3 floors · 4 apartments · 6,048 sq ft · built 1931 · class S9 · owner of record: Whcs Real Estate Ltd/Assignee
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 63 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 63 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 79 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 307 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 794 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 3, 2001 | Plumbing Hazardous PLUMBING WORK WITHOUT A PERMIT.BATHROOM INSTALLED 2ND FLOOR INPROPER WASTE LLINE INSTALLED WITHOUT PROPER VENTING OF WASTE LINES.REMEDY:OBTAIN A PERMIT IF FEASIBLE OR RESTORE TO PROPER LEGAL CONDITION. #34273765R | Oct 29, 2001 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Feb 18, 2011 | CONSTRUCTION #1002RM | DOB VIOLATION - ACTIVE |
| May 14, 2001 | PLUMBING HAZARDOUS #3CT1 | DOB VIOLATION - ACTIVE |
| Apr 3, 2001 | PLUMBING PLUMBING WORK WITHOUT A PERMIT. BATHROOM INSTALLED 2ND FLOOR IMPROPER WASTE LINE INSTALLED WITHOUT PROPER VENTING OF WASTE LINES REMEDY: OBTAIN A PERMIT IF FEASIBLE OR RESTORE TO PRIOR LEGAL CONDITION #3CT1 | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
| Apr 3, 2001 | PLUMBING HAZARDOUS #3CT3 | DOB VIOLATION - ACTIVE |
| Jul 10, 1998 | CONSTRUCTION WORK WITHOUT A PERMIT. HAVING ERECTED PARTITIONS AT FIRST FLOOR FRONT TO FORM A TAKE OUT SERVICE. (DUNKIN DONUTS) REMEDY: OBTAIN APPROVALS AND PERMITS FOR ALL CONSTRUCTION PERFORMED #10J1 | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jun 2, 2021 | C | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT NORTH WALL AT PUBLIC HALL, 2nd STORY | Jun 8, 2021 |
| Jun 2, 2021 | B | Apt 2NDFLO · § 27-2026 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE CONNECTION WASTE LINE AT SINK IN THE KITCHEN LOCATED AT APT 2NDFLO, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jul 7, 2021 |
| Jun 2, 2021 | B | Apt 2NDFLO · § 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT CEILING IN THE BATHROOM LOCATED AT APT 2NDFLO, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jul 7, 2021 |
| Jun 2, 2021 | B | Apt 2NDFLO · § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 2NDFLO, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jul 7, 2021 |
| Jun 2, 2021 | B | Apt 2NDFLO · § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 2NDFLO, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jul 7, 2021 |
| Jun 2, 2021 | B | Apt 2NDFLO · § 27-2005 ADMIN. CODE: PROPERLY SECURE THE LOOSE WASHBASIN IN THE BATHROOM LOCATED AT APT 2NDFLO, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jul 7, 2021 |
| Jun 2, 2021 | B | Apt 2NDFLO · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2NDFLO, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jul 7, 2021 |
| Sep 4, 2019 | B | Apt 1 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING 6 SQ.FT IN THE BATHROOM LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH ORIGINAL VIOLATION 12953526 ISSUED 11-MAR-19 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or | Oct 9, 2019 |
| Mar 13, 2019 | B | Apt 1 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Apr 17, 2019 |
| Mar 13, 2019 | A | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED | Jun 16, 2019 |
| Mar 13, 2019 | A | Apt 1 · § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE GROUT AT NORTH WALL TILES IN THE BATHROOM LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jun 16, 2019 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 29, 2026, 10:10 AM ET. BBL 3058560001.