6 floors · 61 apartments · 76,830 sq ft · built 1915 · class D3 · owner of record: 75 St. Nicholas Place Owner Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 65 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 65 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 65 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 81 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 76,830 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 186 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 186 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 309 days | Registered through 2027-09-01 |
| Energy audit and retro-commissioning (2029) Likely applies Local Law 87 · Calendar year 2029 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2069). Agency page | Dec 31, 2029 in 1161 days | Next due 2029 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-06-18 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 18, 2025 | Boilers CLASS - 2 AS PER CLASS 2 B265 FAILURE TO FILE A COMPLETE BOILER INSPECTION REPORT FOR 2024 AS PER DOB RECORDS;CORRECT VIOLATION+SUBMIT CERTIFICATE OF CORRECTION #39160809K | Dec 4, 2025 IN VIOLATION | $0 |
| Aug 22, 2023 | Elevators CLASS - 2 CLASS 2: PHONE INOPERATIVE CONNECT SERVICE & PORGRAM TO 24 HR EMERGENCY OPERATOR. CAR DOOR MISALIGNED ADJUST TO CLOSE GAPS & MEET CLEARANCES. FAN INOPERATIVE CHECK WIRES & REPAIR. EVACUATION SIGNS MISSING PROVI #39093077R | Oct 26, 2023 DEFAULT | $0 |
| Dec 2, 2022 | Local Law CLASS - 2 FAILURE TO SUBMIT ACCEPTABLE REQUIRED CYCLE9A REPORT OF CRITICAL EXAM DOCUMENTING CONDITION OF EXTERIOR WALL&APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL912438.SUBMIT ACCEPTABLE REQUIRED TECHNICAL REPORT #37024111J | Feb 23, 2023 DEFAULT | $0 |
| Feb 22, 2022 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#39021072P ISSUED ON 4/14/2020 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.WORK DOES NOT CONFORM T #35568397R | Sep 15, 2022 DEFAULT | $12,500 |
| Aug 23, 2021 | Construction CLASS - 1 FAILURE TO COMPLY W/COMMISSIONER'S ORDER CONTAINED IN SUMMONS/V39021072P ISSUED4/14/20 &TO FILE C/C PURSUANT TO28-201.1&1RCNY102-01.WORK DOESNT CONFORM TO APPROVED CONST DOCS.COMPLY W/COMMISSIONER'S ORDER &/OR #35562600X | Dec 9, 2021 DEFAULT | $12,500 |
| Jul 8, 2021 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#39021072P ISSUED ON 4/14/2020 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.WORK DOES NOT CONFORM T #35534076K | Jan 27, 2022 DEFAULT | $12,500 |
| May 15, 2021 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#39021072P ISSUED ON 4/14/20 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.REM:COMPLY WITH COMMISSIO #35531200P | Jul 29, 2021 DEFAULT | $12,500 |
| Jan 25, 2021 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS.VIOLATION #39021072P ISSUED ON 04-14-20 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.WORK DOES NOT CONFORM TO #35526635H | Jul 7, 2022 DEFAULT | $6,250 |
| Nov 25, 2020 | Construction CLASS - 1 I OBSERVED IN BASEMENT NEWLY INSTALLED GAS PIPING, FITTINGS AND VALVES AND PERMIT # M00230791 ON FILE ONLY STATES THAT THE GAS PIPING WILL BE CAPPED AND REMOVED AND NO OTHER PERMITS COVERS THAT GAS PIPING INSTA #39032546L | May 20, 2021 IN VIOLATION | $0 |
| Nov 25, 2020 | Plumbing CLASS - 1 I OBSERVED NEWLY INSTALLED GAS PIPING AND NO PERMITS ON FILE THEREFORE NO PROPER TESTING WAS PERFORMED ON GAS LINES AS PER DOB, PERFORM TEST #39032548P | May 20, 2021 IN VIOLATION | $0 |
| Nov 25, 2020 | Plumbing CLASS - 1 I OBSERVED IN BASEMENT GAS PIPING, FITTINGS AND VALVES INSTALLED AND GAS METER IN THE ON POSITION AND NO PERMITS ON FILE THEREFORE NO GAS CERTIFICATIONS WERE GIVEN FOR GAS USAGE BY THE DOB, FILE FOR REQUIRED PE #39032595H | May 20, 2021 IN VIOLATION | $0 |
| Nov 25, 2020 | Zoning CLASS - 2 FAILURE TO PROVIDE ARC FAULT CIRCUIT INTERUPTES(AFCI)PROTECTION IN DWELLING UNITS.NO AFCI PROTECTION PROVIDED IN APARTMENTS 6B,6K AND 4D.REM:PROVIDED AFCI PROTECTION. #35494158K | Feb 11, 2021 DEFAULT | $0 |
| Nov 25, 2020 | Construction CLASS - 1 I OBSERVED IN BASEMENT AREA NEW SPRINKLER PIPING AND SPRINKLER HEADS INSTALLED OFF OF DOMESTIC WATER LINE AND NO PERMITS ON FILE, OBTAIN PERMIT #39032631X | May 20, 2021 IN VIOLATION | $0 |
