3 floors · 3 apartments · 2,920 sq ft · built 1970 · class C0 · owner of record: Lopez, Lisette
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 68 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 68 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 84 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1164 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jan 7, 2026 | Construction CLASS - 3 FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. EXISTING CURB CUT HAS BEEN EXTENDED WITHOUT DOB APPROVAL AS REQUIRED BY BC 3202.2.2.4 AND DOT SPEC., CREATING A HAZARD TO PEDESTRIANS. OBSERVED CURB CUT #39172943J | May 26, 2026 DEFAULT | $500 |
| May 29, 2025 | Construction CLASS - 1 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER IN SUMMONS#35414280L ISSUED ON 08/12/2021, FOR WORK AT 1ST FLOOR: ERECTED PARTITIONS WITH DOORS TO CREATE ROOMS. INSTALLED WATER & WASTE LINES FOR 3(PC) BATHROOM, RES #39149315N | Aug 5, 2025 DEFAULT | $25,000 |
| Jan 31, 2022 | Construction CLASS - 1 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35414280L ISSUED 08/12/21 AND FILE CERTIFICATE OF CORRECTION PURSUANT TO 18-201.1 AND 1RCNY 102-01 WORK W/O PERMIT.NOTED:AT FIRST FLOO #35563541J | Oct 4, 2022 IN VIOLATION | $0 |
| Nov 23, 2021 | Construction CLASS - 1 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35414280L ISSUED 8/12/21 AND FILE CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.WORK W/O PERMIT AT 1ST FL & CELLAR L #35564338Z | Oct 4, 2022 IN VIOLATION | $2,500 |
| Aug 12, 2021 | Construction CLASS - 1 WORK WITHOUT PERMIT. NOTED: AT FIRST FLOOR ERECTED FULL HEIGHT PARTITION WITH DOORS TO CREATE ROOMS. INSTALLED WATER ANS WASTE LINES TO 3 PIECE BATHROOM (SINK, SHOWER AND TOILET. RESIDENTIAL SINK AND GAS LINE T #35414280L | Oct 4, 2022 IN VIOLATION | $2,500 |
| Aug 12, 2021 | Unknown CLASS - 2 RESIDENCE CONVERTED, MAINTAINED OR OCCUPIED AS A DWELLILNG FOR MORE THAN THE LEGALLY APPROVED NUMBER OF FAMILIES AUTHORIZED BY THE C OF O OR OFFICIAL DEPARTMENT RECORDS. DEPARTMENT OF BUILDINGS RECORDS C OF O #35414281N | Dec 6, 2022 DEFAULT | $10,000 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 5) | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 24, 2026, 5:08 AM ET. BBL 4036870044.