2 floors · 3 apartments · 2,448 sq ft · built 1920 · class C0 · owner of record: Brunner, Perish
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 44 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 44 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 60 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 288 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 775 days | Next cycle year 2028 |
None open.
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Nov 2, 2026 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM | Nov 8, 2026 |
| Nov 2, 2026 | B | Apt BSMT · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT BSMT-APT BSMT, 1st BSMT-APT FROM SOUTH AT WEST | Dec 7, 2026 |
| Nov 2, 2026 | A | Apt BSMT · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT BSMT-APT BSMT, 1st BSMT-APT FROM SOUTH AT WEST | Feb 5, 2027 |
| Nov 2, 2026 | A | Apt BSMT · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL AND CEILING IN THE BATHROOM LOCATED AT BSMT-APT BSMT, 1st BSMT-APT FROM SOUTH AT WEST | Feb 5, 2027 |
| Nov 2, 2026 | C | Apt BSMT · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT BSMT-APT BSMT, 1st BSMT-APT FROM SOUTH AT WEST | Nov 28, 2026 |
| Nov 2, 2026 | A | Apt BSMT · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM NORTH, THE FOYER , THE BATHROOM LOCATED AT BSMT-APT BSMT, 1st BSMT-APT FROM SOUTH AT WEST | Feb 5, 2027 |
| Nov 2, 2026 | C | Apt BSMT · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT BSMT-APT BSMT, 1st BSMT-APT FROM SOUTH AT WEST | Nov 1, 2026 |
| Feb 15, 2023 | C | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CEMENT TREADS 1ST, 2ND, 3RD, AND 4TH TREAD UP FROM BOTTOM AT BUILDING FRONT | Feb 21, 2023 |
| Date | Source | What | Now |
|---|---|---|---|
| Nov 2, 2026 | HPD C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM | Open |
| Nov 2, 2026 | HPD B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT BSMT-APT BSMT, 1st BSMT-APT FROM SOUTH AT WEST | Open |
| Nov 2, 2026 | HPD A | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT BSMT-APT BSMT, 1st BSMT-APT FROM SOUTH AT WEST | Open |
| Nov 2, 2026 | HPD A | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL AND CEILING IN THE BATHROOM LOCATED AT BSMT-APT BSMT, 1st BSMT-APT FROM SOUTH AT WEST | Open |
| Nov 2, 2026 | HPD C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT BSMT-APT BSMT, 1st BSMT-APT FROM SOUTH AT WEST | Open |
| Nov 2, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM NORTH, THE FOYER , THE BATHROOM LOCATED AT BSMT-APT BSMT, 1st BSMT-APT FROM SOUTH AT WEST | Open |
| Nov 2, 2026 | HPD C | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT BSMT-APT BSMT, 1st BSMT-APT FROM SOUTH AT WEST | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 17, 2026, 3:13 PM ET. BBL 2025620028.