Staten Island · Block 7550 · Lot 58 · 10309

6675 Amboy Road

2 floors · 1 apartments · 4,759 sq ft · built 1910 · class K4 · owner of record: Tribam Holdings, Llc

4open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
780dto Gas piping inspection (2028 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 49 days
Keep the report on file (not filed with DOB)
Annual property registration Check
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 293 days
Required only if the owner doesn't live there
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 780 days
Next cycle year 2028

Open violations

ECB / OATH (0)

None open.

DOB (2)
IssuedViolationStatus
Apr 3, 2026CONSTRUCTION
STRUCTURE RENDERED NONCOMPLIANT DUE TO FIRE, 2 STORY WOOD STRUCTURE SU STAINED FIRE WATER AND SMOKE DAMAGE WILL ALL WINDOWS AND DOORS MISSING REMEDY: STRUCTURE MUST BE MAINTAINED IN A CODE COMPLIANT MANNER
#CER01JM
DOB VIOLATION - ACTIVE
Apr 3, 2026CONSTRUCTION
FAILURE TO MAINTAIN.AT TIME OF INSPECTN,OBSRVD BLDG DMGD BY FIRE W/ CHARRD WOOD JOISTS&WALLS,PRTLLY CLLPSD 2NDFL IN DNGR OF FURTHR PARTIAL COLLAPSE BLDG IS FENCED OFF W/PENDING FULL DEMO APPPLICATION.FULLY DEMOLISH BUILDING UNDER PERMIT.OBTAIN PERMITS BY 4/17/26.SIGN OFF JOB BY 5/29/26
#FEU50301AK
DOB VIOLATION - ACTIVE
DOB NOW Safety (2)
IssuedViolationStatus
Jan 8, 2026Gas Piping - LL152 FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 3)
Active
Jan 8, 2026Gas Piping - LL152 FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 3)
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 12, 2026, 3:40 AM ET. BBL 5075500058.

Look up another building