Brooklyn · Block 2620 · Lot 9 · 11222

659 Leonard Street

1 floors · 425 sq ft · built 1931 · class G1 · owner of record: 659 Loenard Llc

3open violations
$2,500ECB/OATH penalties owed
0HPD class C (immediately hazardous)
797dto Gas piping inspection (2028 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 66 days
Keep the report on file (not filed with DOB)
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 797 days
Next cycle year 2028

Open violations

ECB / OATH (1) · $2,500 owed
IssuedViolationHearingBalance
Oct 9, 2026Construction CLASS - 1
ATOI,OBSERVED FROM THE EXTERIOR AT EXPOSURE #1 THAT THE GARAGE DOOR HAD BEEN REMOVED AND REPLACED WITH AN ENTRY DOOR WITHOUT THE REQUIRED PERMIT., OBTAIN PERMIT
#39207472J
Dec 16, 2026
PENDING
$2,500
DOB (0)

None open.

DOB NOW Safety (2)
IssuedViolationStatus
Sep 23, 2026Parking Structures FTF-PS-INITL
Failure to file parking structures compliance report by 12/31/2025 as required per 1 RCNY 103-13
Active
Jan 8, 2026Gas Piping - LL152 FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 1)
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Oct 9, 2026ECBConstruction: ATOI,OBSERVED FROM THE EXTERIOR AT EXPOSURE #1 THAT THE GARAGE DOOR HAD BEEN REMOVED AND REPLACED WITH AN ENTRY DOOR WITHOUT THE REQUIRED PERMIT., OBTAIN PERMITOpen
Sep 23, 2026DOB SafetyParking Structures: Failure to file parking structures compliance report by 12/31/2025 as required per 1 RCNY 103-13Open

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 26, 2026, 10:53 AM ET. BBL 3026200009.

Look up another building