| Nov 25, 2020 | Plumbing CLASS - 1 I OBSERVED NEWLY INSTALLED SPRINKLER PIPING AND SPRINKLER HEADS IN BASEMENT AREA AND NO PERMITS ON FILE; THEREFORE NO PROPER TESTING WAS PERFORMED BY THE DOB, PERFORM TEST #39032630Y | May 20, 2021 IN VIOLATION | $0 |
| Nov 25, 2020 | Construction CLASS - 1 I OBSERVED IN BASEMENT AREA FUTURE GAS CONNECTIONS THAT HAS VALVES INSTALLED BUT WERE NOT CONNECTED TO ANY APPLIANCE WHICH IS PROHIBITED AND NOT CODE COMPLAINT, REPAIR AND/REPLACE #39032547N | May 20, 2021 IN VIOLATION | $0 |
| Nov 25, 2020 | Unknown CLASS - 2 FAILURE TO PROVIDE ADEQUATE CIRCUIT OVERCURRENT PROTECTION DEVICE PER TABLE.NUMBER#1 THIN FUSED AT 200 AMPS IN BASEMENT DISCONNECT SWITCH.REM:PROVIDE ADEQUATE OVERCURRENT PROTECTION. #35494156R | Feb 11, 2021 DEFAULT | $0 |
| Nov 25, 2020 | Unknown CLASS - 1 UNAPPROVED UNSAFE UNSUITABLE ELECTRICAL EQUIPMENT DEVICES APPARATUS APPLIANCES MATERIALS OF WIRING IN USE.DEFECTIVE OUTLET IN APARTMENT 6J KITCHEN EXPOSE WIRING IN APARTMENT 3D.EXPOSE WIRING IN APARTMENT 3F KIT #35494159M | Feb 11, 2021 DEFAULT | $0 |
| Nov 24, 2020 | Construction CLASS - 1 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#39021072P ISSUED ON 04/14/20 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01. WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCU #35524182P | Feb 11, 2021 DEFAULT | $6,250 |
| Sep 28, 2020 | Cranes and Derricks CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION #39021072P ISSUED ON 04-14-20 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01 COMPLY WITH COMMISSIONER #35521196M | May 6, 2021 IN VIOLATION | $0 |
| Apr 14, 2020 | Construction CLASS - 1 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS: NOTED: UPON INSPECTION OBSERVED IN APARTMENT 1H, NEW GAS LINE IN THE KITCHEN AND PARTITIONS WALL BETWEEN THE BATHROOM AND LIVINGROOM HAS BEEN DEMO. ACTI #39021072P | Oct 6, 2022 DEFAULT | $12,500 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #04520 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #04411 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #09575 | DOB VIOLATION - ACTIVE |
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #01526 | DOB VIOLATION - ACTIVE |
| Jan 13, 1997 | LOCAL LAW 10/81 - ELEVATOR #01743 | DOB VIOLATION - ACTIVE |
| Jun 27, 1989 | ZONING #D3JM04 | VIOLATION UNSERVED ECB-ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 22, 2026 | B | Apt 5C · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD TILES IN THE ENTRANCE LOCATED AT APT 5C, 5th STORY, 3rd APARTMENT FROM NORTH AT EAST | Nov 26, 2026 |
| Sep 28, 2026 | A | Apt 1K · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE BATHROOM LOCATED AT APT 1K, 1st STORY, 3rd APARTMENT FROM SOUTH AT WEST | Jan 1, 2027 |
| Sep 21, 2026 | C | Apt 4J · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 4J, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' | Sep 19, 2026 |
| Sep 11, 2026 | B | Apt 5J · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 4th ROOM FROM EAST LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 16, 2026 |
| Sep 11, 2026 | B | Apt 4H · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE KITCHEN LOCATED AT APT 4H, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 16, 2026 |
| Sep 11, 2026 | B | Apt 4H · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL IN THE KITCHEN LOCATED AT APT 4H, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 16, 2026 |
| Sep 11, 2026 | C | Apt 4H · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4H, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 7, 2026 |
| Sep 11, 2026 | B | Apt 5J · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 16, 2026 |
| Sep 11, 2026 | B | Apt 4H · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT EAST WALL IN THE KITCHEN LOCATED AT APT 4H, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 16, 2026 |
| Sep 11, 2026 | A | Apt 5J · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASHBASIN IN THE BATHROOM LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Dec 15, 2026 |
| Sep 11, 2026 | B | Apt 5J · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 16, 2026 |
| Sep 11, 2026 | B | Apt 5J · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 16, 2026 |
