Manhattan · Block 868 · Lot 36 · 10016

70 Park Avenue

15 floors · 83,000 sq ft · built 1928 · class HB · owner of record: Ponte Gadea Park, Llc

2open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
62dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 62 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 62 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 83,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 183 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 183 days
Annual filing
Facade inspection report (Cycle 10B) Applies
Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $25,500 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2028
in 479 days
No Cycle 10 report on record yet
Energy audit and retro-commissioning (2028) Likely applies
Local Law 87 · Calendar year 2028
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 868). Agency page

Dec 31, 2028
in 793 days
Next due 2028

Open violations

ECB / OATH (1)
IssuedViolationHearingBalance
Nov 3, 2025Unknown CLASS - 2
BC 3307..2.1 AT TIME OF INSPECTION I OBSERVED MAKE SHIFT RAMP PLACED ON SIDEWALK CONNECTED TO THE ENTRANCE OF THE BUILDING IN USE FOR DELIVERY OPERATION AT EXPOSURE #2 , UPON REQUEST FOR DOT PERMIT OBTAIN FOR
#39546603R
Jan 8, 2026
ADMIT/IN-VIO
$0
DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (1) · C 0 · B 0 · A 1
IssuedClassViolationCorrect by
Apr 29, 2026A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Aug 2, 2026

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 30, 2026, 12:54 PM ET. BBL 1008680036.

Look up another building