28 floors · 168,537 sq ft · built 2024 · class O4 · owner of record: Rolex Realty Company Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 65 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 168,537 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 186 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 186 days | Annual filing |
| Facade inspection report (Cycle 10B) Applies Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. Agency page | Feb 21, 2028 in 482 days | No Cycle 10 report on record yet |
| Energy audit and retro-commissioning (2028) Likely applies Local Law 87 · Calendar year 2028 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1288). Agency page | Dec 31, 2028 in 796 days | Next due 2028 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1161 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 16, 2026 | Construction CLASS - 1 RESPONDING TO AN INCIDENT WHERE A WORKER FELL FROM A 10FT PLATFORM LADDER WHILE PULLING LOW VOLTAGE RISER CABLES ON THE 28 FLOOR. INSPECTIONREVEALED THAT THE WORKER WAS NOT USING A (PFAS) AND THE LADDER WAS PLA #39556693Z | Apr 22, 2027 | $10,000 |
| Jun 17, 2026 | Unknown CLASS - 1 BC 3307.6.4.9 AT TIME OF INSPECTION OF A 28 STORIES NEW BUILDING I OBSERVED SIDEWALK SHED AND CONSTRUCTION FENCE INSTALLED BETWEEN EXPOSURE # 1 AND 4, BLOCKING PEDESTRIAN VISIBILITY AND OBSTRUCTING PEDESTRIAN C #39555644H | Mar 5, 2027 | $5,000 |
| Feb 9, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS.AT TIME OF INSPECTION,CONTRACTOR HAS FAILED TO FILE A CERTIFICATE OF CORRECTION#39547751N.REM #39550114H | Mar 15, 2027 DEFAULT | $1,280 |
| Nov 5, 2025 | Construction CLASS - 2 IN RESPONSE TO AN INCIDENT WHERE A WORKER FELL OFF MANLIFT EQUIPMENT 5 FEET IN HEIGHT IN AN ATTEMPT TO GAIN ACCESS INTO THE BASKET CROSSING FROM ANOTHER MANLIFT BASKET LANDED ON THE GROUND INJURED HIS MOUTH AN #39546669J | Feb 4, 2027 | $5,000 |
| Oct 31, 2025 | Construction CLASS - 2 NEW 29 STORY BUILDING SSM PRESENT UPON INSPECTION NOTED AT 29 FLOOR LEVEL WORKERS ON DUTY TAKEN OFF SOME MATERIALS OR EQUIPMENT WITH MOTOR LIFT CLEARSKY 198-050 WITHOUT CAZ ,GUARDRAILS, CAUTION TAPE OR FLAG PE #39546573P | Mar 11, 2027 | $5,000 |
| Jun 7, 2025 | Construction CLASS - 2 AT TIME OF INSPECTION OF A 29 STORIES NEW BUILDING I OBSERVED SIDEWALK SHED IN PLACE AT EXPOSURE # 1 AND 2 NOT MEETING THE HUNTER GREEN COLOR SPECIFICATION AS REQUIRED BY CODE THE SHED POST AND THE PARAPET WAS #39541187Y | Aug 14, 2025 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Feb 22, 2023 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 #01557 | DOB VIOLATION - ACTIVE |
| Sep 1, 2010 | ELEVATOR #9028/352570 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Aug 29, 2025 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Report | Active |
| Sep 11, 2024 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Report | Active |
| Sep 11, 2024 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Report | Active |
| Sep 11, 2024 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Report | Active |
| Sep 11, 2024 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Report | Active |
| Sep 11, 2024 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Report | Active |
| Sep 11, 2024 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Report | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Report | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Aug 19, 2026 | DOB Safety | AEUHAZ: | Closed |
| Jul 16, 2026 | ECB | Construction: RESPONDING TO AN INCIDENT WHERE A WORKER FELL FROM A 10FT PLATFORM LADDER WHILE PULLING LOW VOLTAGE RISER CABLES ON THE 28 FLOOR. INSPECTIONREVEALED THAT THE WORKER WAS NOT USING A (PFAS) AND THE LADDER WAS PLA | Closed |