| Sep 11, 2026 | B | Apt 5J · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 16, 2026 |
| Sep 11, 2026 | B | Apt 4H · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 4H, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 16, 2026 |
| Sep 11, 2026 | B | Apt 4H · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT NORTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 4H, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 16, 2026 |
| Sep 11, 2026 | B | Apt 4H · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 4H, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 16, 2026 |
| Sep 11, 2026 | B | Apt 5J · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 4th ROOM FROM EAST LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 16, 2026 |
| Sep 11, 2026 | B | Apt 4H · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 4H, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 16, 2026 |
| Sep 11, 2026 | B | Apt 5J · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 16, 2026 |
| Sep 11, 2026 | A | Apt 4H · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET AT EAST WALL IN THE KITCHEN LOCATED AT APT 4H, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Dec 15, 2026 |
| Sep 8, 2026 | B | Apt 5D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING, EAST AND SOUTH WALL IN THE BATHROOM LOCATED AT APT 5D, 5th STORY, 3rd APARTMENT FROM NORTH AT EAST | Oct 13, 2026 |
| Sep 8, 2026 | A | Apt 5D · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT EAST AND SOUTH WALL IN THE BATHROOM LOCATED AT APT 5D, 5th STORY, 3rd APARTMENT FROM NORTH AT EAST | Dec 12, 2026 |
| Sep 1, 2026 | B | Apt 3J · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING MISSING LOWER WINDOW SASH FIRST WINDOW FROM EAST AT NORTH IN THE 4th ROOM FROM EAST AT NORTH LOCATED AT APT 3J, 3rd STORY, 3rd APARTMENT FROM SOUTH AT WEST | Oct 6, 2026 |
| Sep 1, 2026 | B | § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED ELECTRICAL WIRES AT EAST WALL NEAR MAILBOXES AT PUBLIC HALL, 1st STORY | Oct 6, 2026 |
| Sep 1, 2026 | B | Apt 3J · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MISSING LOWER WINDOW SASH FIRST WINDOW FROM EAST AT SOUTH IN THE 1st ROOM FROM EAST LOCATED AT APT 3J, 3rd STORY, 3rd APARTMENT FROM SOUTH AT WEST | Oct 6, 2026 |
| Aug 21, 2026 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AND ASSEMBLY AT FIRE DOOR AT PUBLIC HALL, 4th STORY | Sep 25, 2026 |
| Jul 28, 2026 | B | Apt 4H · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT EAST WALL IN THE KITCHEN LOCATED AT APT 4H, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 1, 2026 |
| Jul 28, 2026 | A | Apt 4H · § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED WIRING AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 4H, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 31, 2026 |
| Jul 28, 2026 | B | Apt 4H · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL IN THE KITCHEN LOCATED AT APT 4H, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 1, 2026 |
| Jul 28, 2026 | A | Apt 4H · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10SQ FEET AT EAST WALL IN THE KITCHEN LOCATED AT APT 4H, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 31, 2026 |
| Jul 28, 2026 | B | Apt 4H · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR EAST WALL IN THE KITCHEN LOCATED AT APT 4H, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 1, 2026 |
| Jul 28, 2026 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT CELLAR AT BOILER ROOM | Aug 3, 2026 |
| Jul 28, 2026 | C | Apt 4H · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 4H, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Jul 28, 2026 |
| Jul 28, 2026 | C | Apt 4H · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4H, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 23, 2026 |
| Jun 29, 2026 | C | Apt 4H · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4H, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Jul 25, 2026 |
| Jun 29, 2026 | B | Apt 4H · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ELECTRICAL OUTLET AT EAST WALL IN THE KITCHEN LOCATED AT APT 4H, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 3, 2026 |
