5 floors · 87,629 sq ft · built 2013 · class W9 · owner of record: Nyc School Construction Authority
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 64 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 87,629 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 185 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 185 days | Annual filing |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1160 days | Next cycle year 2029 |
| Energy audit and retro-commissioning (2031) Likely applies Local Law 87 · Calendar year 2031 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 5321). Agency page | Dec 31, 2031 in 1890 days | Next due 2031 |
| Annual boiler inspection (6 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-09-15 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jun 11, 2026 | Construction CLASS - 2 REISSUE ECB#35693221X FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:AT 2ND FL HALLWAY SMOKE DOOR NEAR RM 219 1ST FL HALLWAY SMOKE DOORS NEAR RM 114 BASEMENT GYM RM C4 DOORS ARE IN DISREPAIR/RACKED #35734309Z | Jul 15, 2026 POP/IN-VIO | $0 |
| Jun 11, 2026 | Construction CLASS - 2 REISSUE ECB#35693224L FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:AT 4TH FL MAIN OFFICE RM 420 EXTERIOR/WINDOW CRACKED.REM:REPAIR AND/OR REPLACE. #35734307P | Jul 15, 2026 POP/IN-VIO | $0 |
| Jun 11, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:AT BASEMENT ELECTRIC METER RM WITH STORAGE OF MULTIPLE VARIOUS ITEMS LADDERS,BOXES,CHAIRS,ETC.REM:COMPLY WITH CODE. #35734310X | Jul 15, 2026 POP/IN-VIO | $0 |
| Jun 11, 2026 | Construction CLASS - 2 REISSUE ECB#35693222H FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS AS PER BC 1006.1;27-381.NOTED:AT 3RD FL STAIR A,HALLWAY BASEMENT CAFETERIA #35734308R | Jul 15, 2026 POP/IN-VIO | $0 |
| Apr 30, 2025 | Construction CLASS - 2 RE-ISSUE #35689083P. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: SEVERAL OF THE CROSS CORRIDOR SMOKE DOORS ARE NOT OPERATING PROPERLY. THE ELECTRONIC/MAGNETIC RELEASE SYSTEM IS NOT WORKING. DO #35693221X | Jun 27, 2025 POP/IN-VIO | $0 |
| Apr 30, 2025 | Construction CLASS - 2 RE-ISSUE #35689082N. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC DISCHARGES ASPER BC 1006.1; 27-381. NOTED: SEVERAL EXIT SIGNS SCATTERED THRU THE SC #35693222H | Jun 27, 2025 POP/IN-VIO | $0 |
| Apr 30, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: SEVERAL WINDOWS SCATTERED ABOUT THE 4TH FLOOR WITH CRACKED GLASS AND CAUSING WATER INFILTRATION WHEN RAINING. REMEDY: REPAIR/REPLACE CRACKED GLASS. #35693224L | Jun 27, 2025 POP/IN-VIO | $0 |
| Sep 6, 2024 | Construction CLASS - 2 REISSUED ECB#35672623X FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOR EXIT,EXIT DISCHARGES AND PUBLIC CORRIDORS.NOTED:EXIT SIGNS NOT ILLUMINATED WHEN TESTED 3RD FLOOR EXIT SIGN NEXT TO S #35689082N | Feb 5, 2025 POP/IN-VIO | $0 |
| Sep 6, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:AUTOMATIC CLOSING SMOKE DOORS NOT WORKING PROPERLY ON THE 2ND FLOOR AND THE 1ST FLOOR.REM:REPAIR OR REPLACE. #35689083P | Feb 5, 2025 POP/IN-VIO | $0 |
| May 25, 2023 | Construction CLASS - 2 REISSUE#35657945N FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER:ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED:THE EXIT SIGNS AT THIRD FLOOR LEVEL,NEXT TO ROOM 30 #35672623X | Sep 6, 2023 POP/IN-VIO | $0 |
| Jun 6, 2022 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER ILLUMINATION FOR EXITS EXIT DISCHARGES & PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED:EXIT SIGN AT 3RD FLOOR LEVEL BY 309 AT STAIR C CELLAR LEVEL GYMNASIUM E #35657945N | Nov 2, 2022 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jan 13, 1997 | LOCAL LAW 10/81 - ELEVATOR #03322 | DOB VIOLATION - ACTIVE |
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #28474 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 28, 2026, 8:18 AM ET. BBL 3053210064.