3 floors · 6 apartments · 3,552 sq ft · built 1930 · class C2 · owner of record: 685 Mk Realty Group Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 44 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 44 days | Annual |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-30 (Accepted). Agency page | Dec 31, 2026 in 44 days | 1 of 1 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 60 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 288 days | Registered through 2027-09-01 |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 409 days | Next cycle year 2027 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Mar 10, 2022 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35553731L ISSUED 03/31/21 AND FILE CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.B102:FAILURE TO MAINTAIN AT WOODEN #35566747Z | Jun 3, 2022 DEFAULT | $3,125 |
| Mar 10, 2022 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35446034M ISSUED 11/16/19 AND FILE CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.B103:OCCUPANCY CONTRARY AT CELLAR L #35566748K | Jun 3, 2022 DEFAULT | $3,125 |
| Jan 6, 2022 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35553731L ISSUED ON 03/31/21 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.REM:COMPLY WITH COMMISSI #35566712Z | Apr 1, 2022 DEFAULT | $3,125 |
| Jan 6, 2022 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35446034M ISSUED ON 11/16/19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.REM:COMPLY WITH COMMISSI #35566711R | Apr 1, 2022 DEFAULT | $3,125 |
| Oct 23, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER CONTAINED IN SUMMONS/V35553731L ISSUED3/31/21 &TO FILE C/C PURSUANT TO28-201.1&1RCNY102-01.FAILURE TO MAINTAIN BLDG,WOOD STIRCASE B/W CELLAR&1FL,BROKEN/MISSING TREADS.CO #35564453Y | Jan 21, 2022 DEFAULT | $3,125 |
| Oct 23, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER CONTAINED IN SUMMONS/V35446034M ISSUED11/16/19&TO FILE C/C PURSUANT TO28-201.1&1RCNY102-01.OCCUPANCY CONTRARY TO THAT ALLOWED BY C/O/DEPT RECORDS.ILLEGAL OCCUPANCY IN CE #35564452M | Jan 21, 2022 DEFAULT | $3,125 |
| Aug 23, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35446035Y ISSUED ON 11/16/19 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01. WORK W/O A PERMIT. REMEDY: COMPLY W/COMM'S ORDER &/ #35561891K | Nov 5, 2021 DEFAULT | $10,000 |
| Aug 23, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35446034M ISSUED ON 11/16/19 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01. OCCUPANY CONTRARY. REMEDY: COMPLY W/COMM'S ORDER &/ #35561889L | Nov 5, 2021 DEFAULT | $3,125 |
| Aug 23, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35407092Z ISSUED ON 03/30/19 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01. WORK W/O A PERMIT. REMEDY: COMPLY W/COMM'S ORDER &/ #35561892M | Nov 5, 2021 DEFAULT | $6,250 |
| Aug 23, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35553731L ISSUED ON 03/31/21 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01. FAILURE TO MAINTAIN. REMEDY: COMPLY W/COMM'S ORDER #35561890Z | Nov 5, 2021 DEFAULT | $3,125 |
| Jun 16, 2021 | Construction CLASS - 1 FAILURE TO COMPLY W/COMMISSIONER'S ORDER CONTAINED IN SUMMONS/V35407092Z ISSUED3/30/19 &TO FILE C/C PURSUANT TO28-201.1&1RCNY102-01.WORK W/OPERMIT.COMPLY W/COMMISSIONER'S ORDER &/OR FILE C/C. #35532401X | Sep 3, 2021 DEFAULT | $6,250 |
| May 21, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35553731L ISSUED ON 03/31/21 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01. FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. #35531012H | Aug 6, 2021 DEFAULT | $3,125 |
| May 19, 2021 | Construction CLASS - 1 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35446035Y ISSUED ON 11/16/19 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01. FOR B101: WORK W/O A PERMIT AT CELLAR LEVEL. #35531043K | Aug 6, 2021 DEFAULT | $12,500 |
| Mar 31, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER CONTAINED IN SUMMONS/V35446034M ISSUED11/16/19&TO FILE C/C PURSUANT TO28-201.1&1RCNY102-01.FOR B103:OCCUPANCY CONTRARY TO C/O...@CELLAR LEVEL-CLASSA APT.COMPLY W/COMMISS #35528908N | Jun 18, 2021 DEFAULT | $3,125 |
