A STATE OF RUSTED/ CORROSION IS NO LONGER MAINTAIN A SOLID GROUND FOROpen
Aug 6, 2026ECBConstruction: ATOI OBSERVED SPRINKLER HEAD ABOVE THE CEIL DROP TILES BEING OBSTRUCTED AND CAUSING FAULT TO THE SYSTEM OPERATION CONTRARY TO FGC 903.3.3 OBSTRUCTED LOCATIONS IN AUTOMATIC FIRE SPRINKLER SYSTEMS. IT MANDATES THOpen
Aug 6, 2026ECBUnknown: UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT, APPARATUS, MATERIALS, DEVICES, APPLIANCES OR WIRING IN USE. OBSERVED ON THE 2ND FL EXTENSION / FLEX CORDS PASSING THRU DOORWAYS IN THE OFFICE FEED FANS AND POWOpen