Manhattan · Block 1208 · Lot 1 · 10025

705 Columbus Avenue

26 floors · 246 apartments · 374,550 sq ft · built 1968 · class D6 · owner of record: Syracuse Leasing Limited Liability Compa Ny

15open violations
$12,500ECB/OATH penalties owed
0HPD class C (immediately hazardous)
61dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 61 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 61 days
Annual
Annual boiler inspection (3 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-19 (Accepted). Agency page

Dec 31, 2026
in 61 days
1 of 3 without an accepted 2026 report yet
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 77 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 374,550 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 182 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 182 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 305 days
Registered through 2027-09-01
Facade inspection report (Cycle 10B) Applies
Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $100,000 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2028
in 478 days
No Cycle 10 report on record yet
Energy audit and retro-commissioning (2028) Likely applies
Local Law 87 · Calendar year 2028
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1208). Agency page

Dec 31, 2028
in 792 days
Next due 2028
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1157 days
Next cycle year 2029

Open violations

ECB / OATH (1) · $12,500 owed
IssuedViolationHearingBalance
Dec 21, 2023Construction CLASS - 1
28-323.1 FAILURE TO MAINTAIN STRUCTURE IN SAFE CONDITION. NOTE:- OBSERVED ON AN OCCUPIED PARKING STRUCTURE CONSISTING OF 2 LEVEL, CELLAR ANDSUB-CELLAR-2, SPALLED CONCRETE FROM BEAM AND SLAB, EXPOSED RE-BAR, VIS
#35675599Z
Feb 29, 2024
DEFAULT
$12,500
DOB (1)
IssuedViolationStatus
Dec 21, 2023CONSTRUCTION
EMERGENCY WORK ORDER ACTIVE PARKING STRUCTURE CONSISTING OF 2 LEVELS CELLAR&SUB CELLAR SPALLED CONCRETE/EXPOSE REBAR.VISIBLE CORROSION&@ SEVERAL LOC.BOTH LEVEL.IMMED.HAZARD TO TRAFFIC.REMEDY:RETAIN NYS REG DESIGN PROF.TO DIRECT&SUPERV.IMMED.INSTALL.OF SAFETY MESURES.STABLIZIN CONCRETE MEMEBERS OR PR
#LL10701MK
DOB VIOLATION - ACTIVE
DOB NOW Safety (6)
IssuedViolationStatus
Sep 18, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle B (premises is in Community District 7)
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction
Active
HPD (7) · C 0 · B 1 · A 6
IssuedClassViolationCorrect by
Oct 2, 2023BApt 2A · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR INOPERABLE IN THE ENTIRE APARTMENT LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTNov 6, 2023
Mar 16, 2021AApt 12D · § 27-2005 ADM CODE REFIT GLASS TERRACE DOORS IN THE 3rd ROOM FROM NORTH LOCATED AT APT 12D, 12th STORY, 1st APARTMENT FROM WEST AT NORTHJun 19, 2021
Oct 17, 2014AApt 21H · SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILINGS AND ALL WALLS AND TRIM THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT 21H, 21st STORYJan 20, 2015
Oct 17, 2014AApt 21H · SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 21H, 21st STORYJan 20, 2015
Aug 7, 2013AApt 3J · SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE REGLAZE BATHTUB IN THE BATHROOM LOCATED AT APT 3J, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTHNov 10, 2013
Aug 7, 2013AApt 3J · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 3J, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTHNov 10, 2013
Sep 1, 2009AApt 15D · SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ceilings and walls IN THE ENTIRE APARTMENT LOCATED AT APT 15D, 15th STORY, 1st APARTMENT FROM WEST AT NORTHDec 5, 2009

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 31, 2026, 6:57 AM ET. BBL 1012080001.

Look up another building