Manhattan · Block 343 · Lot 60 · 10002

67 Pitt Street

5 floors · 20 apartments · 9,570 sq ft · built 1920 · class C4 · owner of record: 67 Pitt Realty, Llc

23open violations
$39,862ECB/OATH penalties owed
10HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2026-09-01
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 67 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 67 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 83 days
Annual
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 798 days
Next cycle year 2028

Open violations

ECB / OATH (18) · $39,862 owed
IssuedViolationHearingBalance
Jan 11, 2022Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35454641Y ISSUED ON 10/21/19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.FAILURE TO MAINTAIN BUIL
#35567789L
Apr 14, 2022
DEFAULT
$5,000
Oct 27, 2021Construction CLASS - 2
FAILURE TO COMPLY W/COMMISSIONER'S ORDER CONTAINED IN SUMMONS/V35454641Y ISSUED10/21/19&TO FILE C/C PURSUANT TO28-201.1&1RCNY102-01.NO C/C ON FILE COMPLY W/COMMISSIONER'S ORDER &/OR FILE C/C.
#35562505H
Jan 27, 2022
DEFAULT
$5,000
May 8, 2021Construction CLASS - 2
FAILURE TO COMPLY W/COMMISSIONER'S ORDER CONTAINED IN SUMMONS/V35454641Y ISSUED10/21/19&TO FILE C/C PURSUANT TO28-201.1&1RCNY102-01.NO C/C ON FILE.COMPLY W/COMMISSIONER'S ORDER &/OR FILE C/C.
#35530785P
Jul 22, 2021
DEFAULT
$3,125
Dec 10, 2020Construction CLASS - 2
FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35454641Y ISSUED ON 12/21/19 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01. FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER(O
#35524469M
Feb 25, 2021
DEFAULT
$3,125
Oct 9, 2020Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION#35454641Y ISSUED ON 10-21-2019 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01 FAILURE TO MAINTAIN BUI
#35521494K
Dec 24, 2020
DEFAULT
$3,125
Mar 20, 2020Construction CLASS - 2
FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35454641Y ISSUED ON 10/21/19 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01. FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER;
#35517724P
Feb 4, 2021
IN VIOLATION
$1,250
Jan 25, 2020Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION #35454641Y ISSUED ON 10-21-2019 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.NO C/OF/C ON FILE COMP
#35516653M
Jan 7, 2021
IN VIOLATION
$1,562
Dec 7, 2019Construction CLASS - 2
FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35454640M ISSUED ON 10/21/19 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01.FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER.RE
#35513589N
Feb 18, 2021
IN VIOLATION
$625
Dec 7, 2019Construction CLASS - 2
FAILURE TO COMPLY W/COMM'S ORDER CONTAINED IN SUMMONS/VIO#35454641Y ISSUED ON 10/21/19 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 &1RCNY 102-01.FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER.NO FIRE
#35513590K
Feb 18, 2021
IN VIOLATION
$1,250
Oct 21, 2019Construction CLASS - 2
WORK W/O PERMIT. AT TIME OF INSPECTION NOTED AT CELLAR ERECTED FULL HEIGHT PARTITIONS CREATING WORK SHOP/STORAGE AREA W/2 DOORS W/LOCKING DEVICES & ELECTRICAL OUTLETS/LIGHTING. REMEDY: OBTAIN ALL REQUIRED CONST
#35454642X
Sep 17, 2020
IN VIOLATION
$800
Oct 21, 2019Construction CLASS - 1
FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT. NO FIRE STOPPING AS PER BC712.3;27-345. AT TIME OF INSPECTION NOTED AT CELLAR. NO ADEQUATE FIRE STOPPING AT ALL PIPE PENTRATION W/EXPOSED WOOD JOIST & NO FIRE SEPERAT
#35454641Y
Sep 17, 2020
IN VIOLATION
$2,500
Oct 21, 2019Construction CLASS - 1
FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. AT TIME OF INSPECTION NOTED: AT CELLAR REAR EMERGENCY EXIT DOOR IS NOT OPERATING MASONRY PASSAGEWAY HAS DISLODGED STONE & BRICK W/BRICK WALL BULGING OUT. CELLA
#35454640M
Sep 17, 2020
IN VIOLATION
$1,250
Aug 14, 2019Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPING PER BC 712.3; 27-345. NOTED, AT THE TIME OF INSPECTION OBSERVED MANY AREAS IN THE CELLAR LEVEL NO FIRE PROTECTION BOARD ON THE CEILING ALS
#39007935K
Jul 9, 2020
IN VIOLATION
$1,250
Aug 14, 2019Construction CLASS - 2
