5 floors · 9 apartments · 11,050 sq ft · built 1879 · class C7 · owner of record: Mbs Real Estate Group, Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 61 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 61 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 61 days | Annual |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2024-05-09 (Accepted). Agency page | Dec 31, 2026 in 61 days | 2 of 2 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 77 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 305 days | Registered through 2027-09-01 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Jul 30, 2026 | CONSTRUCTION ST&DM WORK @5-STY WOOD FRAME BLDG.SEPARATION @EXP3 MASONRY BRICK VENEER @5FL ADJ TO EXP4 PARTY WALL W/4"LEAN.MASONRY WALL OUT OF PLUMB @3,4&5FL.REPORT RECS MONITORING TO STBLZ REAR WALL.REMEDY:PROVIDE MONITORING PROTOCOL BY 8/5/26.SUBMIT REPORTS WEEKLY.SUBMIT FIRST REPORT BY 8/7/26 #CE10801JT | DOB VIOLATION - ACTIVE |
| Feb 26, 2014 | LANDMARK #14-0678 | DOB VIOLATION - ACTIVE |
| Mar 22, 1995 | CONSTRUCTION #08M01 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 8) | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Apr 29, 2026 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Aug 2, 2026 |
| Aug 2, 2022 | C | Apt 4R · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 4R, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 2, 2022 |
| Jul 26, 2022 | C | § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE AT STAIR BULKHEAD TO THE ROOF , 5th STORY | Aug 9, 2022 |
| Jul 26, 2022 | C | Apt 5F · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 5F, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Jul 26, 2022 |
| May 19, 2022 | C | Apt 4R · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 4R, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | May 19, 2022 |
| May 19, 2022 | C | Apt 4R · § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT RANGE IN THE KITCHEN LOCATED AT APT 4R, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | May 25, 2022 |
| Apr 30, 2018 | B | Apt 3N · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 3N, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Jun 4, 2018 |
| Apr 30, 2018 | B | Apt 3N · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 3N, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Jun 4, 2018 |
| May 17, 2017 | C | Apt 3N · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE KITCHEN LOCATED AT APT 3N, 3rd STORY, APARTMENT AT NORTH | May 25, 2017 |
| May 17, 2017 | C | Apt 3N · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING IN THE KITCHEN LOCATED AT APT 3N, 3rd STORY, APARTMENT AT NORTH | May 25, 2017 |
| Jun 24, 2008 | C | Apt 4R · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS AT BATHROOM OF 4 STY SOUTHWEST APT 4R ER1. , SECTION '' '' | Jun 30, 2008 |
| Jun 24, 2008 | C | Apt 4R · SECTION 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN BATHTUB 4 STY SOUTHWEST APT 4R ER1. , SECTION '' '' | Jun 30, 2008 |
| Jun 24, 2008 | C | Apt 4R · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING BATHROOM OF 4 STY SOUTHWEST APT 4R ER1. , SECTION '' '' | Jun 30, 2008 |
| May 4, 2007 | C | SECTION 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM CELLAR DOOR LOCKED. | May 27, 2007 |
| May 4, 2007 | B | SECTION 27-2005 ADM CODE FIRE ESCAPE DEFECTIVE. ADJUST THE DROPLADDER SO THAT IT WILL SLIDE EASILY IN THE GUIDE RODS REAR YARD | Jun 25, 2007 |
| May 4, 2007 | B | SECTION 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES AIR CONDITIONER INSTALLED PARTY WALL BALCONY 4 STY FRONT | Jun 25, 2007 |
| May 4, 2007 | B | SECTION 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES CONSISTING FLOWER POTS PARTY WALL BALCONY 4 & 5 STY FRONT | Jun 25, 2007 |
| May 4, 2007 | C | SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE SHEET METAL CORNICE CORRODED & FRAGMENTED AT 3 STY EAST EXTERIOR WALL OF BLDG ER1 | May 27, 2007 |
| May 4, 2007 | C | Apt 3F · SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CONCRETE 3 STY PARTY WALL BALCONY NORTH PORTION CRACKED AT EAST EXTERIOR WALL OF BLDG NEAR 3 STY EAST APT 3F ER1 LOCATED AT APT 3F | May 27, 2007 |
| May 4, 2007 | B | Apt 4R · SECTION 27-2045, 2046 ADM CODE PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS MISSING 4 STY SOUTH APT 4R. , SECTION '' '' | Jun 25, 2007 |
| May 4, 2007 | C | Apt 3N · SECTION 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES KITCHEN AND BATHROOM FIXTURES 3 STY NORTH APT 3N. LOCATED AT APT 3N | May 27, 2007 |
| May 4, 2007 | B | Apt 3N · SECTION 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING 3 STY NORTH APT 3N JAHSS. LOCATED AT APT 3N | Jun 25, 2007 |
| May 4, 2007 | B | Apt 5F · SECTION 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING 5 STY EAST APT 5F PORTNOY. , SECTION '' '' | Jun 25, 2007 |
| Date | Source | What | Now |
|---|---|---|---|
| Jul 30, 2026 | DOB | CONSTRUCTION: ST&DM WORK @5-STY WOOD FRAME BLDG.SEPARATION @EXP3 MASONRY BRICK VENEER @5FL ADJ TO EXP4 PARTY WALL W/4"LEAN.MASONRY WALL OUT OF PLUMB @3,4&5FL.REPORT RECS MONITORING TO STBLZ REAR WALL.REMEDY:PROVIDE MONITORING PROTOCOL BY 8/5/26.SUBMIT REPORTS WEEKLY.SUBMIT FIRST REPORT BY 8/7/26 | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 31, 2026, 6:20 PM ET. BBL 1013770016.