4 floors · 18 apartments · 12,040 sq ft · built 1912 · class C1 · owner of record: Crotona Thorpe Hdfc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 61 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 61 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 61 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 77 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-07-10 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jun 20, 2025 | Construction CLASS - 1 FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY. OBSERVED FIRE ESCAPE DROP LADDER OBSTRUCTED WITH SCAFFOLD METAL MESH AND WOOD MATERIAL COVERING AND BLACK GARDENING GATE. LOCATED AT EXPOSURE 4. POTENTIAL HAZARD #39151664Y | Aug 29, 2025 IN VIOLATION | $625 |
| Jun 20, 2025 | Construction CLASS - 2 B263 FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER TO FILE A CERT.OF CORRECTION WITH THE DEPT.OF BUILDINGS FOR VIOLATION #39019185Z REMEDY: FILE A CERTIFICATE OF CORRECTION #39151562N | Aug 29, 2025 IN VIOLATION | $1,250 |
| Dec 9, 2024 | Construction CLASS - 1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. CONTAINED IS SUMMONS/ VIOLATING 39050836K ISSUED ON 11/01/2021 AND TO FILE CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01., COMPLY WI #39132384X | Apr 2, 2025 IN VIOLATION | $2,500 |
| Dec 9, 2024 | Construction CLASS - 1 FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY. OBSERVED STORAGE IN THE PASSAGEWAY AND EXIT DOOR BLOCKED WITH SCAFFOLD., REMOVE OBSTRUCTION #39132373K | Sep 5, 2025 IN VIOLATION | $1,250 |
| Dec 9, 2024 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: USE OF PROHIBITED DOOR AND/OR HARDWARE PER BC 1008.1 (2014 CODE); 27-371; BC 1008.1.9 (2014 CODE); BC 1010.1.8 (2022 CODE); BC 1010.1.9 (2022 CODE). OBSERV #39132374M | Sep 5, 2025 IN VIOLATION | $1,250 |
| Dec 9, 2024 | Construction CLASS - 1 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS. OBSERVED SIDE WALK SHED INCORRECTLY JOGS AROUND THE EXISTING FIRE ESCAPE(S) BUT DOES NOT PROVIDE ADEQUATE OVERHEAD PROTECTION #39132411M | Feb 21, 2025 IN VIOLATION | $2,500 |
| Dec 9, 2024 | Construction CLASS - 2 OBSERVED NO SPRINKLER HEADS IN THE LAUNDRY ROOM THAT HOUSES 2 GAS FIRED COMMERCIAL DRYERS. AS PER 903.2.11 OF THE BUILDING CODE AN AUTOMATIC SPRINKLER SYSTEM SHALL BE INSTALLED IN SPACES IN WHICH TWO OR MORE CL #39132353N | Feb 21, 2025 STIPULATION/IN-VIO | $625 |
| Nov 1, 2021 | Construction CLASS - 2 NOTED: OBSERVED AT ROOF LEVEL, PARAPET WALL AT NORTH ELEVATION HAS A VERTICAL CRACK, ALSO AT EAST ELEVATION STUCCO AROUND CHIMNEY HAS AN APPROXIMATELY 3FT X 2FT SECTION THAT IS SPALLING AND ON THE VERGED OF DET #39050386K | Apr 29, 2022 IN VIOLATION | $0 |
| Mar 9, 2020 | Boilers CLASS - 2 NO MANUAL RESET AGUASTAT ; CORRECT ALL VIOLATING CONDITIONS, SUBMIT A CERTIFICATION OF CORRECTION. #39019185Z | Oct 9, 2020 ADMIT/IN-VIO | $0 |
| May 2, 2019 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG WALLS OR APPURTENANCES.NOTED:AT EXPOSURE #2 AT PARAPET WALL APPROX.10'FT OF THE PARAPET WALL LEANING INWARD TOWARDSROOF ALSO AT EXPOSURE #4 CEMENT STUCCO CRACKED AND SHEDDING AT PARAPET #35381165H | Aug 23, 2019 IN VIOLATION | $0 |
| May 2, 2018 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING WALL(S) OR APPURTENANCES. NOTED: PARAPET WALL IS OFF CENTER LEANING INWARD TOWARD THE ROOF ON EXPOSURE 2 OF BUILDING, CORNER OF EXPOSURE 2 TOWARDS REARYARD FACADE OF BUILDING IS SEP #35325168R | Jul 27, 2018 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Feb 19, 2026 | CONSTRUCTION OBSERVED UNMAINTAINED EXTERIOR STRUCTRUAL PARAPET WALL AT EXPOSURE-2 CRACKED AND LEANING. CORNER PARAPET OF EXPO 1-2 CRACKED AND BULGING. EXPO-4 BULKHEAD CRACKED AND MISSING STUCCO. REQUESTING DRAWINGS/PERMITS FILED AS PER CODE. ENGINEERS' REPORT FOR STRUCTURAL STABILITY REQUIRED TO ENSURE SAFETY OF #26-00543 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jun 3, 2022 | B | Apt 2D · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jul 8, 2022 |
| Jun 3, 2022 | B | Apt 3A · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3A, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Jul 8, 2022 |
| May 24, 2022 | B | Apt 2A · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Jun 28, 2022 |
| May 24, 2022 | B | Apt 1A · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Jun 28, 2022 |
| May 24, 2022 | B | Apt 3B · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Jun 28, 2022 |
| May 24, 2022 | B | Apt 1D · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 1D, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH | Jun 28, 2022 |
| May 13, 2022 | C | Apt 4C · § 27-2056.7 ADM CODE: CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES. | May 17, 2022 |
| May 13, 2022 | C | Apt 4C · § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS. | May 17, 2022 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 31, 2026, 5:03 AM ET. BBL 2031000078.