| Mar 31, 2021 | Construction CLASS - 1 FAILURE TO COMPLY W/COMMISSIONER'S ORDER CONTAINED IN SUMMONS/V35407092Z ISSUED3/30/19&TO FILE C/C PURSUANT TO28-201.1&1RCNY102-01.FOR B101:WORK C/O PERMIT...@1FL SUBDIVIDED(FRONT&REAR),GASLINE,WATER&WASTELINE #35528909P | Jun 18, 2021 DEFAULT | $12,500 |
| Mar 31, 2021 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG IN CODECOMPLIANT MANNER.NOTED:DURING INSP OBSERVED@WOODEN STAIRWAY B/W 1FL&CELLAR LEVEL IN PUBLIC CORRIDOR AREA.STAIRWAY HAS SEVERAL BROKEN,MISSING &/OR HANGING TREADS OBSERVED ON LOWER #35553731L | Jun 18, 2021 DEFAULT | $12,500 |
| Mar 11, 2021 | Construction CLASS - 1 FAILURE TO COMPLY W/COMMISSIONER'S ORDER CONTAINED IN SUMMONS/V35446035Y ISSUED11/16/19&TO FILE C/C PURSUANT TO28-201.1&1RCNY102-01.WORK W/OPERMIT.NOTED:@CELLAR LEVEL INSTALLED WATER&WASTE LINES FOR 3PC BATHRM #35524150K | Jun 4, 2021 DEFAULT | $12,500 |
| Mar 5, 2021 | Construction CLASS - 1 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35407092Z ISSUED ON 03/30/19 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01. WORK W/O A PERMIT AT 1ST FL LEVEL. NO ACTIVE PERMIT #35527487J | May 21, 2021 DEFAULT | $12,500 |
| Feb 3, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35446034M ISSUED ON 11/16/2019 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.FOR B103:OCCUPANCY CON #35526174Y | Apr 30, 2021 DEFAULT | $3,125 |
| Feb 3, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35446036X ISSUED ON 11/16/2019 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.FOR B102:FAILURE TO MA #35526173M | Apr 30, 2021 DEFAULT | $3,125 |
| Feb 3, 2021 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATON#35407092Z ISSUED ON 3/30/2019 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.FOR B101:WORK WITHOUT A #35540300R | Apr 30, 2021 DEFAULT | $12,500 |
| Oct 23, 2020 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35446036X ISSUED ON 11/16/19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.FAILURE TO MAINTAIN BLDG IN #35521392J | Jan 15, 2021 DEFAULT | $3,125 |
| Oct 23, 2020 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35446034M ISSUED ON 11/16/19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY102-01.OCCUPANCY CONTRARY:CREAT #35521393L | Jan 15, 2021 DEFAULT | $3,125 |
| Oct 23, 2020 | Construction CLASS - 1 FAILURE TO COMPLY W/ COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35446035Y ISSUED ON 11/16/19 & TO FILE CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1&1RCNY102-01.WORK W/O PERMIT @ CELLAR LEVEL.COMPLY W #35523346H | Apr 2, 2021 ADMIT/IN-VIO | $0 |
| Sep 4, 2020 | Construction CLASS - 1 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35407092Z ISSUED ON 03/30/19 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102.01. REMEDY: COMPLY W/COMM'S ORDER &/OR FILE A CERT OF C #35519875L | Nov 6, 2020 DEFAULT | $12,500 |
| Sep 4, 2020 | Construction CLASS - 1 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35407092Z ISSUED ON 03/30/19 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102.01. REMEDY: COMPLY W/COMM'S ORDER &/OR FILE A CERT OF C #35519874J | Nov 6, 2020 DEFAULT | $12,500 |
| Sep 4, 2020 | Construction CLASS - 1 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35446035Y ISSUED ON 11/16/19 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102.01. WORK W/O A PERMIT. REMEDY: COMPLY W/COMM'S ORDER &/ #35519872X | Nov 6, 2020 DEFAULT | $12,500 |
| Sep 4, 2020 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35446034M ISSUED ON 11/16/19 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102.01. REMEDY: COMPLY W/COMM'S ORDER &/OR FILE A CERT OF C #35519873H | Nov 6, 2020 DEFAULT | $5,000 |
| Sep 4, 2020 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35446036X ISSUED ON 11/16/19 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102.01. REMEDY: COMPLY W/COMM'S ORDER &/OR FILE A CERT OF C #35519871Y | Nov 6, 2020 DEFAULT | $5,000 |
