2 floors · 4,176 sq ft · built 1978 · class M9 · owner of record: Cong Mikveh Israel Of Kewgardens Hls Inc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 64 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 64 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (4 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-11-11 (Accepted). Agency page | Dec 31, 2026 in 64 days | 4 of 4 without an accepted 2026 report yet |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jan 24, 2025 | Construction CLASS - 1 AT TIME OF INSPECTION OF I OBSERVED A PROPOSED A 2 STORY ALT BUILDING. UPON INSPECTING OBSEREVD GC UNLAWFULLY CONTINUED WORK WHILE ON A NOTICE OF A SWO. INITIAL SWO INDICATED NO USE OF SUPPORTED SCAFFOLD AND EX #39536261R | Nov 18, 2025 IN VIOLATION | $5,000 |
| Dec 17, 2024 | Construction CLASS - 2 AT TIME OF INSPECTION I OBERSERVED A 2 STORY ALTERATION BUILDING. UPON INSPECTING OBSERVED SCAFFOLD NOT PROPERLY MAINTAINED AS PER CODE. OBSERVED MISSING MID RAILS, TOP RAILS, AND TOE BOARDS ALONG WITH LOOSE PL #39535200Z | May 20, 2025 IN VIOLATION | $625 |
| Aug 15, 2022 | Construction CLASS - 1 OBSERVED: UPON INSPECTION ON ACTIVE SITE UNDER OPEN JOB # Q00447739 WAS FOUND NO COMPETENT PERSON OR CONSTRUCTION SUPERINTENDENT ON SITE PROVIDE SUPERINTENDENT OR COMPETENT PERSON #39505054M | Apr 25, 2023 IN VIOLATION | $625 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 8) | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 28, 2026, 8:53 AM ET. BBL 4066580034.