6 floors · 135 apartments · 110,000 sq ft · built 1927 · class D4 · owner of record: Hillcrest Owners Assoc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 70 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 70 days | Annual |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-04-30 (Accepted). Agency page | Dec 31, 2026 in 70 days | 1 of 1 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 86 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 110,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 191 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 191 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 801 days | Next cycle year 2028 |
| Energy audit and retro-commissioning (2032) Likely applies Local Law 87 · Calendar year 2032 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1282). Agency page | Dec 31, 2032 in 2262 days | Next due 2032 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Oct 1, 2015 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT #11490 | DOB VIOLATION - ACTIVE |
| Jun 10, 2015 | ELEVATOR ANNUAL INSPECTION / TEST VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2014 INSPECTION/TEST #02182 | DOB VIOLATION - ACTIVE |
| Jun 10, 2015 | ELEVATOR ANNUAL INSPECTION / TEST VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2014 INSPECTION/TEST #02183 | DOB VIOLATION - ACTIVE |
| Oct 31, 2014 | ELEVATOR ANNUAL INSPECTION / TEST VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2013 INSPECTION/TEST #02402 | DOB VIOLATION - ACTIVE |
| Mar 31, 2014 | ELEVATOR ANNUAL INSPECTION / TEST VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2012 INSPECTION/TEST #04328 | DOB VIOLATION - ACTIVE |
| Mar 31, 2014 | ELEVATOR ANNUAL INSPECTION / TEST VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2012 INSPECTION/TEST #04329 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Oct 2, 2023 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction | Active |
| Oct 2, 2023 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction | Active |
| Oct 1, 2015 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT | Active |
| Jun 10, 2015 | Elevators EVCAT1 | Active |
| Jun 10, 2015 | Elevators EVCAT1 | Active |
| Oct 31, 2014 | Elevators EVCAT1 | Active |
| Mar 31, 2014 | Elevators EVCAT1 | Active |
| Mar 31, 2014 | Elevators EVCAT1 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Feb 3, 2025 | B | Apt F14 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT F14, 6th STORY, 3rd APARTMENT FROM WEST AT NORTH | Mar 10, 2025 |
| Jan 17, 2025 | B | Apt E9 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT E9, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH | Feb 21, 2025 |
| Jan 17, 2025 | B | Apt D2 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT D2, 4th STORY, 3rd APARTMENT FROM NORTH AT EAST , SECTION '' | Feb 21, 2025 |
| Jan 17, 2025 | B | Apt C12 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT C12, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ' | Feb 21, 2025 |
| Jan 17, 2025 | B | Apt C4 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT C4, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Feb 21, 2025 |
| Jan 17, 2025 | B | Apt B3 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT B3, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION '' | Feb 21, 2025 |
| Jan 17, 2025 | B | Apt A4 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT A4, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION '' | Feb 21, 2025 |
| Jan 9, 2025 | C | Apt A4 · § 27-2056.7 ADM CODE: CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES. | Jan 13, 2025 |
| Jan 9, 2025 | C | Apt A4 · § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS. | Jan 13, 2025 |
| Oct 17, 2023 | C | Apt C11 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT C11, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 12, 2023 |
| Oct 17, 2023 | B | Apt C11 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILINGS AND ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT APT C11, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 21, 2023 |
| Oct 17, 2023 | B | Apt C11 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF BEDBUGS IN THE ENTIRE APARTMENT LOCATED AT APT C11, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 21, 2023 |
| Oct 17, 2023 | C | Apt C11 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT C11, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 12, 2023 |
| Jan 23, 2023 | B | Apt F7 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT F7, 6th STORY, 3rd APARTMENT FROM EAST AT SOUTH , 1st SECTIO | Feb 27, 2023 |
| Jan 19, 2023 | B | Apt C19 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT C19, 3rd STORY, 3rd APARTMENT FROM NORTH AT EAST , 1st SECTI | Feb 23, 2023 |
| Jan 19, 2023 | B | Apt C15 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT C15, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTI | Feb 23, 2023 |
| Jan 19, 2023 | B | Apt C9 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT C9, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH , 1st SECTIO | Feb 23, 2023 |
| Jan 19, 2023 | B | Apt C3 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT C3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , 1st SECTIO | Feb 23, 2023 |
| Jan 19, 2023 | B | Apt B10 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT B10, 2nd STORY, 3rd APARTMENT FROM WEST AT NORTH , 1st SECTI | Feb 23, 2023 |
| Jan 19, 2023 | B | Apt F9 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT F9, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH , 1st SECTIO | Feb 23, 2023 |
| Jan 19, 2023 | B | Apt B4 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT B4, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST , 1st SECTIO | Feb 23, 2023 |
| Jan 19, 2023 | B | Apt B2 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT B2, 2nd STORY, 3rd APARTMENT FROM NORTH AT EAST , 1st SECTIO | Feb 23, 2023 |
| Jan 19, 2023 | B | Apt A20 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT A20, 1st STORY, 4th APARTMENT FROM NORTH AT EAST , 1st SECTI | Feb 23, 2023 |
| Jan 19, 2023 | B | Apt A18 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT A18, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST , 1st SECTI | Feb 23, 2023 |
| Jan 19, 2023 | B | Apt E22 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT E22, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH , 1st SECTI | Feb 23, 2023 |
