Bronx · Block 5947 · Lot 1 · 10471

655 West 254 Street

2 floors · 115,904 sq ft · built 1974 · class W3 · owner of record: Sar Academy

8open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
57dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 57 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 57 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (4 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-07-20 (Accepted). Agency page

Dec 31, 2026
in 57 days
1 of 4 without an accepted 2026 report yet
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 115,904 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 178 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 178 days
Annual filing
Energy audit and retro-commissioning (2027) Likely applies
Local Law 87 · Calendar year 2027
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 5947). Agency page

Dec 31, 2027
in 422 days
Next due 2027

Open violations

ECB / OATH (0)

None open.

DOB (6)
IssuedViolationStatus
May 4, 1998LOCAL LAW 62/91 - BOILERS

#13374
DOB VIOLATION - ACTIVE
May 4, 1998LOCAL LAW 62/91 - BOILERS

#13381
DOB VIOLATION - ACTIVE
Sep 16, 1997LOCAL LAW 62/91 - BOILERS

#209883
DOB VIOLATION - ACTIVE
Feb 10, 1997LOCAL LAW 62/91 - BOILERS

#16273
DOB VIOLATION - ACTIVE
Aug 29, 1995LOCAL LAW 62/91 - BOILERS

#18505
DOB VIOLATION - ACTIVE
Apr 18, 1991CONSTRUCTION

#08LC01
VIOLATION UNSERVED ECB-ACTIVE
DOB NOW Safety (2)
IssuedViolationStatus
Oct 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle C (premises is in Community District 8)
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 4, 2026, 1:44 AM ET. BBL 2059470001.