2 floors · 5 apartments · 3,700 sq ft · built 1920 · class C2 · owner of record: 69-79 75th Street Realty Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 66 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 66 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 82 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1162 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 1, 2024 | Construction CLASS - 2 WORK WITHOUT A PERMIT. NOTED: AT CELLAR LEVEL ERECTED FULL HEIGHT PARTITION WALLS TO CREATE BATHROOM. INSTALLED WATER & WASTE LINES FOR TUB, TOILET, & PLUMBING ROUGHING FOR SINK. AT FRONT OF PREMISES INSTALLED #39110417X | Jun 11, 2024 DEFAULT | $0 |
| Jul 23, 2020 | Construction CLASS - 3 FAILURE TO MAINTAIN BUILDING AND ALL PARTS THEREOF IN A CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION, AT FRONT OF THE BUILDING EXPOSURE 1 CURB CUT IS ILLEGALLY CUT AND LOWERED WITHOUT DOB APPROVAL JOB FILIN #39025806N | Sep 8, 2020 DEFAULT | $0 |
| Oct 8, 2009 | Construction CLASS - 3 VIOLATIONS OF PARKING REGULATIONS(ON A DISTRICT) NOTE:DEAD STORAGE OF ONE BLACK MERCEDES W/O PLATES BEING STORED IN FRONT COURTYARD. REMEDY:CONFORM TO PARKING REGULATIONS, REMOVE VEHICLE. #34810169L | Dec 1, 2009 WRITTEN OFF | $0 |
| Jun 27, 2009 | Construction CLASS - 1 SEC 28-201.1 MISC VIOL: FAIL TO COMPLY W.COMM ORDER TO OBTAIN A PERMITPER VIOLATION 34737069X FOR WORK W.O PERMIT. REMOVE WATER LINE # WASTE& GAS LINE ON 2ND FLOOR LEVEL. NO EGRESS OF CORRECTION IN THE BLDG DEP #34793271X | May 25, 2010 WRITTEN OFF | $0 |
| May 20, 2009 | Construction CLASS - 1 PROVISION OF LAW 28-201.1 FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER TO OBTAIN PERMITS. FOR 2 S STEEL WOOD EXTENSION AT REAR AS PER#34715507-J REM: OBTAIN AS D.O.B. PERMITS #34779876H | Jul 14, 2009 WRITTEN OFF | $0 |
| Dec 12, 2008 | Construction CLASS - 1 WORK W/O A PERMIT WORK NOTED AT 2ND FL LEVEL FRONT REMOVE WATER LINES AND WASTE FROM 3PC BATHROOM RESIDENTIAL SINK AND GAS LINE NO PERMIT ISSUED REMEDY: OBTAIN PERMIT OR RESTORE TO PRIOR LEGAL CONDITION #34737069X | May 25, 2010 WRITTEN OFF | $0 |
| Oct 23, 2008 | Construction CLASS - 1 RESIDENCE ALTERED FOR OCCUPANCY AS A DWELLING FOR MORE THAN THE LEGALLY APPROVED NUMBER OF FAMILIES. DOB RECORDS INDICATE PREMISES TO BE LEGALLY FOR 2 FAMILY CELLAR BOILER & STORAGE RESIDENCE IS NOW ALTERED FOR #34715505X | May 25, 2010 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Dec 12, 2008 | CONSTRUCTION #0501KG | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 5) | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 26, 2026, 12:03 AM ET. BBL 4037940057.