| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 56 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 56 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 72 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 382,500 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 177 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 177 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 787 days | Next cycle year 2028 |
| Energy audit and retro-commissioning (2030) Likely applies Local Law 87 · Calendar year 2030 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 260). Agency page | Dec 31, 2030 in 1517 days | Next due 2030 |
| Annual boiler inspection (4 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-09-16 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 7, 2023 | Construction CLASS - 1 FAILURE TO MAINTAIN SAFETY MEASURS. 4 WORKERS PERFORMING BULKHEAD ROOF DEMOLITION.ONE WORKER BY LEADING EDGE WITH NO FALL ARREST SYSTEM, ON THE OTHER BULKHEAD, TWO WORKERS ATTACHED FALL ARREST SYSTEM TO SAME LI #39518864R | Jun 27, 2025 IN VIOLATION | $2,500 |
| Feb 21, 2018 | Construction CLASS - 2 FAILURE TO MAINTAIN EXTERIOR BLDG WALLS & APPURTENANCES. @ TIME OF INSP OBSERVED ON EXP#1 WEST ELEVATION CRACKS, SPALLS IN BRICK & DAMAGED MORTAR JOINT @ PARAPET WALL, CORRODING LINTES, EXP#3 EAST ELEVATION: OP #35265387P | May 3, 2018 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 21, 2023 | HAZARDOUS CONDITION (FACADE) NYCHA CYCLE 9B UNSAFE REPORT FILED #911324 | DOB VIOLATION - ACTIVE |
| Nov 21, 2023 | HAZARDOUS CONDITION (FACADE) NYCHA CYCLE 9B UNSAFE REPORT FILED #911325 | DOB VIOLATION - ACTIVE |
| Nov 17, 2023 | HAZARDOUS CONDITION (FACADE) NYCHA CYCLE 9B UNSAFE REPORT FILED #911320 | DOB VIOLATION - ACTIVE |
| Oct 18, 2023 | HAZARDOUS CONDITION (FACADE) NYCHA CYCLE 9B UNSAFE REPORT FILED #911310 | DOB VIOLATION - ACTIVE |
| Feb 22, 2023 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 #01932 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 21, 2023 | Facades FISPHAZ CYCLE 9B UNSAFE REPORT FILED | Active |
| Nov 21, 2023 | Facades FISPHAZ CYCLE 9B UNSAFE REPORT FILED | Active |
| Nov 17, 2023 | Facades FISPHAZ CYCLE 9B UNSAFE REPORT FILED | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 18, 2023 | Facades FISPHAZ CYCLE 9B UNSAFE REPORT FILED | Active |
| Feb 22, 2023 | Facades FISPNRF CYCLE 9B NO REPORT FILED | Active |
| Feb 22, 2023 | Facades FISPNRF CYCLE 9B NO REPORT FILED | Active |
| Feb 22, 2023 | Facades FISPNRF CYCLE 9B NO REPORT FILED | Active |
| Feb 22, 2023 | Facades FISPNRF CYCLE 9B NO REPORT FILED | Active |
| Feb 22, 2023 | Facades FISPNRF CYCLE 9B NO REPORT FILED | Active |
| Feb 22, 2023 | Facades FISPNRF CYCLE 9B NO REPORT FILED | Active |
| Feb 22, 2023 | Facades FISPNRF CYCLE 9B NO REPORT FILED | Active |
None open.