6 floors · 59 apartments · 57,400 sq ft · built 1931 · class D1 · owner of record: 712 Realty Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 46 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 46 days | Annual |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-02-10 (Accepted). Agency page | Dec 31, 2026 in 46 days | 1 of 2 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 62 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 57,400 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 167 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 167 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 290 days | Registered through 2027-09-01 |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 14 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 411 days | Next cycle year 2027 |
| Energy audit and retro-commissioning (2034) Likely applies Local Law 87 · Calendar year 2034 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 7554). Agency page | Dec 31, 2034 in 2968 days | Next due 2034 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Dec 4, 2023 | Construction CLASS - 2 AT TIME OF INSPECTION OBSERVED FACADE IN STATE OF DISREPAIR, CRACKS AT EXP# 1,2 AND 3 AT MULTIPLE LOCATIONS, AT EXP#1 BRICKS DAMAGED ERODED MORTAR JOINTS. ALSO WINDOW LINTELS CORRODED AT MULTIPLE LOCATIONS., MA #39100614X | Aug 27, 2026 IN VIOLATION | $1,250 |
| Issued | Violation | Status |
|---|---|---|
| Jun 23, 2010 | ELEVATOR #9027/341384 | DOB VIOLATION - ACTIVE |
| May 13, 2009 | ELEVATOR #9011/304299 | DOB VIOLATION - ACTIVE |
| Nov 12, 2008 | ELEVATOR #9011/283345 | DOB VIOLATION - ACTIVE |
| Nov 15, 2007 | ELEVATOR #90113225472 | DOB VIOLATION - ACTIVE |
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #36041 | DOB VIOLATION - ACTIVE |
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jun 17, 2026 | C | Apt 5F · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10 SQ.FT AT NORTH WALL AND SOUTH WALL IN THE BATHROOM LOCATED AT APT 5F, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST ORIGINAL VIOLATION 18217448 ISSUED 10-SEP-25 HAS BEEN UPGRADED TO CLASS C PER ADMINIS | Jul 13, 2026 |
| Sep 11, 2025 | C | Apt 5F · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 5F, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Oct 7, 2025 |
| May 1, 2025 | C | Apt 5D · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | May 27, 2025 |
| May 1, 2025 | C | Apt 5D · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | May 27, 2025 |
| Apr 25, 2025 | C | Apt 5D · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | May 21, 2025 |
| Apr 25, 2025 | C | Apt 5D · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | May 21, 2025 |
| Mar 26, 2025 | B | Apt 1J · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 1J, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 30, 2025 |
| Mar 3, 2025 | C | Apt 6G · § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS. | Mar 7, 2025 |
| Mar 3, 2025 | C | Apt 6G · § 27-2056.7 ADM CODE: CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES. | Mar 7, 2025 |
| Apr 18, 2024 | C | Apt 4C · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) BASEBOARD AT EAST WALL, BASEBOARD AT WEST WALL, WEST WALL, 1st WINDOW FRAME FROM SOUTH | May 12, 2024 |
| Aug 9, 2023 | C | Apt 5F · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 5F, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Sep 4, 2023 |
| Feb 28, 2022 | C | Apt 5F · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 5F, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Mar 26, 2022 |
| Aug 11, 2021 | C | Apt 5B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT NORTH WALL 10 SQ. FT., SOUTH WALL 1 SQ. FT., EAST WALL 8 SQ. FT., WEST WALL 10 SQ. FT., AND CEILING 15 SQ. FT. IN THE BATHROOM LOCATED AT APT 5B, 5th STORY, 4th APARTMENT FROM NORTH AT EAST | Sep 6, 2021 |
| Jun 29, 2021 | B | Apt 5B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT THE CEILING , NORTH , EAST AND WEST WALLS . APPROX 25 SQFT IN THE BATHROOM LOCATED AT APT 5B, 5th STORY, 4th APARTMENT FROM NORTH AT EAST | Aug 3, 2021 |
| Oct 16, 2018 | A | Apt 3G · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION CONSISTING OF PARTITION ERECTED, SUB DIVIDING ROOM IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 3G, 3rd STORY, 3rd APARTMENT FROM SOUT | Jan 19, 2019 |
| Oct 16, 2018 | B | Apt 3G · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE COUNTER BALANCE AT LOWER SASH WINDOW , 1ST FROM EAST AT SOUTH IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 3G, 3rd STORY, 3rd APARTMENT FROM SOUTH AT WEST | Nov 20, 2018 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 15, 2026, 1:00 PM ET. BBL 3075540048.