| Aug 25, 2020 | Construction CLASS - 1 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35446035Y ISSUED ON 11/16/19 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102.01. WORK W/O A PERMIT. NOTED: AT CELLAR LEVEL.INSTALLED #35519700J | Oct 30, 2020 DEFAULT | $12,500 |
| Mar 10, 2020 | Construction CLASS - 1 FAILURE TO COMPLY WITH COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION #35407092Z ISSUED ON 03-30-2019,AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1 RCNY 102-01.COMPLY WITH COMMISSIONERS #35518159X | Oct 9, 2020 DEFAULT | $12,500 |
| Mar 10, 2020 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION #35446036X ISSUED ON 11-16-2019,AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1 RCNY 102-01.COMPLY WITH COMMISSIONERS #35518158Y | Oct 9, 2020 DEFAULT | $3,125 |
| Feb 15, 2020 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35446035Y ISSUED ON 11/16/19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.REM: COMPLY WITH COMMISS #35517470Y | Jul 31, 2020 DEFAULT | $12,500 |
| Feb 15, 2020 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35446034M ISSUED ON 11/16/19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.REM: COMPLY WITH COMMISS #35517471X | Jul 31, 2020 DEFAULT | $3,125 |
| Dec 24, 2019 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VVIOLATION#35407092Z ISSUED ON 3/30/19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.REMEDY:COMPLY WITH COMMI #35514291P | Feb 7, 2020 DEFAULT | $6,250 |
| Nov 16, 2019 | Construction CLASS - 1 WORK W/O A PERMIT. NOTED: AT CELLAR LEVEL-FULL HEIGHT PARTITION WALLS ERECTED CREATED AN ADDITIONAL BATHROOM & BEDROOMS. WATER & WASTE LINES INSTALLED FOR ADDITIONAL 3PC BATHROOM(TOILET,SINK,TUB)& RESIDENTIAL #35446035Y | Mar 25, 2022 DEFAULT | $12,500 |
| Nov 16, 2019 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. NOTED: WOOD INTERIOR STAIRS BETWEEN 1ST FL & CELLAR-BOTTOM TREADS ARE BROKEN,MIMSSING & HANGING;OBSTRUCTING EGRESS/PASSAGE FROM/TO CELLAR & 1ST FL PUBLIC HALL. #35446036X | Jan 3, 2020 DEFAULT | $6,250 |
| Nov 16, 2019 | Construction CLASS - 1 OCCUPANCY CONTRARY TO THAT ALLOWED BY THE CERT OF OCCUPANCY OR BLDGS DEPT RECORDS. NOTED: DOB & OFFICIAL RECORDS INDICATES AT CELLAR LEVEL-1 CLASS'A'APT. AT TIME OF INSPECTION OBSERVED AT CELLAR 2 CLASS'A'APT #35446034M | Jan 3, 2020 DEFAULT | $12,500 |
| Oct 9, 2019 | Construction CLASS - 1 FAILRUE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION#35407092Z ISSUED ON 03/30/19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.REM:COMPLY WITH COMMISSIO #35430034X | Jan 3, 2020 IN VIOLATION | $2,500 |
| Aug 22, 2019 | Construction CLASS - 1 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35407092Z ISSUED ON 03/30/19 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. REMEDY: COMPLY W/COMM'S ORDER &/OR FILE A C OF C. #35427641K | Oct 18, 2019 IN VIOLATION | $2,500 |
| Jun 19, 2019 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35407092Z ISSUED ON 3/30/19 AND TO FILE A CERT.OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.REM:COMPLY WITH COMMISSIONER'S O #35400002Y | Jan 10, 2020 IN VIOLATION | $2,500 |
| Mar 30, 2019 | Unknown CLASS - 2 RESIDENCE CONVERTED,MAINTAINED,OR OCCUPIED AS A DWELLING FOR MORE THANTHE LEGALLY APPROVED NUMBER OF FAMILIES AUTHORIZED BY THE C OF O OR OFFICIAL DEPARTMENT RECORDS.NOTED:DOB RECORDS INDICATES A (3) STORY(6)FA #35407091R | May 17, 2019 DEFAULT | $10,000 |
| Mar 30, 2019 | Construction CLASS - 1 WORK WITHOUT A PERMIT.NOTED:AT 1ST FLR LVEL,FLOOR SUBDIVIDED;TO SUBDIVIDE LEVEL(FRONT & REAR);TO CREATE AN ADDITIONAL BATHROOM.WATER AND WASTE LINES INSTALLED FOR A (3)PC BATHROOM(TOILET,SINK,TUB)AT FRONT;AND A #35407092Z | Oct 18, 2019 IN VIOLATION | $2,500 |
| Issued | Violation | Status |
|---|---|---|
| Jun 23, 2021 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00243 | DOB VIOLATION - ACTIVE |
| Feb 5, 2020 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00400 | DOB VIOLATION - ACTIVE |
| Feb 5, 2020 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00399 | DOB VIOLATION - ACTIVE |
| Feb 5, 2020 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00398 | DOB VIOLATION - ACTIVE |