| Jun 29, 2026 | B | Apt 4H · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE ELICTRICAL SWITCH AT NORTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 4H, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 3, 2026 |
| Jun 29, 2026 | B | Apt 4H · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE ELECTRICAL SWITCH AT SOUTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 4H, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 3, 2026 |
| Jun 29, 2026 | B | Apt 4H · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE AT EAST WALL IN THE KITCHEN LOCATED AT APT 4H, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 3, 2026 |
| Jun 17, 2026 | A | Apt 2E · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM LOCATED AT APT 2E, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH | Sep 20, 2026 |
| Jun 17, 2026 | C | Apt 2E · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... MORE THAN 3O SQUARE FEET AT THE EAST WALL, SOUTH WALL AND THE CEILING IN THE BATHROOM LOCATED AT APT 2E, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH | Jul 13, 2026 |
| Jun 17, 2026 | B | Apt 2E · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT THE BATH TUB IN THE BATHROOM LOCATED AT APT 2E, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH | Jul 22, 2026 |
| Jun 17, 2026 | C | Apt 2E · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2E, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH | Jul 13, 2026 |
| Jun 17, 2026 | C | Apt 2E · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2E, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH | Jul 13, 2026 |
| Jun 17, 2026 | B | Apt 2E · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCES AT LOWER SASH OF WINDOW IN THE BATHROOM LOCATED AT APT 2E, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH | Jul 22, 2026 |
| Jun 17, 2026 | A | Apt 2E · § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE THE MOLD ON THE GROUT AND CERAMIC TILES AT THE NORTH WALL, EAST WALL AND THE WEST WALL IN THE BATHROOM LOCATED AT APT 2E, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH | Sep 20, 2026 |
| Jun 15, 2026 | B | Apt 4H · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL WALL OUTLET AT EAST WALL IN THE KITCHEN LOCATED AT APT 4H, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Jul 20, 2026 |
| Jun 15, 2026 | B | Apt 4H · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL LIGHT SWITCH AT SOUTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 4H, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Jul 20, 2026 |
| Jun 15, 2026 | B | Apt 4H · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL IN THE KITCHEN LOCATED AT APT 4H, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Jul 20, 2026 |
| Jun 15, 2026 | B | Apt 4H · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL LIGHT FIXTURE AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 4H, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Jul 20, 2026 |
| Jun 15, 2026 | B | Apt 4H · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT EAST WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 4H, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Jul 20, 2026 |
| Jun 9, 2026 | B | Apt 4H · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT WEST WALL UNDERNEATH KITCHEN CABINET IN THE KITCHEN LOCATED AT APT 4H, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Jul 14, 2026 |
| Jun 9, 2026 | B | Apt 4H · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT WEST WALL IN THE KITCHEN LOCATED AT APT 4H, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Jul 14, 2026 |
| Jun 9, 2026 | A | Apt 4H · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT SWITCH AT EAST WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 4H, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Sep 12, 2026 |
| Jun 9, 2026 | C | Apt 4H · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 4H, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 23, 2026 |
| Jan 8, 2026 | C | Apt 1C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Feb 3, 2026 |
| Jan 8, 2026 | C | Apt 1C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Feb 3, 2026 |
