| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 29, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: OBSERVEDGAS METER ROOM BEING USED TO STORE MATERIAL-20 BAGS OF ICE MELT, 2 LADDERS, 5 BOXES(MISC), GARBAGE BINS. REMEDY: REPAIR MATERIAL. #35734629H | Aug 21, 2026 POP/IN-VIO | $0 |
| Jul 29, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. USE OF PROHIBITED DOOR AND/OR HARDWARE PER BC 1008.1.8; 27-371(J). NOTED: SMOKE DOORSHAVE KICK-STOPS INSTALLED AT BOTTOM OF DOORS AT 3RD FLR-SMOKE DOORS NE #35734628X | Aug 21, 2026 POP/IN-VIO | $0 |
| Jul 29, 2026 | Construction CLASS - 2 RE-ISSUE #35725273L. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NO FIRE-STOPPING PER BC 712.3; 27-345. NOTED: IN BASEMENT AT ELECTRIC METER ROOM, THERE IS FIRE-STOPPING MISSING IN SEVERAL AREAS AROU #35734625K | Aug 21, 2026 POP/IN-VIO | $0 |
| Jul 29, 2026 | Construction CLASS - 2 RE-ISSUE #35725272J. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: OBSERVED ON 4TH CAFETERIA SMOKE DOOR EXIT SWINGS IN AND SHOULD SWING OUT SINCE IT IS A EXIT. REMEDY: REPAIR AND/OR REPLACE. #35734626M | Aug 21, 2026 POP/IN-VIO | $0 |
| Jul 29, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: INTERIORFPSC DOORS DO NOT SELF-CLOSE PROPERLY AT 3RD FLR-SMOKE DOOR NEAR STAIRCASE "E". CLASSROOM DOORS DO NOT SELF-CLOSE PROPERLY AT 4TH FLR RM #S- #35734627Y | Aug 21, 2026 POP/IN-VIO | $0 |
| Sep 4, 2025 | Construction CLASS - 2 REISSUE #35688855L-FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NO FIRESTOPPING IN ELECTRICAL ROOM. REMEDY: COMPLY WITH CODE. #35725273L | Oct 17, 2025 POP/IN-VIO | $0 |
| Sep 4, 2025 | Construction CLASS - 2 REISSUE #35688856N-FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: CAFE AT 4TH FLOOR HAS DOORS THAT OPEN AGAINST THE FLOW. REMEDY: COMPLY WITH CODE. #35725272J | Oct 17, 2025 POP/IN-VIO | $0 |
| Sep 23, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER:NO FIRESTOPPING PER BC 712.3;27-345.NOTED:AT CELLAR LEVEL-ELECTRICAL METER ROOM HAS PIPE LINES PENETRATING THROUGH THE WALL WITH OPENINGS THAT ARE MISSING F #35688855L | Nov 29, 2024 POP/IN-VIO | $0 |
| Sep 23, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:OBSERVED AT 4 FLR,THE IMPROVISED CAFETERIA RM.440/442 HAS EXISTING FIREPROOF SELF-CLOSING THAT ARE CURRENTLY SWINGING AGAINST THE FLOW OF EGRESS AND C #35688856N | Nov 29, 2024 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #06221 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #06222 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #06220 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #24483 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #31284 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #44101 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #31250 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #09280 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #09324 | DOB VIOLATION - ACTIVE |
| Nov 8, 2019 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT #04804 | DOB VIOLATION - ACTIVE |
| Nov 8, 2019 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT #04806 | DOB VIOLATION - ACTIVE |
| Nov 8, 2019 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT #04805 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 2, 2023 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction | Active |
| Oct 2, 2023 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 8, 2019 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT | Active |
| Nov 8, 2019 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT | Active |
| Nov 8, 2019 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Jul 29, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: OBSERVEDGAS METER ROOM BEING USED TO STORE MATERIAL-20 BAGS OF ICE MELT, 2 LADDERS, 5 BOXES(MISC), GARBAGE BINS. REMEDY: REPAIR MATERIAL. | Open |
| Jul 29, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. USE OF PROHIBITED DOOR AND/OR HARDWARE PER BC 1008.1.8; 27-371(J). NOTED: SMOKE DOORSHAVE KICK-STOPS INSTALLED AT BOTTOM OF DOORS AT 3RD FLR-SMOKE DOORS NE | Open |
| Jul 29, 2026 | ECB | Construction: RE-ISSUE #35725273L. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NO FIRE-STOPPING PER BC 712.3; 27-345. NOTED: IN BASEMENT AT ELECTRIC METER ROOM, THERE IS FIRE-STOPPING MISSING IN SEVERAL AREAS AROU | Open |
| Jul 29, 2026 | ECB | Construction: RE-ISSUE #35725272J. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: OBSERVED ON 4TH CAFETERIA SMOKE DOOR EXIT SWINGS IN AND SHOULD SWING OUT SINCE IT IS A EXIT. REMEDY: REPAIR AND/OR REPLACE. | Open |
| Jul 29, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: INTERIORFPSC DOORS DO NOT SELF-CLOSE PROPERLY AT 3RD FLR-SMOKE DOOR NEAR STAIRCASE "E". CLASSROOM DOORS DO NOT SELF-CLOSE PROPERLY AT 4TH FLR RM #S- | Open |