2 floors · 21,850 sq ft · built 1923 · class K2 · owner of record: 699 Mp Realty Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 50 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 11 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 415 days | Next cycle year 2027 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 24, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED AT EXPOSURE 1(FRONT)&4(RIGHT) FACADE PARAPET CONCRETE CAPPING CRACKING, MISSING MORTAR IN BRICKS, DETERIORATING AND LOOSE BRICK., REPAIR AND/OR RE #39091058M | Sep 29, 2023 DEFAULT | $0 |
| Mar 26, 2021 | Construction CLASS - 1 I OBSERVED IN THE GAS METER ROOM UNDER DUNKIN DONUTS VENT FRESH AIR IN GAS METER ROOM IS GOING INTO THE EXISTING BUILDING CHIMNEY. GAS METER ROOM THERE IS A GAS BYPASS FUTURE ON GAS LINE. IN ANTHONY'S PIZZA STO #39038391N | Jul 23, 2021 IN VIOLATION | $0 |
| Mar 26, 2021 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLAINT MANNER I OBSERVED IN DUNKIN DONUTS BASEMENT USING PVC WASTE LINE IN COMMERCIAL SPACE. ALSO USING FERNCO COUPLINGS ON WASTE LINE ALSO HAVING AN OPEN SEWER LINE, REP #39038392P | Jul 23, 2021 IN VIOLATION | $0 |
| Jul 20, 2018 | Construction CLASS - 2 WORK W/OUT A PERMIT,ILLEGAL ILLUMINATED SIGNS INSTALLED(SANAQ CAFE)(SYMBOL FOR HOOKAH) W/ LED LIGHTS ALSO. REM: OBTAIN PERMITS. #35342556N | Sep 7, 2018 DEFAULT | $0 |
| Jul 20, 2018 | Construction CLASS - 2 WORK W/OUT A PERMIT, ILLEGAL ILLUMINATED SIGN(SANAA CAFE)INSTALLED W/ LED LIGHTS. REM: OBTAIN PERMIT. #35342557P | Sep 7, 2018 DEFAULT | $0 |
| Jan 28, 2014 | Construction CLASS - 2 ALTERED/CHANGED BLDG OCCUPIED W/O A VALID C OF O. AS PER ALT #164-42 APPROVED PLANS - DRAWING #1 (EXISTING AUDITORIUM PRESENT CAPACITY 1260 SEATS. NEW CAPACITY 1170 SEATS) NOW SPACE BEING OCCUPIED AS A CHURCH #35078341X | Mar 21, 2014 STIPULATION/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jul 23, 2025 | PLUMBING BASED ON LIC #001343 BEING INACTIVE, STOP ALL PLUMBING WORK UNDER JOB # 220519776 IMMEDIATELY #25-01734 | DOB VIOLATION - ACTIVE |
| Jul 23, 2025 | PLUMBING BASED ON LIC #001343 BEING INACTIVE, STOP ALL PLUMBING WORK UNDER JOB # X00420725 IMMEDIATELY #25-01735 | DOB VIOLATION - ACTIVE |
| Jun 23, 2021 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00234 | DOB VIOLATION - ACTIVE |
| Jul 27, 1995 | PLUMBING #11EL1 | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
| Jan 3, 1990 | BOILER 32 #32005219Q | VIOLATION UNSERVED ECB-ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 11) | Active |
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 11) | Active |
| Jun 23, 2021 | AEUHAZ FTC-AEU-HAZ | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 11, 2026, 8:59 AM ET. BBL 2040500001.