26 floors · 312 apartments · 370,789 sq ft · built 2019 · class RM · owner of record: 662 Pacific Owner Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 63 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 63 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 63 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 79 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 370,789 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 184 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 184 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 307 days | Registered through 2027-09-01 |
| Facade inspection report (Cycle 10B) Applies Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. Agency page | Feb 21, 2028 in 480 days | No Cycle 10 report on record yet |
| Energy audit and retro-commissioning (2028) Likely applies Local Law 87 · Calendar year 2028 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1128). Agency page | Dec 31, 2028 in 794 days | Next due 2028 |
| Annual boiler inspection (4 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-08-14 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| May 3, 2021 | Construction CLASS - 2 COMPLIANCE WITH CONSTRUCTION DOCUMENTSWORK DOES NOT CONFORM TO APPROVED/AMENDED PLANS-CD5.NOTE:OBSERVED OUTRIGGINGB EQUIPTMENT AND SUSPENDEDSCAFFOLD IN RAISED POSITION STATIONARY AT PARAPET WELL OF 27 FLOOR.OBS #35553006Z | Sep 15, 2021 DEFAULT | $3,125 |
| May 3, 2021 | Construction CLASS - 2 BC33087-FAILURE TO PROVIDE GUARDRAIL SYSTEM.NOTE:OBSERED OUTRIGGER EQUIPMENT AND SUSPENDED SCAFFOLD EXP3(PACIFIC STREET) AND FOOT LOCATION.AT ROOF OBSERVED FOUR FOOT IN HEIGHT SCAFFOLD FRAMES WITH OUTRIGGER BEA #35553004P | Sep 15, 2021 DEFAULT | $3,125 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Oct 2, 2026 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Report | Active |
| May 2, 2024 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Dec 31, 2009 | Boiler LBLVIO | Active |
| Dec 31, 2009 | Boiler LBLVIO | Active |
| Dec 31, 2009 | Boiler LBLVIO | Active |
| Jan 1, 2009 | Boiler LL6291 | Active |
| Jan 1, 2009 | Boiler LL6291 | Active |
| Jan 1, 2009 | Boiler LL6291 | Active |
| Jan 3, 2008 | Boiler LL6291 | Active |
| Jan 3, 2008 | Boiler LL6291 | Active |
| Jan 19, 2007 | Boiler LL6291 | Active |
| Jan 19, 2007 | Boiler LL6291 | Active |
| Jan 6, 2006 | Boiler LL6291 | Active |
| Jan 6, 2006 | Boiler LL6291 | Active |
| Jan 6, 2006 | Boiler LL6291 | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Report | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 29, 2026, 4:28 AM ET. BBL 3011287505.