2 floors · 11,150 sq ft · built 1931 · class E9 · owner of record: West 1st Developement Corp
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 44 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 775 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jan 4, 2024 | Construction CLASS - 1 UNLAWFUL ACTS. FAILURE TO COMPLY TO COMMISSIONER'S ORDER. NOTE: RESPONDENT FAILURE TO ENGAGE NYS LICENSED P.E. EXPERIENCED WITH MONOPOLE SIGN STRUCTURES TO INSPECT THE MONOPOLE SIGN STRUCTURE, P.E. REPORT WAS T #35679801L | Apr 19, 2024 IN VIOLATION | $0 |
| Sep 25, 2023 | Construction CLASS - 1 UNLAWFUL ACTS FAILURE TO COMPLY WITH COMMISSIONER'S ORDER.OWNER FAILED TO ENGAGE NYS LICENSED P.E. WITH EXPERIENCE INSPECTING MONO POLE SIGN STRUCTURES.REPORT WAS TO BE SUBMITTED TO DOB FORENSIC UNIT WITHIN 60 #35674338X | Apr 12, 2024 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Oct 19, 2023 | CONSTRUCTION COMM'S ORDER APPROX 70' MONOPOLE SIGN STRUCTURE ON LOT. REMEDY: OWNER TO IMMEDIATELY ENGAGE A NYS PE EXPERIENCED W/MONOPOLE SIGN STRUCTURES TO INSPECT STRUCTURE INCLUDING VISUAL INSP. ENGINEERING & MATERIALS TESTING EVALUATION OF ALL COMPONENTS OF STRUCTURE & FOUNDATION ETC IMMEDIATELY NOTIFY DOB OF #23-02935 | DOB VIOLATION - ACTIVE |
| Mar 27, 2023 | CONSTRUCTION THERE IS AN APPROX 70FT.HIGH MONOPOLE SIGN STRUCTURE ON LOT.OWNER TO IMMED ENGAGE A NYS LIC PE EXP W/MONOPOLE SIGN STRCTRE&FOUNDTN,ETC FORENSICENG@BUILDINGS.NYC.GOV #FEU20109PS | DOB VIOLATION - ACTIVE |
| Apr 11, 2016 | CONSTRUCTION FM. PER PROFESSIONAL ENG'R R. LEWIS'S REPORT DATED 7/9/2015 THE MONOPOLE SIGN STRUCTURE ON LOT NEEDS STRUCTURAL REPAIR & REINFORCEMENT AS OF 4/11/2016 NO PERMIT HAS BEEN OBTAINED FOR THE NEEDED WORK REMEDY:OWNER TO OBTAIN PERMIT FOR NEEDED REPAIRS. START REPAIR WORK UNDER PERMIT NO LATER THAN 4/25/2 #FEU20101PS | DOB VIOLATION - ACTIVE |
| Dec 14, 2015 | CONSTRUCTION FAILURE TO CORRECT UNLAWFUL ARETERIAL DOUBLE FACED MONOPOLE SIGN STRUCTURE WITH"STANDARD WATER PROOFUS" COPY ON BOTH FACES THAT EXCEED THE SURFACE AREA & HEIGHT LIMITS IN AN M1-2 ZONE. ACCESSORY SIGN STRUCTURE PERMITS #SGSPO18CH | DOB VIOLATION - ACTIVE |
| Feb 2, 2015 | CONSTRUCTION APPROX 70FT HIGH MONOPOLE SIGN STRUCTURE ON LOT.OWNER TO IMMEDIATELY ENGAGE NYS LICENSED PE EXPERIENCED WITH MONOPOLE SIGN STRUCTURES TO INSPECT THE MONOPOLE SIGN STRUCTURE INCLUDING VISUAL INSPECTION ENGINEERING & MATERIALS TESTING EVALUATION OF ALL THE COMPONENT OFTHE SIGN STRUCTURE & FOUNDATION E #FEU20107PS | DOB VIOLATION - ACTIVE |
| Dec 7, 2013 | CONSTRUCTION (28-502.4)UNREG #SGSTF05JP | DOB VIOLATION - ACTIVE |
| Apr 19, 2001 | CONSTRUCTION #0102JP | DOB VIOLATION - ACTIVE |
| Jan 22, 2001 | CONSTRUCTION #ZSTF05AC | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 1) | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 17, 2026, 7:52 PM ET. BBL 2025630015.