3 floors · 135,600 sq ft · built 1953 · class W1 · owner of record: Nyc Department Of Parks And Recreation
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 47 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-08 (Accepted). Agency page | Dec 31, 2026 in 47 days | 1 of 3 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 135,600 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 168 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 168 days | Annual filing |
| Energy audit and retro-commissioning (2027) Likely applies Local Law 87 · Calendar year 2027 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 5917). Agency page | Dec 31, 2027 in 412 days | Next due 2027 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Mar 23, 2026 | Construction CLASS - 2 REISSUE ON ECB #35672756J. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: OBSERVED PLAYGROUND AREA MISSNG CHUNKS OF ASPHALT AVEMENT THROUGHOUT HUMEROUS LOCATIONS AT REAR OF PLAYGROUND INCLUDING C #35727265K | Apr 10, 2026 POP/IN-VIO | $0 |
| Mar 23, 2026 | Construction CLASS - 2 REISSUE ON ECB #35717158X. EXIT DOOR NOT SELF-CLOSING. NOTED: EMERGENCY EXTERIOR EXIT DOOR NOT SELF-CLOSING DUE TO HARDWARE BINGING OR HARDWARE DEFAULT OR FAULTY ON EXIT 5 STAIR CELLAR LEVEL, EXIT 7 CELLAR LEV #35727263R | Apr 10, 2026 POP/IN-VIO | $0 |
| Mar 23, 2026 | Construction CLASS - 2 REISSUE IN ECB #35717157Y. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: FIRE RATED SMOKE AND CLASSROOM DOORS NOT SELF-CLOSING DUE TO MISSING HARDWARE, BINDING OR FAULTY HARDWARE ON SMOKE DOORS #35727264Z | Apr 10, 2026 POP/IN-VIO | $0 |
| Mar 23, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. NOTED: EMERGENCY ILLUMINATED DISCHARGE BOXES NOT WORKING WHEN TESTED ON #35727266M | Apr 10, 2026 POP/IN-VIO | $0 |
| Apr 9, 2025 | Construction CLASS - 2 REISSUE#35677353H FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.1ST FLOOR STAIR C,STAIR D EXIT 10,CELLAR STAIR A FIRE DOORS NOT SELFCLOSING.REM:COMPLY WITH CODE. #35717157Y | Aug 15, 2025 POP/IN-VIO | $0 |
| Apr 9, 2025 | Construction CLASS - 2 REISSUE#35672755H EXIT DOORS NOT SELF CLOSING,EXIT H AT BASEMENT LEVELEXIT#5 NOT SELF CLOSING.REM:COMPLY WITH CODE. #35717158X | Aug 15, 2025 POP/IN-VIO | $0 |
| May 13, 2024 | Construction CLASS - 2 RE-ISSUE #35672754X-FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTE: OBSERVED AT 1FLR.-STAIR 'C', STAIR 'D', INTERIOR EXIT #10. AT BASEMENT STAIR 'A' FIRE DOORS ARE NOT SELF-CLOSING PROPERLY WHEN TE #35677353H | Sep 27, 2024 POP/IN-VIO | $0 |
| Mar 9, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED AT REAR PLAYGROUND AREA ASPHALT PAVEMENT THROUGH OUT MULTIPLE LOCATIONS WITH HOLES APPROX 2" IN WIDTH, CRACKS THROUGHOUT AND MISSING PATCHES OF AS #35672756J | Sep 1, 2023 POP/IN-VIO | $0 |
| Mar 9, 2023 | Construction CLASS - 2 EXIT DOORS NOT SELF CLOSING. OBSERVED AT GROUND FLOOR EXIT "H" LEFT EXIT DOOR AND AT BASEMENT LEVEL EXIT 5 DOOR NOT CLOSING PROPERLY/ RUBBING ON SADDLE. REMEDY: REPAIR/ REPLACE DOOR. #35672755H | Sep 1, 2023 POP/IN-VIO | $0 |
| Mar 9, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLAINT MANNER. OBSERVED FIRE PROOF SELF CLOSING DOORS NOT CLOSING PROPERLY AT 1ST FL STAIRCASE "C", STAIRCASE "D" EXIT 10 DOOR AT STAIRCASE.A BASEMENT LEVEL DOOR NOT CLOS #35672754X | Sep 1, 2023 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #07541 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #07540 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #07542 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #06807 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #26056 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #06176 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #08095 | DOB VIOLATION - ACTIVE |
| Sep 30, 2021 | CONSTRUCTION EMERGENCY WORK ORDER:DOE-EXP 2 WALL WAS BULGING OUT TOWARDS REAR YARD AT 2FL LEVEL APPROX 45FT LONG AT CLASSROOMS 101,103,201,203. INTERIOR VERT. CRACKS OBSERVED NEAR EXP3 WINDOWS OF THE (4)CLASSROOMS W/MOST SEVERE CRACKS APPROX 1 INCH WIDE AT 201. REMEDY: OWNER TO RETAIN LIC'C CONTRAT.TO IMMED EREC #FEU20802PN | DOB VIOLATION - ACTIVE |
| Sep 3, 2021 | CONSTRUCTION FAIL TO MAINTAIN-EXP3 WALL-BULGING TWRD REAR YRD@2FL LEVLAPPROX 45'L@ CLASS RMS 101,103,201,203.EXP3 FACADE BULGNG OUT &RMAINGWALL ALONG.2FL LEVL.CRKS@2FL LIBRY@EXP1,2&3 WLS W/SEP BTWN WLS&WINDOWS.OWNR RETAN NYSPE-EVAL ENTRE BLDG PREP&FILE RPR DWGS.BLDG RPR UNDR PRMT STRT- 12/27/2021/COMP&SIGN OFF B #FEU20803PN | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 5:33 AM ET. BBL 2059170140.