2 floors · 2 apartments · 1,578 sq ft · built 1901 · class B3 · owner of record: Raggi, Steven
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 306 days | Required only if the owner doesn't live there |
None open.
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 26, 2026 | B | Apt 1STFLO · § 27-2026 ADMIN. CODE: REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASTE LINE AT BATHTUB IN THE BATHROOM LOCATED AT APT 1STFLO, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 30, 2026 |
| Oct 26, 2026 | A | Apt 1STFLO · § 27-2010, 2011, 2012 ADMIN CODE: CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE MILDEW ON GROUT AROUND BATHTUB AND BETWEEN CERAMIC TILE AT ALL WALLS IN THE BATHROOM LOCATED AT APT 1STFLO, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 29, 2027 |
| Oct 26, 2026 | B | Apt 1STFLO · § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE AT FLOOR IN THE BATHROOM LOCATED AT APT 1STFLO, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 30, 2026 |
| Oct 26, 2026 | B | Apt 1STFLO · § 27-2026 ADMIN. CODE: REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET ... IN THE BATHROOM LOCATED AT APT 1STFLO, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 30, 2026 |
| Jun 25, 2026 | B | Apt 1FL · § 27-2026 ADMIN. CODE: REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 1FL, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Jul 30, 2026 |
| Jun 25, 2026 | B | Apt 1FL · § 27-2026 ADMIN. CODE: REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASTE PIPE AT BATHTUB IN THE BATHROOM LOCATED AT APT 1FL, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Jul 30, 2026 |
| Jun 25, 2026 | B | Apt 1FL · § 27-2026 ADMIN. CODE: REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASTE PIPE AT WASHBASIN IN THE BATHROOM LOCATED AT APT 1FL, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Jul 30, 2026 |
| Jun 25, 2026 | A | Apt 1FL · § 27-2010, 2011, 2012 ADMIN CODE: CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE AT SOUTH WALL SQUARE IN THE BATHROOM LOCATED AT APT 1FL, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 28, 2026 |
| Jun 25, 2026 | B | Apt 1FL · § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT EAST WALL IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 1FL, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Jul 30, 2026 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 26, 2026 | HPD B | § 27-2026 ADMIN. CODE: REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASTE LINE AT BATHTUB IN THE BATHROOM LOCATED AT APT 1STFLO, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Oct 26, 2026 | HPD A | § 27-2010, 2011, 2012 ADMIN CODE: CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE MILDEW ON GROUT AROUND BATHTUB AND BETWEEN CERAMIC TILE AT ALL WALLS IN THE BATHROOM LOCATED AT APT 1STFLO, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Oct 26, 2026 | HPD B | § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE AT FLOOR IN THE BATHROOM LOCATED AT APT 1STFLO, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Oct 26, 2026 | HPD B | § 27-2026 ADMIN. CODE: REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET ... IN THE BATHROOM LOCATED AT APT 1STFLO, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 30, 2026, 11:03 PM ET. BBL 5015150015.