1 floors · 2 apartments · 1,848 sq ft · built 1970 · class B2 · owner of record: Li, Rong Jiu
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 290 days | Required only if the owner doesn't live there |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 31, 2026 | Unknown CLASS - 1 OBSERVED AT EXP 4 ELECTRICAL CONDUIT RUNNING FROM HOUSE AND ENTERING NEW WOOD FRAMED STRUCTURE. ALSO AN ELECTRICAL DISCONNECT FOR MINISPLIT AT SIDE OF NEW WOOD STRUCTURE. INSIDE STRUCTURE OBSERVED BX CABLES HAN #39198759P | Mar 29, 2027 PENDING | $2,500 |
| Jul 31, 2026 | Construction CLASS - 1 AT EXP 4 OBSERVED WORKERS ACTIVELY INSTALLING COPPER WATER LINES FROM SIDE OF HOUSE TO A NEW FRAMED STRUCTURE IN YARD. COPPER RUNS ALONG SIDE OF HOUSE AND ENTERS STRUCTURE., OBTAIN PERMIT #39198758N | Mar 29, 2027 PENDING | $2,500 |
| Jul 31, 2026 | Zoning CLASS - 2 AT EXP 4 OBSERVED A VINYL COMBUSTIBLE SHED LESS THAN THE REQUIRED 3' FROM PROPERTY LINE. SHED MEASURES 8" FROM PROP LINE AT EXP 4 AND 13" AT EXP 1. THE RCNY 101-14 REQUIRE MIN 3' FROM PROPERTY LINES.; 101-14, C #39198757L | Mar 29, 2027 PENDING | $1,250 |
| Jul 31, 2026 | Construction CLASS - 1 AT EXP 4 A WOOD FRAMED STRUCT, APPROX 18L X 12W X 15H ON CONCRETE FOUNDATION, ACTIVELY BEING CONSTRUCTED. STRUCT IS SIDED, ROOFED W/2 SKYLIGHTS. NO FRONT ENTRY DOOR AND INT OPEN EXPOSED STUDS AND RAFTERS. ALSO #39198756J | Mar 29, 2027 PENDING | $2,500 |
None open.
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Jul 31, 2026 | ECB | Unknown: OBSERVED AT EXP 4 ELECTRICAL CONDUIT RUNNING FROM HOUSE AND ENTERING NEW WOOD FRAMED STRUCTURE. ALSO AN ELECTRICAL DISCONNECT FOR MINISPLIT AT SIDE OF NEW WOOD STRUCTURE. INSIDE STRUCTURE OBSERVED BX CABLES HAN | Open |
| Jul 31, 2026 | ECB | Construction: AT EXP 4 OBSERVED WORKERS ACTIVELY INSTALLING COPPER WATER LINES FROM SIDE OF HOUSE TO A NEW FRAMED STRUCTURE IN YARD. COPPER RUNS ALONG SIDE OF HOUSE AND ENTERS STRUCTURE., OBTAIN PERMIT | Open |
| Jul 31, 2026 | ECB | Zoning: AT EXP 4 OBSERVED A VINYL COMBUSTIBLE SHED LESS THAN THE REQUIRED 3' FROM PROPERTY LINE. SHED MEASURES 8" FROM PROP LINE AT EXP 4 AND 13" AT EXP 1. THE RCNY 101-14 REQUIRE MIN 3' FROM PROPERTY LINES.; 101-14, C | Open |
| Jul 31, 2026 | ECB | Construction: AT EXP 4 A WOOD FRAMED STRUCT, APPROX 18L X 12W X 15H ON CONCRETE FOUNDATION, ACTIVELY BEING CONSTRUCTED. STRUCT IS SIDED, ROOFED W/2 SKYLIGHTS. NO FRONT ENTRY DOOR AND INT OPEN EXPOSED STUDS AND RAFTERS. ALSO | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 15, 2026, 3:44 AM ET. BBL 5007810006.