2 floors · 33,000 sq ft · built 1868 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 67 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 67 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 33,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 188 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 188 days | Annual filing |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-08-31 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Mar 19, 2026 | Construction CLASS - 2 REISSUE:35692018X FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.EXP#1 LEFT SIDE HAS A BULGE.REM:COMPLY WITH CODE. #35722541P | May 21, 2026 POP/IN-VIO | $0 |
| Mar 19, 2026 | Construction CLASS - 2 REISSUE#35636275K EXIT DOOR NOT SELF-CLOSING AT CELLAR CUSTODIAN ROOM THE 2ND DOOR OLD DOOR NOT CLOSING PROPERLY.REM:COMPLY WITH CODE. #35722542R | May 21, 2026 POP/IN-VIO | $0 |
| Mar 19, 2026 | Construction CLASS - 2 REISSUE:35663264Z FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.AT EXP#1 AND EXP#4 LUNDERBUILT AVES IRON FENCE POST BASE DETERIORATED/MISSING SUPPORT.REM:COMPLY WITH CODE. #35727319R | May 21, 2026 POP/IN-VIO | $0 |
| Apr 22, 2025 | Construction CLASS - 2 RE-ISSUE #35678666N. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: OBSERVED AT EXPOSURE 1 ON THELEFT SIDE THE WALL IS BULGING, ALSO AT EXPO #35692018X | May 22, 2025 POP/IN-VIO | $0 |
| Mar 5, 2024 | Construction CLASS - 2 REISSUE#35663265K FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:AT TIME OF MY INSPECTION I OBSERVED AT EXPOSURE#1 ON STERLING PLACE THE LEFT SIDE OF THE BUILDING MAIN ENTRANCE UNDER THE SECOND FLO #35678666N | May 3, 2024 POP/IN-VIO | $0 |
| Jan 11, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:OBSERVED AT EXPOSURE#1(STERLING PL)LEFT OF BUILDING MAIN ENTRANCE UNDER SECOND FLOOR WINDOW BRICKS BUDGING AND MISSING MORTAR,BY ROOF GUTTER DOWN SPOU #35663265K | Mar 22, 2023 POP/IN-VIO | $0 |
| Jan 11, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:OBSERVED AT EXPOSURE#1(STERLING PL)AND EXPOSURE#4(UNDERBUILT AVE),IRON FENCE POST BASE DETERIORATED/MISSING COMPROMISING STRUCTURE SUPPORT.REM:REPAIR #35663264Z | Mar 22, 2023 POP/IN-VIO | $0 |
| Feb 2, 2022 | Construction CLASS - 2 RE-ISSUE#35548522Z EXIT DOOR NOT SELF CLOSING. NOTED: ON THE 1ST FL NEXT TO ROOMS#111 & 112 THE DOORS ARE NOT CLOSING PROPERLY,ALSO AT THE BASEMENT LEVEL THE EXIT DOOR FROM THE BOILER ROOM TO THE EXIT TO VANDER #35636275K | Jun 22, 2022 POP/IN-VIO | $0 |
| Mar 3, 2021 | Construction CLASS - 2 EXIT DOOR NOT SELF CLOSING PROPERLY. AT BASEMENT LEVEL EXIT DOOR FROM BOILER RM WAY TO VANDERBILT AVE ONE EXIT DOOR,AT 1ST FL EACH PLACE ONEEXIT DOOR NEAR ROOM NO 111 & 112 RM NO EXIT DOOR NOT SELF CLOSING PROP #35548522Z | Jul 28, 2021 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #09010 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #09011 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #09009 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 8) | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 25, 2026, 6:23 PM ET. BBL 3011640057.