3 floors · 6 apartments · 5,250 sq ft · built 1905 · class C2 · owner of record: Howard Avenue Development L.P.
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 66 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 66 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 82 days | Annual |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 797 days | Next cycle year 2028 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-07-02 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 31, 2026 | Construction CLASS - 1 FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY. NOTED AT THE TIME OF INSPECTION I OBSERVED FLOWER POT IS STORED ON THE FIRE ESCAPE HORIZONTAL LANDINGS AT EXPOSURE 3(NORTH ELEVATION) 3RD FLOOR. THE STORAGE OF T #35730868R | Nov 4, 2026 PENDING | $2,500 |
| Aug 20, 2026 | Construction CLASS - 1 FAILURE TO OBEY VACATE ORDER FROM THE COMMISSIONER PER 28-207.4. FULL VACATE ORDER WAS ISSUED 07/02/2022 UNDER COMPLAINT #3861955 WITH FULL VACATE ORDER STILL IN EFFECT. AT TIME OF INSPECTION, OBSERVED (APT 2A #39201307Z | Oct 28, 2026 PENDING | $25,000 |
| Jul 8, 2026 | Construction CLASS - 1 FAILURE TO OBEY A VACATE ORDER FROM THE COMMISSIONER : FULL VACATE ORDER ISSUED ON 07-02-2022 UNDER COMPLAINT #3861955 FOR ENTIRE BUILDING, DUE TO DAMAGES SUSTAINED BY FIRE. AT TIME OF INSPECTION OBSERVED APT. #39195177L | Sep 16, 2026 DEFAULT | $10,030 |
| Dec 17, 2025 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR SUMMONS #39068841Z., FILE A CERTIFICATE OF CORRECTION #39170710J | Feb 11, 2027 DEFAULT | $1,280 |
| Dec 17, 2025 | Construction CLASS - 1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE ENGENEER'S REPORT FOR VIO22-02059. PREVIOUS VIOS # 37023353H AND37025878J ISSUED FOR SAME CONDITIONS., COMPLY WITH COMMISSIONER'S ORDER #39170709M | Feb 11, 2027 DEFAULT | $6,280 |
| Nov 10, 2025 | Construction CLASS - 1 FAILURE TO PROVIDE UNOBSRUCTED PASSAGEWAY. NOTE: AT THE TIME OF INSPECTION OBSERVED ITEM STORED AT FIRE ESCAPE LANDING AT EXPOSURE 3. REMEDY: REMOVE EGRESS OBSTRUCTION. #35718549H | Jan 14, 2026 ADMIT/IN-VIO | $0 |
| Oct 11, 2023 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER IN DOB VIOLATION VIO22-02059,DATED 7/1/2022.RESPONDENT WAS REQUIRED TO SUBMIT AN ENGINEER'S REPORT CONCERNING STRUCTURALLY DEFICIENT CONDITIONS.AS OF 10/11/2023,A #37025878J | Mar 13, 2024 DEFAULT | $12,500 |
| Nov 1, 2022 | Construction CLASS - 1 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER IN DOB VIOLATION VIO22-02059,DATED 7/01/22.RESPONDENT WAS REQUIRED TO SUBMIT ENGINEER'S REPORT CONCERNING STRUCTURALLY DEFICIENT CONDITIONS.AS OF 11/1/22 ENGINEER'S R #37023353H | Mar 8, 2023 IN VIOLATION | $2,500 |
| Aug 25, 2022 | Construction CLASS - 1 FAILURE TO OBEY A VACATE ORDER FROM THE COMMISSIONER PER 28-207.4. ACTIVE FULL VACATE ORDER ISSUED ON 07/02/2022 UNDER COMPLAINT # 3861955 FOR ENTIRE PREMISES DUE TO DAMAGES SUSTAINED BY FIRE. OBSERVED APT 3B A #39068841Z | Mar 17, 2023 IN VIOLATION | $4,800 |
| Issued | Violation | Status |
|---|---|---|
| Aug 31, 2026 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.NOTED AT THE T IME OF INSPECTION,I OBSERVED AT EXP1,DAMAGED ROOF CORNICE AND OPEN/EXP OSED MASONRY.AT EXP2,CRACK ON STONE AND MASONRY OBSERVED AT FIRST FL.A T EXP3,CRACK/STEP CRACK AND SPALLING STUCCO OBSERVED ON MULTIPLE LOCAT IONS.REMEDY:REPA #SR30301JR | DOB VIOLATION - ACTIVE |
| Nov 10, 2025 | CONSTRUCTION EMERGENCY WORK ORDER DUE TO BROKEN FIRE ESCAPE TREAD AT EXPOSURE #3 NORTH ELEVATION AT FIRST FLOOR. REMEDY: IMMEDIATELY REPAIR BROKEN FIRE ESCAPE TREAD UNDER DIRECTION OF A LICENSED PROFESSIONAL #SR0309NS | DOB VIOLATION - ACTIVE |
| Nov 10, 2025 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. NOTE: AT THE TIME OF INSPECTION AT EXPOSURE 1 DAMAGED ROOF CORNICE AND BROKEN WINDOW PANE AT 2FL. EXP 2 CRACK STONE AT FIRST FLOOR EXP3, CRACK STUCCO IN WINDOW LINE. REMEDY: REPAIR AND/OR REPLACE #SR0303NS | DOB VIOLATION - ACTIVE |
