6 floors · 58 apartments · 45,354 sq ft · built 1967 · class D4 · owner of record: Selfridge Tenants Inc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 61 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 61 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 61 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 77 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 45,354 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 182 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 182 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 305 days | Registered through 2027-09-01 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-08-03 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 11, 2024 | Construction CLASS - 3 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLAINT MANNER. AT TIME OF APPOINTMENT INSPECTION OBSERVED, VISIBLE CRACKS ARE AT LIVING ROOM, BEDROOM, BATHROOM & KITCHEN AREA., REPAIR AND OR REPLACE #39124575Z | Nov 19, 2024 DEFAULT | $500 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Sep 25, 2026 | Benchmarking - LL84 DQ-EN-BENCH FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Sep 15, 2025 | C | Apt 4C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 11, 2025 |
| Sep 15, 2025 | B | Apt 4C · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK THE CEILING AND EAST WALL IN THE 1st BATHROOM FROM EAST AT SOUTH LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 20, 2025 |
| Sep 15, 2025 | B | Apt 4C · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 20, 2025 |
| Sep 15, 2025 | B | Apt 4C · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AT BATHROOM IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 20, 2025 |
| Sep 15, 2025 | B | Apt 4C · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING AT BATHROOM IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 20, 2025 |
| Sep 15, 2025 | B | Apt 4C · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND NORTH WALL IN THE 1st BATHROOM FROM EAST AT SOUTH LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 20, 2025 |
| Jul 11, 2025 | B | Apt 4C · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''A-E'', AT SOUTH | Aug 15, 2025 |
| Jul 11, 2025 | B | Apt 4C · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING, EAST, AND SOUTH WALLS IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''A-E'', AT SOUTH | Aug 15, 2025 |
| Jul 11, 2025 | A | Apt 4C · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT SOUTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''A-E'', AT SOUTH | Oct 14, 2025 |
| Jul 2, 2025 | A | § 27-2014 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT ALL BALCONIES, ALL STORIES 2ND STACK FROM NORTH AT BUILDING FRONT AT FIRE ESCAPE | Oct 5, 2025 |
| Jul 2, 2025 | C | Apt 4C · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR UNKEYED PLASTER AT CEILING EAST AND SOUTH WALL IN THE BATHROOM LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''A-E'' | Jul 8, 2025 |
| Jul 2, 2025 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH AT 2ND FIRE DOOR FROM PUBLIC HALL LEADING TO MAIL ROOM SECTION NORTH AT BASEMENT | Aug 6, 2025 |
| Jul 2, 2025 | C | Apt 4C · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR UNKEYED PLASTER AT CEILING EAST AND SOUTH WALL IN THE BATHROOM LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''A-E'' | Jul 8, 2025 |
| Jul 2, 2025 | B | Apt 4C · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING EAST AND SOUTH WALL IN THE BATHROOM LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''A-E'' | Aug 6, 2025 |
| Jul 2, 2025 | A | § 27-2014 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT ALL BALCONIES, ALL STORIES 1ST STACK FROM NORTH AT BUILDING FRONT AT FIRE ESCAPE | Oct 5, 2025 |
| Jul 2, 2025 | B | Apt 4C · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING EAST AND SOUTH WALL IN THE BATHROOM LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''A-E'' | Aug 6, 2025 |
| Jul 2, 2025 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH AT 1ST FIRE DOOR FROM PUBLIC HALL LEADING TO MAIL ROOM SECTION NORTH AT BASEMENT | Aug 6, 2025 |
| Apr 16, 2025 | A | § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL | Jul 20, 2025 |
| Apr 16, 2025 | C | § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM AT PUBLIC HALL | Apr 22, 2025 |
| Dec 14, 2023 | C | Apt 5F · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SHUT OFF VALVE AT RADIATOR AT WEST WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 5F, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST | Dec 20, 2023 |
| Date | Source | What | Now |
|---|---|---|---|
| Sep 25, 2026 | DOB Safety | Benchmarking - LL84: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 31, 2026, 6:40 PM ET. BBL 4031930001.