6 floors · 115 apartments · 133,323 sq ft · built 1941 · class D7 · owner of record: Y Zevzal Rtly Assoc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 68 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 68 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 68 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 84 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 133,323 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 189 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 189 days | Annual filing |
| Energy audit and retro-commissioning (2030) Likely applies Local Law 87 · Calendar year 2030 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2210). Agency page | Dec 31, 2030 in 1529 days | Next due 2030 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-02-03 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 11, 2024 | Local Law CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #911033. REMEDY: SUBMIT ACCEPTABLE REQU #37028173N | Aug 27, 2024 ADMIT/IN-VIO | $0 |
| Mar 7, 2020 | Construction CLASS - 2 FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES.NOTE:ATTHE TIME OF INSPECTION FACADE OBSERVE DEFECTS SUCH AS.(1)EXPOSURE#1(FRONT EAST FACADE)CRACK/DETERIORATED/LOOSE MASONRY MORTAR AT MULTIPLE LO #35458587K | Jan 26, 2021 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| May 7, 2025 | FAILURE TO CORRECT SWARMP CONDITIONS (FACADE) CYCLE 9 FAILURE TO CORRECT SWARMP CONDITIONS #00057 | DOB VIOLATION - ACTIVE |
| Feb 11, 2025 | HAZARDOUS CONDITION (FACADE) CYCLE 9B UNSAFE REPORT FILED #912022 | DOB VIOLATION - ACTIVE |
| Feb 22, 2023 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 #01118 | DOB VIOLATION - ACTIVE |
| Apr 29, 2021 | FAILURE TO POST ENERGY GRADE/SCORE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 #2004456 | DOB VIOLATION - ACTIVE |
| Aug 30, 2013 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 #01810 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| May 7, 2025 | Facades FISPFCS CYCLE 9 FAILURE TO CORRECT SWARMP CONDITIONS | Active |
| Feb 11, 2025 | Facades FISPHAZ CYCLE 9B UNSAFE REPORT FILED | Active |
| Feb 22, 2023 | Facades FISPNRF CYCLE 9B NO REPORT FILED | Active |
| Apr 29, 2021 | Energy Grade - LL33 FTP-EN-EGRDEA | Active |
| Jul 31, 2018 | Facades FISPNRF FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Dec 4, 2023 | A | Apt A26 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 4th ROOM FROM EAST, THE FOYER LOCATED AT APT A26, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Mar 8, 2024 |
| Dec 4, 2023 | C | Apt A26 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) WEST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT A26, 2nd STORY, 2nd APARTMENT FROM | Jan 11, 2024 |
| Dec 4, 2023 | C | Apt A26 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) WEST WALL IN THE 4th PRIVATE HALLWAY FROM EAST LOCATED AT APT A26, 2nd STORY, 2nd APAR | Jan 11, 2024 |
| Oct 6, 2023 | C | § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS. | Oct 10, 2023 |
| Oct 6, 2023 | C | § 27-2056.4(H) AND 27-2056.17 ADM CODE -CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES. | Oct 10, 2023 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 24, 2026, 3:41 PM ET. BBL 4022100018.