| Oct 4, 2023 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #01586 | DOB VIOLATION - ACTIVE |
| Oct 24, 2022 | STRUCTURALLY COMPROMISED BUILDING FAILURE TO SUBMIT AN ACCEPTABLE INSPECTN RPT FOR STRUCTURALLY COMPROMISED BLDG. #00011 | DOB VIOLATION - ACTIVE |
| Oct 21, 2022 | CONSTRUCTION FAILURE TO COMPLY W/COMMISSIONER'S ORDER#340936(082422FEU30301ZT)DATED 08/24/22,REQUIRING OWNER TO START REPAIRS UNDR PERMIT FOR THE FIRE DAMAGED ROOF & ROOF JOISTS.AS OF 10/21/22 THERE ARE NO JOBS FILES IN BIS/DOBNOW TO REPAIR THE BLDG.IMMED COMPLY W/COMMISSIONER'S ORDER# 340936(082422FEU30301ZT)TO #FEU30301ZT | DOB VIOLATION - ACTIVE |
| Aug 24, 2022 | CONSTRUCTION FTM-FEW OPNING ON ROOF DUE TO FIREFGTNG OPS.INTRIOR DRYWALL,CEILING &JOISTS ON 3FL COMPRMISD.FEW ROOF JOISTS &BRCKS NEAR EXP1 WERE CHARRED NEW SISTR JOISTS INSTALLD W/O RPR DWGS FILED IN BIS/DOBNOW OWNR IMMED RTAIN NYSPE-EVAL ENTRE BLDG &PRPARE/FILE RPR DWGS.BLDG RPRD UNDR PRMT STRTNG 9/12/22.CMPLTD #FEU30301ZT | DOB VIOLATION - ACTIVE |
| Jul 1, 2022 | CONSTRUCTION FACADE AT EXPOSURE 1 IN DISREPAIR CONDITION BRICKS DISPLACING AND FALLING, REST OF BRICKS IN THIS AREA IN DANGER TO FUTURE COLLAPSE. #22-02059 | DOB VIOLATION - ACTIVE |
| Jul 1, 2022 | CONSTRUCTION STRUCTURE RENDERED NON COMPLAINT. AT TIME OF INSPECTION DAMAGE OBSERVED TO HAVE BEEN SUSTAINED, ROOF PARTIALLY OPEN FOR ELEMENT, BEAMS AT FRONT SIDE CHARRED, EXCESSIVE WATER DAMAGE, WINDOW HAS BEEN REMOVED, CORNICE HAS BEEN REMOVED AND BRICKS FALLING TO ENTRYWAY AND PEDESTRIAN SIDEWALK DUE FIRE AND #22-02058 | DOB VIOLATION - ACTIVE |
| Jan 19, 2014 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING DUE TO CAR ACCIDENT #NE01LC | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 7, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Sep 30, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Sep 30, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 3) | Active |
| Oct 4, 2023 | AEUHAZ FTC-AEU-HAZ | Active |
| Oct 24, 2022 | Structurally Compromised Buildings FTF-SC-INITL | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Feb 2, 2026 | I | §27-2153 ADM CODE THE PREMISES HAS BEEN SELECTED TO PARTICIPATE IN THE ALTERNATIVE ENFORCEMENT PROGRAM WHICH MAY RESULT IN BUILDING-WIDE INSPECTIONS, FEES, AND EXTENSIVE REPAIR WORK TO CORRECT VIOLATIONS AND UNDERLYING CONDITIONS. CHARGES FOR REPAIR WORK DONE PURSUANT TO THIS ORDER, IF NOT PAID, WIL | — |
| May 1, 2026 | C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS PANE AT SKY LIGHT OVER PUBLIC HALL STAIRS AT ROOF | May 7, 2026 |
| Feb 23, 2026 | C | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PARAPETT WALL AT FRONT OF BUILDING AT PUBLIC HALL | Mar 1, 2026 |
| Feb 23, 2026 | C | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CORNICE AT BUILDING FRONT AT PUBLIC HALL | Mar 1, 2026 |
| Feb 5, 2026 | A | §27-2153 ADM CODE POST AND MAINTAIN A NOTICE, WRITTEN IN ENGLISH AND IN SPANISH, ON THE BUILDING ENTRANCE DOOR OR OTHER CONSPICUOUS LOCATION IN THE BUILDING COMMON AREA, STATING THAT: (1) THE BUILDING IS IN THE ALTERNATIVE ENFORCEMENT PROGRAM, (2) THAT OCCUPANTS MAY CALL 311 OR THE AEP AT 212-863-82 | May 11, 2026 |
| May 19, 2025 | A | § 53, 187, 231 M/D LAW AND DEPARTMENT RULES AND REGULATIONS. PROVIDE A SHOE PROPERLY SECURED TO BOTTOM OF STRING OF DROPLADDER AT BUILDING REAR AT NORTH AT FIRE ESCAPE, 1st STORY | Aug 22, 2025 |
| Sep 25, 2023 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD CORNICE AT BUILDING FRONT , 3rd STORY | Oct 30, 2023 |
| Jun 8, 2023 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDED PLASTER AT CEILING AT PUBLIC HALL, 3rd STORY | Jul 13, 2023 |
| Jun 8, 2023 | B | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF HOUSEHOLD ITEMS AT PUBLIC HALL, 2nd STORY | Jul 13, 2023 |
