Brooklyn · Block 236 · Lot 11 · 11201

69 Pierrepont Street

8 floors · 40 apartments · 55,284 sq ft · built 1930 · class D4 · owner of record: 61-69 Pierrepont Owners Corp.

8open violations
$0ECB/OATH penalties owed
2HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2026-09-01
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 65 days
Keep the report on file (not filed with DOB)
Energy audit and retro-commissioning (2026) Likely applies
Local Law 87 · Calendar year 2026
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 236). Agency page

Dec 31, 2026
in 65 days
Due this year
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 65 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 81 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 55,284 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 186 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 186 days
Annual filing
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1161 days
Next cycle year 2029
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-18 (Accepted). Agency page

On file2026 reports accepted
Facade inspection report (Cycle 10A) Applies
Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $99,000 in late-filing or failure-to-file penalties. Agency page

On fileCycle 10 filing on record: SWARMP (2026-03-13)

Open violations

ECB / OATH (2)
IssuedViolationHearingBalance
Jun 5, 2007Boilers Hazardous
B4B,4B,24B,38,45B,48A,50A,B,C,D,E,F.50A-NO PULL CHAIN ON 3" RELIEF VALVE.50B-HOLES IN BOILER ROOM WALLS & CEILING.50C-NO DOOR BETWEEN BOILER ROOM & TANK ROOM.50D-BACKFLOW NOT PILED DOWN.50E-( )CEMENT MISS
#32054029X
Jul 30, 2007
IN VIOLATION
$0
Apr 25, 2007Boilers Non-Hazardous
E4A,16,32A,42,50,50A,50B,50C,50D,50E,50F,50G.50-SAFETY VALVE NOT PIPEDDOWN.50A-SMOKE ALARM NOT WORKING.50B-MISSING FRESH AIR LEVER.50C-MISSING BOILER ROOM DOOR.50D-MISSING ANTI SYPHON VALVE ON OIL LINE.50E-NO
#32050490X
Jul 23, 2008
IN VIOLATION
$0
DOB (4)
IssuedViolationStatus
Mar 13, 2002ELEVATOR

#9444/351626
DOB VIOLATION - ACTIVE
Mar 21, 2001CONSTRUCTION
HAZARDOUS
#02EM01
DOB VIOLATION - ACTIVE
Mar 21, 2001CONSTRUCTION
WORK WWITHOUT PERMIT. WORK NOTED: AT 6TH FL APT. #62 MAJOR RENNOVATION WORK IS IN PROGRESS WITH RE-FRAMING DOOR SIZES. INSTALLING NEW PLUMB- ING LINES IN BATHROOM, REMOVING WALL COVERING A
#02EM02
VIOLATION WORK WITHOUT PERMIT - ACTIVE
Mar 20, 2001CONSTRUCTION
WORK WITHOUT A PERMIT. WORK NOTED: AT 6TH FL APT #62, MAJOR RENNOVA- TION WORK IS IN PROGRESS WITH REFRAMING DOOR SIZES, INSTALLING 2 NEW PLUMBING LINES IN BATHROOM, REMOVING WALL COVERINGS & EXPOSING ELECTRI CAL LINES AS WELL. STOP ALL DEMOLITION & CONSTRUCTION WORK! REMEDY: OBTAIN ALL NECESSARY PE
#02EM02
VIOLATION WORK WITHOUT PERMIT - ACTIVE
DOB NOW Safety (0)

None open.

HPD (2) · C 2 · B 0 · A 0
IssuedClassViolationCorrect by
Feb 7, 2005CApt 32 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FROM NORTH AT EAST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 32,Mar 5, 2005
Feb 7, 2005CApt 32 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st WINDOW FRAME FROM EAST AT SOUTH WALL IN THE 2nd ROOM FROM NORTH AT WEST LOCATED ATMar 5, 2005

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 27, 2026, 3:23 AM ET. BBL 3002360011.

Look up another building