5 floors · 12 apartments · 11,425 sq ft · built 1910 · class C7 · owner of record: 681 M Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 60 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 60 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 76 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 304 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 791 days | Next cycle year 2028 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-09-15 (Accepted). Agency page | On file | 2026 reports accepted |
None open.
| Issued | Violation | Status |
|---|---|---|
| May 25, 2017 | CONSTRUCTION #0102TC | DOB VIOLATION - ACTIVE |
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 26, 2026 | B | Apt 6 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL WALL OUTLET AT NORTH WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 30, 2026 |
| Oct 26, 2026 | B | Apt 6 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRIAL OUTLET AT EAST WALL IN THE FOYER LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 30, 2026 |
| Oct 26, 2026 | B | Apt 6 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK THE CEILING IN THE BATHROOM LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 30, 2026 |
| Oct 26, 2026 | C | Apt 6 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE BATHROOM LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 1, 2026 |
| Oct 26, 2026 | B | Apt 6 · § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE WASH BASIN TO CABINET IN THE BATHROOM LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 30, 2026 |
| Oct 26, 2026 | B | Apt 6 · § 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET .. IN THE BATHROOM LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 30, 2026 |
| Oct 26, 2026 | B | Apt 6 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOWER WINDOW SASH SPRING BALANCE IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 30, 2026 |
| Jun 3, 2026 | B | Apt 6 · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ESCUTCHEON PLATE AT RISER IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Jul 8, 2026 |
| Jun 3, 2026 | B | Apt 6 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Jul 8, 2026 |
| Jun 3, 2026 | B | Apt 6 · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF VINYL TILES CREATING A TRIP HAZARD IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Jul 8, 2026 |
| Nov 18, 2025 | A | Apt 12 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS, CEILINGS, DOORS, DOOR FRAMES, AND WINDOW FRAMES IN THE ENTIRE APARTMENT LOCATED AT APT 12, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Feb 21, 2026 |
| Feb 7, 2025 | B | Apt 11 · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE DEVICE IN THE ENTIRE APARTMENT LOCATED AT APT 11, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 14, 2025 |
| Feb 7, 2025 | B | Apt 11 · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE DEVICE IN THE ENTIRE APARTMENT LOCATED AT APT 11, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 14, 2025 |
| Jan 24, 2025 | B | Apt 6 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... MORE THAN (10) SQ FT AT 1ST WINDOW FROM SOUTH AT WEST, NORTH WALL AND WEST WALL IN THE FOYER LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Feb 28, 2025 |
| Jan 24, 2025 | C | Apt 6 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st WINDOW FRAME FROM NORTH AT EAST WALL IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT | Mar 3, 2025 |
| Jan 24, 2025 | C | Apt 6 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st WINDOW FRAME FROM WEST AT NORTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT | Mar 3, 2025 |
| Jan 9, 2025 | B | Apt 11 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10 SQ FT AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 11, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 13, 2025 |
| Apr 20, 2023 | A | Apt 3 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, NORTH WALL, EAST WALL IN THE BATHROOM LOCATED AT APT 3, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jul 24, 2023 |
| Sep 28, 2022 | B | Apt 3 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 2, 2022 |
| Sep 15, 2022 | C | Apt 6 · § 27-2056.7 ADM CODE: CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES. | Sep 19, 2022 |
| Sep 15, 2022 | C | Apt 6 · § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS. | Sep 19, 2022 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 26, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL WALL OUTLET AT NORTH WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Oct 26, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRIAL OUTLET AT EAST WALL IN THE FOYER LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Oct 26, 2026 | HPD B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK THE CEILING IN THE BATHROOM LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Oct 26, 2026 | HPD C | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE BATHROOM LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Oct 26, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE WASH BASIN TO CABINET IN THE BATHROOM LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Oct 26, 2026 | HPD B | § 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET .. IN THE BATHROOM LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Oct 26, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOWER WINDOW SASH SPRING BALANCE IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 1, 2026, 10:06 AM ET. BBL 2024000023.