1 floors · 757,858 sq ft · built 1996 · class N2 · owner of record: Catholic Charities Of Staten Island, Inc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 50 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 757,858 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 171 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 171 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 781 days | Next cycle year 2028 |
| Energy audit and retro-commissioning (2034) Likely applies Local Law 87 · Calendar year 2034 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 7664). Agency page | Dec 31, 2034 in 2972 days | Next due 2034 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 16, 2026 | Construction CLASS - 2 REISSUE#35692462M FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED:THERE WERE SEVERAL,EMERGENCY LIGHTS THAT WERE NOT O #35727538R | May 28, 2026 POP/IN-VIO | $0 |
| Apr 16, 2026 | Construction CLASS - 2 REISSUE#35692461K FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:THERE ARE SEVERAL WINDOWS THROUGOUT THE SCHOOL THAT ARE NOT OPERATING CORRECTING AND SOME DO NOT OPERATE AT AN INJURY HAZARD AND LAC #35727539Z | May 28, 2026 POP/IN-VIO | $0 |
| Apr 8, 2025 | Construction CLASS - 2 RE-ISSUE #35672474L. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: THERE ARE SEVERAL WINDOWS THROUGHOUT THE SCHOOL THAT ARE NOT OPERATING. CREATE VENTILATION PROBLEM AND LACK OF AIR. REMEDY: REP #35692461K | May 6, 2025 POP/IN-VIO | $0 |
| Apr 8, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER; ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. NOTED AT T. O. I. THERE WERE SEVERAL EMERGENCY EXIT LIGHTS THROUGHOUT T #35692462M | May 6, 2025 POP/IN-VIO | $0 |
| Oct 17, 2024 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTE: INSPECTION FOR COMPLAINT #5186789, 5186788 DATED(10/15/24). AT TIME OF INSPECTION, I OBSERVED BUILDING #12 VERTIAL CRACKS, STEP CRACKS AT EXPO (3) NO #35686712P | Jan 15, 2025 POP/IN-VIO | $0 |
| Sep 27, 2024 | Boilers CLASS - 2 FAILURE TO FILE REQUIRED ANNUAL BOILER INSPECTION REPORTS FOR LOW-PRESSURE BOILER 5000007414N0001 IN ACCORDANCE WITH THE RULES OF THE DEPARTMENT.1RCNY 103-01(D)(1)REQUIRES THAT AN ANNUAL INSPECTION REPORT FOR L #37029527X | Jan 15, 2025 DEFAULT | $0 |
| Mar 13, 2024 | Construction CLASS - 2 REISSUE#35672590Z FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER.THERE ARE SEVERAL WINDOWS THROUGHOUT THE FACILITY THAT ARE NOT OPERATINGCORRECTLY.REM:REPAIR/REPLACE WINDOWS.MAKE OPERATION SAFE. #35672474L | May 3, 2024 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Oct 19, 2026 | CONSTRUCTION EMERGENCY WORK ORDER-THE BLDG SFFRD FIRE DMG ON/ARND 10/17/26EXPS1,3,& 4 HAVE VERT&STEP CRCKS ROOF IS OPEN W/ONLY METAL TRUSSES REMAINING CRANE INSIDE THE BLDG RUNNING PARALLEL TO EXP4 IS PARTIALLY COLLAPSED OWNR TO RTAIN NYSPE&DEMO ENDRSD GC TO IMMED 1.NYSPE TO SUBMT MEANS& METHODS FOR PARTL DEMO F #FEU50301BP | DOB VIOLATION - ACTIVE |
| Oct 18, 2026 | CONSTRUCTION STRUCTURE RENDERED NON COMPLIANT DUE TO FIRE. AT THE TIME OF INSPECTION OBSERVED EXTENSIVE FIRE,WATER AND SMOKE DAMAGE THROUGHOUT STRUCTURE. ALSO OBSERVED LARGE VERTICAL CRACKS IN THE FA ADE, ENTIRE ROOF MISSING AND OTHER STRUCTURAL MEMBERS IN DISREPAIR/COMPROMISED. #26-02417 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #20062 | DOB VIOLATION - ACTIVE |
| Dec 23, 2024 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00135 | DOB VIOLATION - ACTIVE |