| Nov 8, 2019 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT #04149 | DOB VIOLATION - ACTIVE |
| Jun 26, 2019 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00588 | DOB VIOLATION - ACTIVE |
| Apr 6, 2018 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT #05589 | DOB VIOLATION - ACTIVE |
| Feb 24, 2017 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT #04119 | DOB VIOLATION - ACTIVE |
| Sep 16, 1997 | LOCAL LAW 62/91 - BOILERS #208739 | DOB VIOLATION - ACTIVE |
| Feb 10, 1997 | LOCAL LAW 62/91 - BOILERS #15873 | DOB VIOLATION - ACTIVE |
| Aug 29, 1995 | LOCAL LAW 62/91 - BOILERS #16355 | DOB VIOLATION - ACTIVE |
| Jun 9, 1994 | LOCAL LAW 62/91 - BOILERS #01682 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 12) | Active |
| Jun 23, 2021 | AEUHAZ FTC-AEU-HAZ | Active |
| Feb 5, 2020 | AEUHAZ FTC-AEU-HAZ | Active |
| Feb 5, 2020 | AEUHAZ FTC-AEU-HAZ | Active |
| Feb 5, 2020 | AEUHAZ FTC-AEU-HAZ | Active |
| Nov 8, 2019 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT | Active |
| Jun 26, 2019 | AEUHAZ FTC-AEU-HAZ | Active |
| Apr 6, 2018 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT | Active |
| Feb 24, 2017 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT | Active |
| Sep 16, 1997 | Boiler LL6291 | Active |
| Feb 10, 1997 | Boiler LL6291 | Active |
| Aug 29, 1995 | Boiler LL6291 | Active |
| Jun 9, 1994 | Boiler LL6291 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Sep 21, 2026 | C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCK AND ASSEMBLEY AT BUILDING ENTRANCE DOOR AT PUBLIC HALL, 1st STORY | Sep 27, 2026 |
| Nov 12, 2025 | B | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING OPERABLE KNOB AT DOOR AT BULKHEAD ALLOWING RE-ENTRY FROM ROOF TO BULKHEAD | Dec 17, 2025 |
| Nov 12, 2025 | C | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL MISSING AT CEILING 30 SQ FEET AT BASEMENT | Nov 18, 2025 |
| Nov 12, 2025 | B | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING AT PUBLIC HALL, 3rd STORY | Dec 17, 2025 |
| Nov 12, 2025 | B | § 27-2005 ADM CODE PROVIDE APPROVED METAL SCREEN BELOW SKYLIGHT AT BULKHEAD | Dec 17, 2025 |
| Nov 12, 2025 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND EAST WALL AT PUBLIC HALL, 3rd STORY | Feb 15, 2026 |
| Nov 12, 2025 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AND EAST WALL AT PUBLIC HALL, 3rd STORY | Dec 17, 2025 |
| Nov 12, 2025 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE DOOR AT VESTIBULE , 1st STORY | Nov 26, 2025 |
| Nov 12, 2025 | C | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT BOILER ROOM AT BASEMENT | Nov 18, 2025 |
| Nov 10, 2025 | B | Apt 2R · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 2R, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Dec 15, 2025 |
| Nov 10, 2025 | B | Apt 2R · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL AND RETURN SYSTEM FROM APARTMENT TO BUILDING FRONT IN THE FOYER LOCATED AT APT 2R, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Dec 15, 2025 |
| Nov 10, 2025 | B | Apt 2R · § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT ELECTRICAL OUTLET AT NORTH IN THE KITCHEN LOCATED AT APT 2R, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Dec 15, 2025 |
| Nov 10, 2025 | A | Apt 2R · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE FLOOR IN THE BATHROOM LOCATED AT APT 2R, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Feb 13, 2026 |
| Nov 10, 2025 | B | Apt 2R · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WASH BASIN IN THE BATHROOM LOCATED AT APT 2R, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Dec 15, 2025 |
| Nov 10, 2025 | B | Apt 2R · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN ENAMEL GLAZE AT BATHTUB IN THE BATHROOM LOCATED AT APT 2R, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Dec 15, 2025 |
| Nov 10, 2025 | B | Apt 2R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 2R, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Dec 15, 2025 |
| Nov 10, 2025 | B | Apt 2R · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN ENAMEL GLAZE AT BATHTUB IN THE BATHROOM LOCATED AT APT 2R, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Dec 15, 2025 |
