Staten Island · Block 781 · Lot 6 · 10314

680 Harris Avenue

1 floors · 2 apartments · 1,848 sq ft · built 1970 · class B2 · owner of record: Li, Rong Jiu

4open violations
$8,750ECB/OATH penalties owed
0HPD class C (immediately hazardous)
290dto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Check
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 290 days
Required only if the owner doesn't live there

Open violations

ECB / OATH (4) · $8,750 owed
IssuedViolationHearingBalance
Jul 31, 2026Unknown CLASS - 1
OBSERVED AT EXP 4 ELECTRICAL CONDUIT RUNNING FROM HOUSE AND ENTERING NEW WOOD FRAMED STRUCTURE. ALSO AN ELECTRICAL DISCONNECT FOR MINISPLIT AT SIDE OF NEW WOOD STRUCTURE. INSIDE STRUCTURE OBSERVED BX CABLES HAN
#39198759P
Mar 29, 2027
PENDING
$2,500
Jul 31, 2026Construction CLASS - 1
AT EXP 4 OBSERVED WORKERS ACTIVELY INSTALLING COPPER WATER LINES FROM SIDE OF HOUSE TO A NEW FRAMED STRUCTURE IN YARD. COPPER RUNS ALONG SIDE OF HOUSE AND ENTERS STRUCTURE., OBTAIN PERMIT
#39198758N
Mar 29, 2027
PENDING
$2,500
Jul 31, 2026Zoning CLASS - 2
AT EXP 4 OBSERVED A VINYL COMBUSTIBLE SHED LESS THAN THE REQUIRED 3' FROM PROPERTY LINE. SHED MEASURES 8" FROM PROP LINE AT EXP 4 AND 13" AT EXP 1. THE RCNY 101-14 REQUIRE MIN 3' FROM PROPERTY LINES.; 101-14, C
#39198757L
Mar 29, 2027
PENDING
$1,250
Jul 31, 2026Construction CLASS - 1
AT EXP 4 A WOOD FRAMED STRUCT, APPROX 18L X 12W X 15H ON CONCRETE FOUNDATION, ACTIVELY BEING CONSTRUCTED. STRUCT IS SIDED, ROOFED W/2 SKYLIGHTS. NO FRONT ENTRY DOOR AND INT OPEN EXPOSED STUDS AND RAFTERS. ALSO
#39198756J
Mar 29, 2027
PENDING
$2,500
DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Jul 31, 2026ECBUnknown: OBSERVED AT EXP 4 ELECTRICAL CONDUIT RUNNING FROM HOUSE AND ENTERING NEW WOOD FRAMED STRUCTURE. ALSO AN ELECTRICAL DISCONNECT FOR MINISPLIT AT SIDE OF NEW WOOD STRUCTURE. INSIDE STRUCTURE OBSERVED BX CABLES HANOpen
Jul 31, 2026ECBConstruction: AT EXP 4 OBSERVED WORKERS ACTIVELY INSTALLING COPPER WATER LINES FROM SIDE OF HOUSE TO A NEW FRAMED STRUCTURE IN YARD. COPPER RUNS ALONG SIDE OF HOUSE AND ENTERS STRUCTURE., OBTAIN PERMITOpen
Jul 31, 2026ECBZoning: AT EXP 4 OBSERVED A VINYL COMBUSTIBLE SHED LESS THAN THE REQUIRED 3' FROM PROPERTY LINE. SHED MEASURES 8" FROM PROP LINE AT EXP 4 AND 13" AT EXP 1. THE RCNY 101-14 REQUIRE MIN 3' FROM PROPERTY LINES.; 101-14, COpen
Jul 31, 2026ECBConstruction: AT EXP 4 A WOOD FRAMED STRUCT, APPROX 18L X 12W X 15H ON CONCRETE FOUNDATION, ACTIVELY BEING CONSTRUCTED. STRUCT IS SIDED, ROOFED W/2 SKYLIGHTS. NO FRONT ENTRY DOOR AND INT OPEN EXPOSED STUDS AND RAFTERS. ALSOOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 15, 2026, 3:44 AM ET. BBL 5007810006.

Look up another building