| Oct 17, 2024 | CONSTRUCTION EMERGENCY WORK ORDER:TO SECURE UNSAFE FACADE. IMMEDIATELY TO PROVIDE SAFETY MEASRES (OVERHEAD PROT/CONTROL ACCESS ZONE) DUE TO SEVERELY SHIFTED PARAPET WALL @ EXP4&1,BRKN GLASS EXP2,SOUTH,WEST & NORTH,EAST ELEV. REMEDY: IMMEDIATELY PROVIDE SAFE MEASURES SUCH AS OVERHEAD PROT OR CONTROL ACCESS ZONE ( #LL50301YC | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #18649 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #18620 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #18619 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #18618 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #18600 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #38875 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #40267 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #20514 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #24931 | DOB VIOLATION - ACTIVE |
| Dec 21, 2022 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER, NO ACCESS TO THE INSIDE OF BUILDING HOWEVER AT THE TIME OF INSPECTION OBSERVED BROKEN SIDING AT ALL THE 4 SIDE OF THE BUILDING. BASEMENT IS COMPLETELY FLOODED. AT EXPOSURE 3 BACKYARD, THE ATTACHED WOODEN CANOPY IS FALLING A PART. THE ROOF GUTTER #22-04504 | DOB VIOLATION - ACTIVE |
| Nov 8, 2019 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT #15795 | DOB VIOLATION - ACTIVE |
| Apr 6, 2018 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT #18997 | DOB VIOLATION - ACTIVE |
| Apr 6, 2018 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT #18996 | DOB VIOLATION - ACTIVE |
| Jan 1, 2012 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #03104 | DOB VIOLATION - ACTIVE |
| Jun 28, 1993 | LOCAL LAW 10/81 - ELEVATOR 1 #04292 | DOB VIOLATION - ACTIVE |
| Apr 7, 1992 | LOCAL LAW 10/81 - ELEVATOR 1 #04611 | DOB VIOLATION - ACTIVE |
| Apr 25, 1991 | LOCAL LAW 10/81 - ELEVATOR 1 #03471 | DOB VIOLATION - ACTIVE |
| Jun 29, 1990 | LOCAL LAW 10/81 - ELEVATOR 1 #04920 | DOB VIOLATION - ACTIVE |
| Oct 12, 1989 | LOCAL LAW 10/81 - ELEVATOR 1 #06264 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Dec 23, 2024 | AEUHAZ FTC-AEU-HAZ | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Nov 8, 2019 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT | Active |
| Apr 6, 2018 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT | Active |
| Apr 6, 2018 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT | Active |
| Jan 1, 2012 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Mar 19, 2003 | Boiler LL6291 | Active |
| Jun 28, 1993 | Elevators LL1081 | Active |
| Apr 7, 1992 | Elevators LL1081 | Active |
| Apr 25, 1991 | Elevators LL1081 | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 19, 2026 | DOB | CONSTRUCTION: EMERGENCY WORK ORDER-THE BLDG SFFRD FIRE DMG ON/ARND 10/17/26EXPS1,3,& 4 HAVE VERT&STEP CRCKS ROOF IS OPEN W/ONLY METAL TRUSSES REMAINING CRANE INSIDE THE BLDG RUNNING PARALLEL TO EXP4 IS PARTIALLY COLLAPSED OWNR TO RTAIN NYSPE&DEMO ENDRSD GC TO IMMED 1.NYSPE TO SUBMT MEANS& METHODS FOR PARTL DEMO F | Open |
| Oct 18, 2026 | DOB | CONSTRUCTION: STRUCTURE RENDERED NON COMPLIANT DUE TO FIRE. AT THE TIME OF INSPECTION OBSERVED EXTENSIVE FIRE,WATER AND SMOKE DAMAGE THROUGHOUT STRUCTURE. ALSO OBSERVED LARGE VERTICAL CRACKS IN THE FA ADE, ENTIRE ROOF MISSING AND OTHER STRUCTURAL MEMBERS IN DISREPAIR/COMPROMISED. | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 11, 2026, 5:35 PM ET. BBL 5076640001.