4 floors · 285,373 sq ft · built 1956 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 66 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 66 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 285,373 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 187 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 187 days | Annual filing |
| Energy audit and retro-commissioning (2028) Likely applies Local Law 87 · Calendar year 2028 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 5918). Agency page | Dec 31, 2028 in 797 days | Next due 2028 |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-07 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Mar 23, 2026 | Construction CLASS - 2 EXIT DOOR NOT SELF-CLOSING. NOTED: EMERGENCY EXTERIOR EXIT DOOR NOT SELF-CLOSING DUE TO BINDING AND/OR FAULTY HARDWARE ON EXTERIOR EXIT DOORAT EXIT 9 FROM GYM. REMEDY: REPAIR/REPLACE DOOR. #35727270P | Apr 10, 2026 POP/IN-VIO | $0 |
| Mar 23, 2026 | Construction CLASS - 2 REISSUE ON ECB #35717160P. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: FIRE RATED SMOKE AND CLASSROOM DOORS NOT SELF-CLOSING PROPERLY DUE TO MISSING HARDWARE OR FAULTY INCLUDING BINDING ON SMO #35727267Y | Apr 10, 2026 POP/IN-VIO | $0 |
| Mar 23, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: CRACKED VISION PANEL WIRE MESH GLASS ON SMOKE FIRE RATED DOORS AT STAIR A 4TH FLOOR AND STAIR B 3RD FLOOR ON FIRE RATED SMOKE DOOR. REMEDY: REPAIR A #35727271R | Apr 10, 2026 POP/IN-VIO | $0 |
| Mar 23, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: STORAGE IN SMALL ELECTRICAL SWITCH GEAR ROOM WITH JANITORIAL, COMBUSTIBLE, ANDMISC. ITEMS ON 4TH FLOOR, 3RD FLOOR, 2ND FLOOR AND 1ST FLOOR WHICH IS #35727269H | Apr 10, 2026 POP/IN-VIO | $0 |
| Mar 23, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXIT, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. NOTED: EMERGENCY ILLUMINATED DISCHARGE LIGHTS NOT OPERATING WHEN TESTED #35727268X | Apr 10, 2026 POP/IN-VIO | $0 |
| Apr 9, 2025 | Construction CLASS - 2 REISSUE#35677350M FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.FIREPROOF DOOR NOT CLOSING PROPERLY 307,300,326,317,319,330,321,223.REM:COMPLY WITH CODE. #35717160P | Aug 15, 2025 POP/IN-VIO | $0 |
| Apr 22, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: OBSERVEDINTERIOR FIRE PROOF SELF-CLOSING DOORS LOCATED ON 3 FLR.-ROOMS 307 F+R, 300, 326 F+R, 317 F+R, 319, 330 F+R, 321 F+R. AT 2 FLR.-ROOMS 223, 2 #35677350M | Jun 21, 2024 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #07543 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #07544 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #07545 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 26, 2026, 6:27 AM ET. BBL 2059180376.