16 floors · 99 apartments · 148,873 sq ft · built 1929 · class D3 · owner of record: Westman Realty Co
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 57 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 57 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 73 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 148,873 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 178 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 178 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 301 days | Registered through 2027-09-01 |
| Facade inspection report (Cycle 10C) Applies Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $664,300 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2029 in 840 days | Filing window not open yet |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1153 days | Next cycle year 2029 |
| Energy audit and retro-commissioning (2032) Likely applies Local Law 87 · Calendar year 2032 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1252). Agency page | Dec 31, 2032 in 2249 days | Next due 2032 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-15 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 20, 2026 | Local Law CLASS - 2 FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 9B REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL #901503. REMEDY: FILE ACCEPTABLE REPORT. #37036749R | Jul 30, 2026 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Feb 21, 2024 | HAZARDOUS CONDITION (FACADE) CYCLE 9C UNSAFE REPORT FILED #911701 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Feb 21, 2024 | Facades FISPHAZ CYCLE 9C UNSAFE REPORT FILED | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Sep 8, 2025 | B | Apt 13E · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET AT CEILING IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 13E, 13th STORY, 1st APARTMENT FROM WEST AT NORTH ORIGINAL VIOLATION 17882224 ISSUED 02-MAY-25 HAS BEEN UPGRADED TO CLASS B PER ADMIN | Oct 13, 2025 |
| Apr 30, 2025 | C | Apt 17A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 17A, 17th STORY, 1st APARTMENT FROM NORTH AT EAST | May 6, 2025 |
| Apr 30, 2025 | B | Apt 17A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 17A, 17th STORY, 1st APARTMENT FROM NORTH AT EAST | Jun 4, 2025 |
| Jan 25, 2024 | B | § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING CONSISTING OF PADLOCKABLE EYE AT GATE LEADING TO STREET, AT FIRE PASSAGE WAY AT NORTH | Feb 29, 2024 |
| Sep 12, 2022 | B | Apt 11A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 11A, 11th STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 17, 2022 |
| Aug 11, 2022 | B | Apt 11A · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 11A, 11th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''EAST'' | Sep 15, 2022 |
| Aug 11, 2022 | C | Apt 11A · § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE IN THE ENTRANCE LOCATED AT APT 11A, 11th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''EAST'' | Aug 25, 2022 |
| Aug 11, 2022 | A | Apt 11A · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND ALL WALLS IN THE 1st ROOM FROM NORTH LOCATED AT APT 11A, 11th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''EAST'' | Nov 14, 2022 |
| Aug 11, 2022 | B | Apt 11A · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASH BASIN IN THE BATHROOM LOCATED AT APT 11A, 11th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''EAST'' | Sep 15, 2022 |
| Jul 28, 2022 | C | Apt 11A · § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE ... IN THE ENTRANCE LOCATED AT APT 11A, 11th STORY, 3rd APARTMENT FROM WEST AT NORTH | Aug 11, 2022 |
| Jul 28, 2022 | B | Apt 11A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 11A, 11th STORY, 3rd APARTMENT FROM WEST AT NORTH | Sep 1, 2022 |
| Jul 28, 2022 | B | Apt 11A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL AND CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 11A, 11th STORY, 3rd APARTMENT FROM WEST AT NORTH | Sep 1, 2022 |
| Aug 24, 2020 | A | Apt 13E · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE CAULKING AROUND KITCHEN SINK IN THE KITCHEN LOCATED AT APT 13E, 13th STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 27, 2020 |
| Aug 24, 2020 | A | Apt 13E · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE CAULKING AROUND BATHTUB IN THE BATHROOM LOCATED AT APT 13E, 13th STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 27, 2020 |
| Jun 13, 2002 | C | Apt 16F · § 27-2056.5 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR IS ON A DETERIORATED SUBSURFACE - USING EXCLUSIVE INTERIM CONTROLS. EAST CABINET DOOR IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 16F, 16th STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION AT W | Jul 14, 2002 |
| Date | Source | What | Now |
|---|---|---|---|
| Jul 28, 2026 | ECB | Construction: AT TIME OF INSPECTION OF 17 STORY BUILDING OBSERVED SIDEWALK SHED IN PLACE WITHOUT REQUIRED EXTENSION CAUSING HAZARDOUS CONDITIONSPROVIDE EXTENSION | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 4, 2026, 2:46 PM ET. BBL 1012520057.