| Aug 4, 2025 | C | Apt 2R · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 30 SQ FT AT CEILING IN THE BATHROOM LOCATED AT APT 2R, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Aug 30, 2025 |
| Aug 4, 2025 | C | Apt 2R · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 2R, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Aug 10, 2025 |
| Aug 4, 2025 | C | Apt 2R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE BATHROOM LOCATED AT APT 2R, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Aug 10, 2025 |
| Aug 4, 2025 | B | Apt 2R · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MORTISE LOCK AT DOOR IN THE ENTRANCE LOCATED AT APT 2R, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Sep 8, 2025 |
| Aug 4, 2025 | A | Apt 2R · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE KITCHEN LOCATED AT APT 2R, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Nov 7, 2025 |
| Jul 24, 2024 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT PUBLIC HALL, 2nd STORY | Oct 27, 2024 |
| Jul 24, 2024 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILING AT PUBLIC HALL, 1st STORY | Oct 27, 2024 |
| Jul 24, 2024 | B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AT PUBLIC HALL, 3rd STORY | Aug 28, 2024 |
| Jul 24, 2024 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT PUBLIC HALL, 3rd STORY | Oct 27, 2024 |
| Jul 24, 2024 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT CEILING AT PUBLIC HALL, 3rd STORY | Aug 28, 2024 |
| Feb 7, 2024 | B | Apt 2R · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE THE WOOD FLOOR IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2R, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Mar 13, 2024 |
| Feb 7, 2024 | C | Apt 2R · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2R, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Mar 4, 2024 |
| Feb 7, 2024 | A | Apt 2R · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BATHTUB PORCELAIN GLAZE BY WAY OF REGLAZING IN THE BATHROOM LOCATED AT APT 2R, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | May 12, 2024 |
| Feb 7, 2024 | C | Apt 2R · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF RODENTS RATS IN THE ENTIRE APARTMENT LOCATED AT APT 2R, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Mar 4, 2024 |
| Feb 7, 2024 | A | Apt 2R · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM NORTH AT EAST, THE BATHROOM , THE 1st ROOM FROM NORTH AT WEST, THE KITCHEN LOCATED AT APT 2R, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | May 12, 2024 |
| Feb 7, 2024 | B | Apt 2R · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 2R, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Mar 13, 2024 |
| Feb 7, 2024 | B | Apt 2R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE BATHROOM LOCATED AT APT 2R, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Mar 13, 2024 |
| Feb 7, 2024 | A | Apt 2R · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE CABINET DOORS AT NORTH AND SOUTH WALLS IN THE KITCHEN LOCATED AT APT 2R, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | May 12, 2024 |
| Jul 14, 2023 | B | Apt 2R · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 2R, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Aug 18, 2023 |
| Jul 14, 2023 | B | Apt 2R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 2R, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Aug 18, 2023 |
| Feb 24, 2023 | B | Apt 2R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 2R, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Mar 31, 2023 |
| Feb 24, 2023 | A | Apt 2R · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE KITCHEN , THE FOYER LOCATED AT APT 2R, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | May 30, 2023 |
| Feb 24, 2023 | C | Apt 2R · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2R, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Mar 22, 2023 |
| Feb 24, 2023 | C | Apt 2R · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2R, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Mar 22, 2023 |
