1 floors · 2,598 sq ft · built 1931 · class K1 · owner of record: Bayridge Partners Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 67 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 798 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 4, 2026 | Construction CLASS - 2 OBSERVED SUPPORT OF EXCAVATION WORK CONTRARY TO PLANS-PILES NOT FILLED WITH GROUT AS PER PLAN,LAGGING BOARDS INSTALLED CONTINUOUS APPROX. 10/14 FEET LONG -AS PER PLAN LAGGING SHALL BE INSTALLED FROM PILE TO PIL #39557494K | Nov 25, 2026 PENDING | $1,250 |
| Aug 4, 2026 | Construction CLASS - 2 AT THE TIME OF MY INSPECTION OBSERVED FIRE HYDRANT ON STREET IN USE FOR CONSTRUCTION PURPOSES-DEP PERMIT FOR USE OF FIRE HYDRANT EXPIRED ON 7/14/26(NEW PERMIT NOT ISSUED),OBSERVED DIESEL GENERATOR ON SITE -UPON #39557495M | Oct 14, 2026 DEFAULT | $1,280 |
None open.
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Aug 4, 2026 | ECB | Construction: OBSERVED SUPPORT OF EXCAVATION WORK CONTRARY TO PLANS-PILES NOT FILLED WITH GROUT AS PER PLAN,LAGGING BOARDS INSTALLED CONTINUOUS APPROX. 10/14 FEET LONG -AS PER PLAN LAGGING SHALL BE INSTALLED FROM PILE TO PIL | Open |
| Aug 4, 2026 | ECB | Construction: AT THE TIME OF MY INSPECTION OBSERVED FIRE HYDRANT ON STREET IN USE FOR CONSTRUCTION PURPOSES-DEP PERMIT FOR USE OF FIRE HYDRANT EXPIRED ON 7/14/26(NEW PERMIT NOT ISSUED),OBSERVED DIESEL GENERATOR ON SITE -UPON | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 25, 2026, 9:44 PM ET. BBL 3058260050.