3 floors · 2 apartments · 3,840 sq ft · built 1931 · class S9 · owner of record: Lam, Hin King
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 65 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-11 (Accepted). Agency page | Dec 31, 2026 in 65 days | 1 of 1 without an accepted 2026 report yet |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 309 days | Required only if the owner doesn't live there |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 11 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 430 days | Next cycle year 2027 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| May 5, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35372968R ISSUED ON 12/07/18 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01. FOR: WORK W/O A PERMIT. NOTE: NO RECORD OF CORRECTI #35531083P | Sep 15, 2021 IN VIOLATION | $0 |
| Jan 7, 2020 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT TIME OF INSPECTION IN BEAUTY SALON I OBSERVED ILLEGAL PVC PIPING USED FOR WASTE LINE, REPAIR AND/OR REPLACE #39015366J | May 13, 2020 ADMIT/IN-VIO | $0 |
| May 14, 2019 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION#35372968R ISSUED ON 12/07/18 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.WORK WITHOUT A PERMIT:REM #35398534P | Aug 29, 2019 IN VIOLATION | $0 |
| Mar 16, 2019 | Construction CLASS - 1 FAILURE TO COMPLY W/ THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35372968R ISSUED ON 12/7/18 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01. NOTE:NO DOCUMENT FILE FOR #35391488L | Aug 29, 2019 IN VIOLATION | $0 |
| Dec 7, 2018 | Zoning CLASS - 2 SEC. 73-36 1ST FL OCCUPIED AS AN ADULT PLYSICAL CULTURE ESTABLISHMENT/PHYSICAL CULTURE ESTABLISHMENT DBA "AMY WU BEAUTY SPA"W/O BSA APPROVALAS REQUIRED PER ZR 12-10. REMEDY: DISCONTINUE ILLEGAL USE. #35372969Z | Jun 10, 2019 IN VIOLATION | $0 |
| Dec 7, 2018 | Construction CLASS - 1 WORK W/O A PERMIT. NOTED: AT 1ST FL ERECTED FULL HEIGHT PARTITIONS CREATING ROOMS INSTALLED WATER & WASTE LINES FOR WASHING MACHINE,SINK & WALL MOUNTED AC UNIT W/ELECTRICAL WORK/WIRING PERFORMED LIGHTS,SWITCHES #35372968R | Jun 10, 2019 IN VIOLATION | $0 |
None open.
None open.
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 27, 2026, 5:28 PM ET. BBL 3061840044.