3 floors · 3 apartments · 2,475 sq ft · built 2006 · class C0 · owner of record: 676-678 221st Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 45 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 45 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 61 days | Annual |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 410 days | Next cycle year 2027 |
None open.
None open.
| Issued | Violation | Status |
|---|---|---|
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 12) | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| May 8, 2026 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Aug 11, 2026 |
| Jun 13, 2025 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Sep 16, 2025 |
| Jun 6, 2025 | B | Apt 3 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INOPERABLE GFCI ELECTRICAL OUTLET AT NORTH WALL [ NO POWER ] IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Jul 11, 2025 |
| Jun 6, 2025 | A | Apt 3 · § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE VENTILATION VENT COVER AT CEILING IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 9, 2025 |
| Jun 6, 2025 | A | § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX MISSING SIGN AT PUBLIC HALL, 1st STORY | Sep 9, 2025 |
| Jun 6, 2025 | C | § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM MISSING SIGN AT PUBLIC HALL, 1st STORY | Jun 12, 2025 |
| Jun 6, 2025 | A | § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY | Sep 9, 2025 |
| Jun 6, 2025 | B | Apt 3 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INOPERABLE 2ND ELECTRICAL OUTLET FROM NORTH AT WEST WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Jul 11, 2025 |
| Jun 6, 2025 | B | Apt 3 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INOPERABLE 2ND ELECTRICAL OUTLET FROM NORTH AT EAST WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Jul 11, 2025 |
| Jun 6, 2025 | B | Apt 3 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INOPERABLE 1ST ELECTRICAL OUTLET FROM NORTH AT EAST WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Jul 11, 2025 |
| Jun 6, 2025 | B | Apt 3 · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING DEVICE IN THE ENTIRE APARTMENT LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Jul 11, 2025 |
| Jun 6, 2025 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND EAST WALL [ BY PUBLIC STAIRS ] AT PUBLIC HALL, 1st STORY | Sep 9, 2025 |
| Jun 6, 2025 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIALS AT EAST WALL AND CEILING [ BY PUBLIC STAIRS ] AT PUBLIC HALL, 1st STORY | Jul 11, 2025 |
| Jun 6, 2025 | A | §27-2018.1 HMC: POST, IN THE FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN THE NOTICE ABOUT PREVENTION, DETECTION AND REMOVAL OF BEDBUG INFESTATION REQUIRED BY §27-2018.1 IN COMMON AREA OF THE BUILDING OR PROVIDE TO EACH TENANT, ACCORDING TO THE CERTIFICATION MADE ON SUCH ANNUAL BEDBUG REPORT. | Sep 9, 2025 |
| Jun 6, 2025 | A | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY | Sep 9, 2025 |
| Jun 6, 2025 | A | § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING. | Sep 9, 2025 |
| Apr 17, 2024 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Jul 21, 2024 |
| Mar 6, 2024 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT BOILER ROOM | Mar 12, 2024 |
| Mar 6, 2024 | C | Apt 1 · § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Mar 6, 2024 |
| Mar 6, 2024 | C | Apt 1 · § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES IN KITCHEN AND BATHROOM LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Mar 12, 2024 |
| Feb 14, 2024 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCK DOOR AT BOILER ROOM | Feb 20, 2024 |
| Feb 14, 2024 | B | Apt 1 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Mar 20, 2024 |
| Feb 14, 2024 | C | Apt 1 · § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES NO HOT WATER SUPPLY IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Feb 20, 2024 |
| Feb 14, 2024 | C | Apt 1 · § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Feb 14, 2024 |
| Jan 24, 2024 | B | Apt 1 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL IN THE BATHROOM LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Feb 28, 2024 |
| Jan 24, 2024 | C | Apt 1 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Jan 30, 2024 |
| Jan 24, 2024 | C | Apt 1 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND NORTH WALL INSIDE CLOSET IN THE 2nd ROOM FROM NORTH LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Jan 30, 2024 |
| Jan 19, 2024 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT BOILER ROOM | Jan 25, 2024 |
| Jan 19, 2024 | C | Apt 1STFLA · § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 1STFLA, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Jan 19, 2024 |
| Dec 28, 2023 | B | Apt 1 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL VENTILATION SYSTEM AT CEILING IN THE KITCHEN LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 1, 2024 |
| Dec 28, 2023 | C | Apt 1 · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Dec 28, 2023 |
| Dec 28, 2023 | B | Apt 1 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING INSIDE CLOSET IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 1, 2024 |
| Dec 28, 2023 | B | Apt 1 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING INSIDE CLOSET IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 1, 2024 |
| Dec 28, 2023 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT BOILER ROOM | Jan 3, 2024 |
| Dec 28, 2023 | B | Apt 1 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 1, 2024 |
| Dec 28, 2023 | B | Apt 1 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 1, 2024 |
| Dec 11, 2023 | B | Apt 1 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE BATHROOM LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Jan 15, 2024 |
| Dec 11, 2023 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM AT BOILER ROOM | Dec 17, 2023 |
| Dec 11, 2023 | C | Apt 1 · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE 4th ROOM FROM NORTH LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Dec 9, 2023 |
| Dec 11, 2023 | C | Apt 1 · § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE 4th ROOM FROM NORTH LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Dec 9, 2023 |
| Dec 11, 2023 | B | Apt 1 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING INSIDE CLOSET IN THE 4th ROOM FROM NORTH LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Jan 15, 2024 |
| Oct 5, 2023 | B | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT SOUTH WALL AT BASEMENT | Nov 9, 2023 |
| Mar 30, 2023 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Jul 3, 2023 |
| Mar 9, 2022 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Jun 12, 2022 |
| Apr 19, 2021 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Jul 23, 2021 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 16, 2026, 3:21 PM ET. BBL 2046550038.