WORK WITHOUT A PERMIT. NOTED, AT THE TIME OF INSPECTION OBSERVED IN THE CELLAR LEVEL FULL HEIGHT PARTITION WALLS ERECTED CREATING ROOMS AND NEW CEILING WORK AND SHORING WITH METAL PIPES 3IN. WORK DONE 100%. ,
#39007933R
Jul 9, 2020
IN VIOLATION
$1,250
Aug 10, 2018Construction CLASS - 1
FAILURE TO PROVIDE FIRE ALARM SYSTEM FOR TRANSIENT USE. REM: DISCONTINUE ILLEGAL OCCUPANCY.
#35348105L
Dec 6, 2018
IN VIOLATION
$2,500
Aug 10, 2018Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. FAILURE TO PROVIDE NUMBER OF REQUIRED MEANS OF EGRESS FOR EVERY FLOOR PER BC1021.1; BC1018.1 AND 27-366 FOR TRANSIENT USE. REM: DISCONTINUE ILLEGAL OCCUPAN
#35348104J
Dec 6, 2018
IN VIOLATION
$2,500
Aug 10, 2018Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. LACK OF A SYSTEM OF AUTOMATIC SPRINKLERS WHERE IS REQUIRED AS PER BC 903.2 AND 27-954 FOR TRANSIENT USE. REM: DISCONTINUE ILLEGAL OCCUPANCY.
#35348106N
Dec 6, 2018
IN VIOLATION
$1,250
Aug 10, 2018Quality of Life CLASS - 2
PERMANENT DWELLING USED/CONVERTED FOR OTHER THAN PERMANENT-RESIDENTIAL PURPOSES. CERTIFICATE OF OCCUPANCY #85715 INDICATES BUILDING TO BE LEGALLY APPROVED AS AN "A" CLASS M/D. NOW APT #2B USED/CONVERTED TO TRAN
#35348103H
Dec 6, 2018
IN VIOLATION
$2,500
DOB (1)
IssuedViolationStatus
Jan 22, 2020FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00023
DOB VIOLATION - ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Jan 22, 2020AEUHAZ FTC-AEU-HAZ
Active
HPD (17) · C 10 · B 1 · A 6
IssuedClassViolationCorrect by
Mar 3, 2025CApt A · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT A, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTHMar 17, 2025
Mar 3, 2025CApt A · § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT A, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTHMar 3, 2025
Mar 3, 2025C§ 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM BOILER ROOM DOOR LOCKED. AT BASEMENTMar 9, 2025
Aug 3, 2023CApt B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT B, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTAug 29, 2023
Aug 3, 2023CApt GFS · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT GFS, 1st STORY, 1st APARTMENT FROM EAST AT SOUTHAug 29, 2023
Aug 3, 2023A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WEST WALL AT PUBLIC HALL STAIRS, 5th STORYNov 6, 2023
Aug 3, 2023A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WEST WALL AT PUBLIC HALL STAIRS, 4th STORYNov 6, 2023
Aug 3, 2023CApt GFN · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT GFN, 1st STORY, 1st APARTMENT FROM WEST AT NORTHAug 29, 2023
May 30, 2023AApt 4D · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION DROP CEILING IN THE BATHROOM LOCATED AT APT 4D, 5th STORY, 1st APARTMENT FROM SOUTH AT WESTSep 2, 2023
May 30, 2023BApt 4D · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN ENAMEL GLAZE OF THE BATHTUB IN THE BATHROOM LOCATED AT APT 4D, 5th STORY, 1st APARTMENT FROM SOUTH AT WESTJul 4, 2023
Apr 25, 2023CApt 6FS · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6FS, 1st STORY, 1st APARTMENT FROM EAST AT SOUTHMay 21, 2023
Apr 25, 2023CApt 6FS · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 6FS, 1st STORY, 1st APARTMENT FROM EAST AT SOUTHMay 21, 2023
Mar 27, 2023CApt B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT B, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTApr 22, 2023
Mar 27, 2023CApt B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT B, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTApr 22, 2023
Oct 19, 2022AApt 4D · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION SUSPENDED CEILING IN THE BATHROOM LOCATED AT APT 4D, 5th STORY, 1st APARTMENT FROM SOUTH AT WESTJan 22, 2023
Dec 30, 2021AApt 1B · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION SUSPENDED CEILING IN THE BATHROOM LOCATED AT APT 1B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTHApr 4, 2022
Oct 13, 2021AApt 1B · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION DROP CEILING CONSISTING OF ACCOUSTIC MATERIAL IN THE BATHROOM LOCATED AT APT 1B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTHJan 16, 2022

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 25, 2026, 9:47 AM ET. BBL 1003430060.

Look up another building