21 floors · 73 apartments · 82,830 sq ft · built 1987 · class RM · owner of record: Palestroni Alfiero
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 60 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 60 days | Annual |
| Annual boiler inspection (5 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-09-28 (Accepted). Agency page | Dec 31, 2026 in 60 days | 3 of 5 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 76 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 82,830 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 181 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 181 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Facade inspection report (Cycle 10C) Applies Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $96,000 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2029 in 843 days | Filing window not open yet |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1156 days | Next cycle year 2029 |
| Energy audit and retro-commissioning (2031) Likely applies Local Law 87 · Calendar year 2031 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 631). Agency page | Dec 31, 2031 in 1886 days | Next due 2031 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Feb 8, 2024 | Construction CLASS - 1 28-323.1 FAILURE TO MAINTAIN PARKING STRUCTURE IN SAFE CONDITION.AS NOTED:ON AN ACTIVE PARKING STRUCTURE CONSISTING OF 1 LEVEL(CELLAR)BELOW 21 FL BUILDING OBSERVED SPALLING CONCRETE/EXPOSED REBAR ON BOTTOM OF S #35680036L | Apr 18, 2024 DEFAULT | $12,500 |
| Jul 10, 2023 | Construction CLASS - 2 AT TIME OF INSPECTION OF AN ACTIVE JOBSITE, I OBSERVED THAT I-BEAM OUTRIGGERS AND C-HOOKS WERE INSTALLED AT ROOF LEVEL. UPON REQUEST MANUFACTURER SPECS FOR I-BEAM OUTRIGGERS AND FOR CHOOKS, NONE WAS PROVIDED. S #39518996Z | Sep 14, 2023 ADMIT/IN-VIO | $0 |
| Jul 10, 2023 | Construction CLASS - 2 AT TIME OF INSPECTION OF AN ACTIVE JOBSITE, I OBSERVED AT ROOF LEVEL THAT OUTRIGGER SETUPS WERE NOT INSTALLED WITH WINDSAFE TRUST SYSTEM AS SHOWN IN CD-5. STOP ALL USE OF OUTRIGGER SUSPENDED SCAFFOLDS. #39518995R | Sep 14, 2023 ADMIT/IN-VIO | $0 |
| Jul 10, 2023 | Construction CLASS - 2 AT TIME OF INSPECTION OF AN ACTIVE JOBSITE, I OBSERVED AT ROOF LEVEL THAT THE C-HOOKS WERE INSTALLED WITHOUT BLOCKING AND 3 POINTS OF CONTACT TO PARAPET WALL AS PER C-HOOK DRAWING. THIS POSES A COLLAPSE HAZARD #39518989K | Sep 14, 2023 ADMIT/IN-VIO | $0 |
| Oct 12, 2022 | Construction CLASS - 2 AT TIME OF INSPECTION OBSERVED AN ERECTED SIDEWALK SHED AT THE BUILDINGS # 1 AND # 4 EXPOSURES WITH A VALID PERMIT, SIDEWALK SHED NOT ERECTED AS PER CODE. AT EXPOSURE #4 SIDEWALK SHED NOT EXTENDED 20 FEET AS PE #39509418M | Jul 26, 2023 DEFAULT | $0 |
| Sep 9, 2022 | Construction CLASS - 1 FIELD CONDITION OBSERVED CONTRARY TO CD-5. SAFETY LINES ARE TANGLED AND UNPROTECTED; DUCT TAPE USED TO FASTEN JUNIOR BEAM TO SCAFFOLD FRAME; COUNTERWEIGHT ANCHORING IS CONTRARY TO CD-5 ON ALL OUTRIGGERS; SUSPEN #39506135Z | Mar 23, 2023 IN VIOLATION | $0 |
| Sep 9, 2022 | Site Safety CLASS - 1 FAILED TO PROVIDE QSP LOG-BOOK; FAILED TO PROVIDE "PARAPET LETTER", FAILED TO PROVIDE DESIGN DRAWINGS FOR BRACING USED AT BALCONIES ON CORNER OF EXPOSURE #3 AND #4.STOP ALL FACADE WORK AND USE OF SUSPENDED SCAF #39506139X | Mar 23, 2023 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| May 28, 2024 | CONSTRUCTION EMERGENCY WORK ORDER.NOTE ON AN ACTIVE PARKING STRUCTURE CONSISTING OF 1 LEVEL BELOW A 21 FLOOR BUILDING,OBSERVED SPALLING CONCRETE,EXPOSED R EBAR ON THE BOTTOM OF RAMP AT SEVERAL LOCATIONS CAUSING IMMEDIATE HAZA RD TO TRAFFIC.REMEDY:OWNER TO RETAIN A NYS REGISTERED PROFESSIONAL TO DIRECT AND SUPERV #LL10202MK | DOB VIOLATION - ACTIVE |
| Apr 17, 2024 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00011 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION #00141 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION #01286 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION #03672 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION #02541 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00027 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00026 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION #01357 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION #00147 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION #02594 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION #03734 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION #01238 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION #00091 | DOB VIOLATION - ACTIVE |
| Dec 29, 2016 | CONSTRUCTION THE BOROUGH COMMISSIONER HAS ISSUED A STOP WORK ORDER FOR APPLICATION #121680047 DUE TO THE WITHDRAWAL OF THE SPECIAL INSPECTION APPLICANT O F RECORD. STOP ALL WORK EXCEPT TO MAKE SITE SAFE AND PROVIDE NECESSARY DOCUMENTATION #0201MS | DOB VIOLATION - ACTIVE |
| Apr 22, 2010 | ELEVATOR #9028/333490 | DOB VIOLATION - ACTIVE |
| Apr 21, 2004 | ELEVATOR #9444/198447 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Apr 17, 2024 | AEUHAZ FTC-AEU-HAZ | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction | Active |
| Jun 30, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 30, 2023 | AEUHAZ FTC-AEU-HAZ | Active |
| Jun 30, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 30, 2023 | AEUHAZ FTC-AEU-HAZ | Active |
| Jun 20, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler HBLVIO VIOLATION ISSUED - FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE BOILER INSPECTION | Active |
| Apr 25, 2023 | Boiler HBLVIO VIOLATION ISSUED - FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE BOILER INSPECTION | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 1, 2026, 3:47 PM ET. BBL 1006317502.