| Nov 18, 2025 | B | Apt 5J · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING, EAST AND SOUTH WALLS IN THE BATHROOM LOCATED AT APT 5J, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST | Dec 23, 2025 |
| Nov 18, 2025 | B | Apt 5J · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 5J, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST | Dec 23, 2025 |
| Nov 18, 2025 | B | Apt 5J · § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES AT SINK IN THE KITCHEN LOCATED AT APT 5J, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST | Dec 23, 2025 |
Showing 60 of 95. Full list on the agency site.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 22, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD TILES IN THE ENTRANCE LOCATED AT APT 5C, 5th STORY, 3rd APARTMENT FROM NORTH AT EAST | Open |
| Sep 28, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE BATHROOM LOCATED AT APT 1K, 1st STORY, 3rd APARTMENT FROM SOUTH AT WEST | Open |
| Sep 21, 2026 | HPD C | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 4J, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' | Open |
| Sep 11, 2026 | HPD B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 4th ROOM FROM EAST LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Sep 11, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE KITCHEN LOCATED AT APT 4H, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Sep 11, 2026 | HPD B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL IN THE KITCHEN LOCATED AT APT 4H, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Sep 11, 2026 | HPD C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4H, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Sep 11, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Sep 11, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT EAST WALL IN THE KITCHEN LOCATED AT APT 4H, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Sep 11, 2026 | HPD A | § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASHBASIN IN THE BATHROOM LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Sep 11, 2026 | HPD B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Sep 11, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Sep 11, 2026 | HPD B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Sep 11, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 4H, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Sep 11, 2026 | HPD B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT NORTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 4H, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Sep 11, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 4H, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Sep 11, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 4th ROOM FROM EAST LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Sep 11, 2026 | HPD B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 4H, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Sep 11, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Sep 11, 2026 | HPD A | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET AT EAST WALL IN THE KITCHEN LOCATED AT APT 4H, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Sep 8, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING, EAST AND SOUTH WALL IN THE BATHROOM LOCATED AT APT 5D, 5th STORY, 3rd APARTMENT FROM NORTH AT EAST | Open |
| Sep 8, 2026 | HPD A | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT EAST AND SOUTH WALL IN THE BATHROOM LOCATED AT APT 5D, 5th STORY, 3rd APARTMENT FROM NORTH AT EAST | Open |
| Sep 1, 2026 | HPD B | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING MISSING LOWER WINDOW SASH FIRST WINDOW FROM EAST AT NORTH IN THE 4th ROOM FROM EAST AT NORTH LOCATED AT APT 3J, 3rd STORY, 3rd APARTMENT FROM SOUTH AT WEST | Open |
| Sep 1, 2026 | HPD B | § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED ELECTRICAL WIRES AT EAST WALL NEAR MAILBOXES AT PUBLIC HALL, 1st STORY | Open |
| Sep 1, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MISSING LOWER WINDOW SASH FIRST WINDOW FROM EAST AT SOUTH IN THE 1st ROOM FROM EAST LOCATED AT APT 3J, 3rd STORY, 3rd APARTMENT FROM SOUTH AT WEST | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 27, 2026, 6:34 AM ET. BBL 1020690001.