| Feb 28, 2020 | B | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING AT BUKHEAD AT PUBLIC HALL, 3rd STORY | Apr 3, 2020 |
| Feb 28, 2020 | A | § 27-2014 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT ALL STORY BALCONIES AT FIRE ESCAPE AT WEST | Jun 2, 2020 |
| Jul 10, 2019 | C | Apt 3R · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) NORTH WALL, EAST WALL IN THE KITCHEN LOCATED AT APT 3R, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Aug 7, 2019 |
| Jul 10, 2019 | C | Apt 3R · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) EAST WALL IN THE BATHROOM LOCATED AT APT 3R, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Aug 7, 2019 |
| Jul 3, 2019 | C | Apt 3R · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3R, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Jul 24, 2019 |
| Jul 3, 2019 | B | Apt 3R · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE LOCATED AT APT 3R, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Aug 7, 2019 |
| Jul 3, 2019 | B | Apt 3R · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE LOCATED AT APT 3R, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Aug 7, 2019 |
| Jul 3, 2019 | B | Apt 3R · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE BATHROOM LOCATED AT APT 3R, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Aug 7, 2019 |
| Jul 3, 2019 | C | Apt 3R · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 15 SQ FT AT CEILING IN THE BATHROOM LOCATED AT APT 3R, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST ORIGINAL VIOLATION 12967848 ISSUED 19-MAR-19 HAS BEEN UPGRADED TO CLASS C PER ADMINISTRATIVE CODE ''27 | Jul 24, 2019 |
| Jul 3, 2019 | B | Apt 3R · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF VERMIN WATERBUGS IN THE ENTIRE APARTMENT LOCATED AT APT 3R, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Aug 7, 2019 |
| Mar 26, 2019 | A | Apt 3R · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE BATHROOM , THE KITCHEN , THE 1st ROOM FROM NORTH AT EAST, THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 3R, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Jun 29, 2019 |
| Mar 26, 2019 | B | Apt 3R · § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE ... IN THE ENTRANCE LOCATED AT APT 3R, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Apr 30, 2019 |
| Mar 26, 2019 | C | Apt 3R · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3R, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Apr 16, 2019 |
| Mar 26, 2019 | C | Apt 3R · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3R, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Apr 16, 2019 |
| Mar 26, 2019 | C | Apt 3R · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF ELEVATED WATER TEMPERATURE (185 DEGREES) EXCEEDING THE MAXIMIUM REGULATORY (130 DEGREES) AT ALL PLUMBING IN KITCHEN AND BATHROOM LOCATED AT APT 3R, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Apr 3, 2019 |
| Mar 26, 2019 | C | Apt 3R · § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 2; WG TO REPLACE = 0; WG TO REPAIR = 0; LOCATED AT APT 3R, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WES | Apr 23, 2019 |
| Mar 26, 2019 | A | Apt 3R · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE GROUT ON WALLS AROUND BATHTUB IN THE BATHROOM LOCATED AT APT 3R, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Jun 29, 2019 |
| Mar 26, 2019 | B | Apt 3R · § 27-2026 ADM CODE REPLACE THE BROKEN OR DEFECTIVE SHOWER BODY AT BATHTUB IN THE BATHROOM LOCATED AT APT 3R, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Apr 30, 2019 |
| Mar 22, 2019 | B | Apt 3R · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE MORTISE LOCK AT DOOR IN THE ENTRANCE LOCATED AT APT 3R, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Apr 26, 2019 |
Showing 60 of 79. Full list on the agency site.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 21, 2026 | HPD C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCK AND ASSEMBLEY AT BUILDING ENTRANCE DOOR AT PUBLIC HALL, 1st STORY | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 17, 2026, 6:19 PM ET. BBL 2049950007.