Manhattan · Block 1263 · Lot 5 · 10036

67 West 47 Street

16 floors · 79,827 sq ft · built 1928 · class O6 · owner of record: Federation Associates

24open violations
$800ECB/OATH penalties owed
0HPD class C (immediately hazardous)
171dto Energy and water benchmarking

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 50 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 79,827 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 171 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 171 days
Annual filing
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1146 days
Next cycle year 2029
Energy audit and retro-commissioning (2033) Likely applies
Local Law 87 · Calendar year 2033
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1263). Agency page

Dec 31, 2033
in 2607 days
Next due 2033
Facade inspection report (Cycle 10C) Applies
Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $114,000 in late-filing or failure-to-file penalties. Agency page

On fileCycle 10 filing on record: SAFE (2025-04-09)

Open violations

ECB / OATH (6) · $800 owed
IssuedViolationHearingBalance
Apr 27, 2026Unknown CLASS - 1
I OBSERVED INSTALLATION OF NEW GENERAL WIRING FOR RECESS LIGHTING AND RECEPTACLES IN GROUND FLOOR STORE WITHOUT AN ELECTRICAL PERMIT ON FILE., OBTAIN PERMIT; OBTAIN ELECTRICAL PERMIT
#39186101K
Oct 15, 2026
IN VIOLATION
$800
Jun 17, 2024Construction CLASS - 2
A.C. 27-929.1, FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY AREGISTERED DESIGN PROFESSIONAL IN AN OFFICE BUILDING 100 FEET OR MORE
#37028845R
Feb 6, 2025
IN VIOLATION
$0
Feb 28, 2023Construction CLASS - 2
A.C.27-929.1,FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL IN AN OFFICE BUILDING 100' OR MORE IN HE
#37025454X
Dec 21, 2023
IN VIOLATION
$0
Mar 30, 2021Construction CLASS - 2
27-929.1 AC27-929.1,FAILURE TO COMPLETE INSTALLATION OF FULL SYSTEM OFAUTOMATIC SPRINKLERS&FILE FINAL SPRINKLER REPORT PREPARED BY REGISTERED DESIGN PROFESSIONAL IN OFFICE BLDG 100' OR MORE IN HT IN EXISTENCE O
#37020960X
Oct 28, 2021
IN VIOLATION
$0
Mar 30, 2020Construction CLASS - 2
SEC. 27-929.1 AC 27-929.1 FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS & FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL BY 7/1/19,IN AN OFFICE BLDG
#37018919L
Jul 2, 2020
IN VIOLATION
$0
Nov 15, 2019Construction CLASS - 2
AC279291-FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY REGISTERED DESIGN PROFFESIONAL BY JULY 1,2019,IN AN OFFICE BUILDING 100 FEET
#37016506Y
Feb 20, 2020
IN VIOLATION
$0
DOB (7)
IssuedViolationStatus
Feb 22, 2024NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
#00243
DOB VIOLATION - ACTIVE
Sep 3, 2019SPRINKLER
FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019
#NRF00458
DOB VIOLATION - ACTIVE
Sep 15, 2017ELEVATOR ANNUAL INSPECTION / TEST
VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST
#01214
DOB VIOLATION - ACTIVE
Sep 15, 2017ELEVATOR ANNUAL INSPECTION / TEST
VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST
#01216
DOB VIOLATION - ACTIVE
Sep 15, 2017ELEVATOR ANNUAL INSPECTION / TEST
VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST
#01215
DOB VIOLATION - ACTIVE
Sep 15, 2017ELEVATOR ANNUAL INSPECTION / TEST
VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST
#01213
DOB VIOLATION - ACTIVE
Aug 15, 2012ELEVATOR

#ACC101181
DOB VIOLATION - ACTIVE
DOB NOW Safety (11)
IssuedViolationStatus
Aug 19, 2026AEUHAZ FTC-AEU-HAZ
Active
Feb 22, 2024Facades FISPNRF
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
Active
Sep 3, 2019Sprinklers FTF-SP-FINAL
Active
Sep 15, 2017Elevators EVCAT1
Active
Sep 15, 2017Elevators EVCAT1
Active
Sep 15, 2017Elevators EVCAT1
Active
Sep 15, 2017Elevators EVCAT1
Active
Aug 15, 2012Elevators E
Active
Aug 15, 2012Elevators E
Active
Aug 15, 2012Elevators E
Active
Aug 15, 2012Elevators E
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Aug 19, 2026DOB SafetyAEUHAZ: Open

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 11, 2026, 8:20 PM ET. BBL 1012630005.

Look up another building