| Jan 19, 2023 | B | Apt E21 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT E21, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH , 1st SECTI | Feb 23, 2023 |
| Jan 19, 2023 | B | Apt E12 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT E12, 5th STORY, 1st APARTMENT FROM NORTH AT EAST , 1st SECTI | Feb 23, 2023 |
| Jan 19, 2023 | B | Apt E11 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT E11, 5th STORY, 4th APARTMENT FROM WEST AT NORTH , 1st SECTI | Feb 23, 2023 |
| Jan 19, 2023 | B | Apt D22 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT D22, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH , 1st SECTI | Feb 23, 2023 |
| Jan 19, 2023 | B | Apt D21 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT D21, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , 1st SECTI | Feb 23, 2023 |
| Jan 19, 2023 | B | Apt D12 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT D12, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , 1st SECTI | Feb 23, 2023 |
| Jan 19, 2023 | B | Apt C23 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT C23, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST , 1st SECTI | Feb 23, 2023 |
| Jan 19, 2023 | B | Apt A10 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT A10, 1st STORY, 3rd APARTMENT FROM WEST AT NORTH , 1st SECTI | Feb 23, 2023 |
| Jul 19, 2021 | C | Apt F18 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) CEILING, EAST WALL IN THE KITCHEN LOCATED AT APT F18, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST | Aug 12, 2021 |
| Jul 14, 2021 | B | Apt F4 · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE LOCATED AT APT F4, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''WEST'' | Aug 18, 2021 |
| Jul 14, 2021 | B | Apt F5 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING & SOUTH WALL IN THE KITCHEN LOCATED AT APT F5, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT WEST | Aug 18, 2021 |
| Jul 14, 2021 | C | Apt C2 · § 27-2005, 2007, 204.1 HMC CODE: ARRANGE AND MAKE SELF-CLOSING THE DOORS .. IN THE ENTRANCE LOCATED AT APT C2, 3rd STORY, 3rd APARTMENT FROM NORTH AT EAST , SECTION AT WEST | Aug 9, 2021 |
| Jul 14, 2021 | C | § 27-2005, 2007, 204.1 HMC CODE: ARRANGE AND MAKE SELF-CLOSING THE DOORS SECTION FIRE EXIT AT PUBLIC HALL, 3rd STORY, SECTION ''EAST'' | Aug 9, 2021 |
| Jul 14, 2021 | B | Apt F4 · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE LOCATED AT APT F4, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''WEST'' | Aug 18, 2021 |
| Mar 22, 2021 | C | Apt E12 · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT , IN THE ENTIRE APARTMENT LOCATED AT APT E12, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 26, 2021 |
| Mar 22, 2021 | C | Apt E3 · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT , IN THE ENTIRE APARTMENT LOCATED AT APT E3, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Mar 26, 2021 |
| Mar 22, 2021 | C | Apt E2 · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT , IN THE ENTIRE APARTMENT LOCATED AT APT E2, 5th STORY, 3rd APARTMENT FROM NORTH AT EAST | Mar 26, 2021 |
| Mar 22, 2021 | C | Apt C15 · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT , IN THE ENTIRE APARTMENT LOCATED AT APT C15, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 26, 2021 |
| Mar 22, 2021 | C | Apt A6 · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT , IN THE ENTIRE APARTMENT LOCATED AT APT A6, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH | Mar 26, 2021 |
| Mar 22, 2021 | C | Apt C10 · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT , IN THE ENTIRE APARTMENT LOCATED AT APT C10, 3rd STORY, 3rd APARTMENT FROM WEST AT NORTH | Mar 26, 2021 |
| Mar 22, 2021 | C | Apt A20 · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT , IN THE ENTIRE APARTMENT LOCATED AT APT A20, 1st STORY, 4th APARTMENT FROM NORTH AT EAST | Mar 26, 2021 |
| Mar 22, 2021 | C | Apt C3 · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT , IN THE ENTIRE APARTMENT LOCATED AT APT C3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Mar 26, 2021 |
| Mar 22, 2021 | C | Apt C24 · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT , IN THE ENTIRE APARTMENT LOCATED AT APT C24, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Mar 26, 2021 |
| Mar 22, 2021 | C | Apt D21 · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT , IN THE ENTIRE APARTMENT LOCATED AT APT D21, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Mar 26, 2021 |
| Mar 22, 2021 | C | Apt D22 · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT , IN THE ENTIRE APARTMENT LOCATED AT APT D22, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Mar 26, 2021 |
| Mar 19, 2021 | C | Apt D12 · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT D12, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , 1st SECT | Mar 23, 2021 |
| Mar 19, 2021 | C | Apt A3 · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT A3, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , 1st SECTI | Mar 23, 2021 |
| Mar 19, 2021 | C | Apt A9 · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT A9, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH , 1st SECTI | Mar 23, 2021 |
| Mar 19, 2021 | C | Apt A10 · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT A10, 1st STORY, 3rd APARTMENT FROM WEST AT NORTH | Mar 23, 2021 |
| Mar 19, 2021 | C | Apt B4 · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT B4, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , 1st SECTI | Mar 23, 2021 |
| Mar 19, 2021 | C | Apt B7 · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT B7, 2nd STORY, 3rd APARTMENT FROM EAST AT SOUTH , 1st SECTI | Mar 23, 2021 |
| Mar 19, 2021 | C | Apt B10 · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT B10, 2nd STORY, 3rd APARTMENT FROM WEST AT NORTH , 1st SECT | Mar 23, 2021 |
| Mar 19, 2021 | C | Apt C7 · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT C7, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH , 1st SECTI | Mar 23, 2021 |
| Mar 19, 2021 | C | Apt C9 · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT C9, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH , 1st SECTI | Mar 23, 2021 |
| Mar 19, 2021 | C | Apt D5 · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT D5, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , 1st SECTI | Mar 23, 2021 |
Showing 60 of 146. Full list on the agency site.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 22, 2026, 12:33 PM ET. BBL 4012820175.