| Jun 8, 2023 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM | Jun 14, 2023 |
| Dec 1, 2022 | A | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE METAL CORNICE AT FRONT OF BUILDING, ROOF | Mar 6, 2023 |
| Dec 1, 2022 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING, NORTH AND SOUTH WALLS AT SCUTTLE HATCH AT PUBLIC HALL, 3rd STORY | Mar 6, 2023 |
| Dec 1, 2022 | A | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT CEILING, NORTH AND SOUTH WALLS AT SCUTTLE HATCH AT PUBLIC HALL, 3rd STORY | Mar 6, 2023 |
| Dec 1, 2022 | B | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF HOUSEHOLD ITEMS AT PUBLIC HALL, 3rd STORY | Jan 5, 2023 |
| Nov 28, 2022 | B | Apt 2A · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX. 3 SQ. FT. AT RECESS WALL AROUND 2ND WINDOW FROM WEST AT NORTH IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH ORIGINAL VIOLATION 15282094 ISSUED 28-JUL-22 HA | Jan 2, 2023 |
| Nov 25, 2022 | C | Apt 3A · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Dec 21, 2022 |
| Nov 25, 2022 | A | Apt 3A · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE BELL BUZZER INTERCOMMUNICATION SYSTEM FROM THE BUILING ENTRANCE TO THE PANEL ON THE SOUTH WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Feb 28, 2023 |
| Nov 25, 2022 | C | Apt 3A · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Dec 21, 2022 |
| Nov 25, 2022 | B | Apt 3A · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE LAMINATE COUNTER TOP OF THE BASE CABINET AT THE SINK IN THE KITCHEN LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Dec 30, 2022 |
| Nov 25, 2022 | B | Apt 3A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE SOUTH WALL IN THE FOYER LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Dec 30, 2022 |
| Nov 25, 2022 | B | Apt 3A · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE DOOR (SEVERLY DAMAGED BY FIRE DEPT.) IN THE ENTRANCE LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Dec 30, 2022 |
| Oct 17, 2022 | B | Apt 3B · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 21, 2022 |
| Oct 17, 2022 | B | Apt 3B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 21, 2022 |
| Oct 17, 2022 | B | Apt 3B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 21, 2022 |
| Oct 17, 2022 | B | Apt 3B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 21, 2022 |
| Oct 17, 2022 | A | Apt 3B · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jan 20, 2023 |
| Oct 17, 2022 | A | Apt 3B · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jan 20, 2023 |
| Oct 17, 2022 | B | Apt 3B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WINDOW RECESS 1ST FROM EAST AT SOUTH WALL. IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 21, 2022 |
| Oct 17, 2022 | B | Apt 3B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WINDOW RECESS 2ND FROM EAST AT SOUTH WALL IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 21, 2022 |
| Oct 17, 2022 | B | Apt 3B · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 21, 2022 |
| Oct 17, 2022 | B | Apt 3B · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 21, 2022 |
| Oct 17, 2022 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT PUBLIC HALL, 3rd STORY | Nov 21, 2022 |
| Oct 17, 2022 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT PUBLIC HALL, 3rd STORY | Jan 20, 2023 |
| Jul 29, 2022 | C | Apt 2A · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 24, 2022 |
| Jul 29, 2022 | C | Apt 2A · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 24, 2022 |
| Jul 29, 2022 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT 1ST STORY PUBLIC HALL LEADING TO BASEMENT AT BOILER ROOM | Aug 4, 2022 |
| Jul 29, 2022 | B | Apt 2A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT RECESS WALL AROUND 2ND WINDOW FROM WEST AT NORTH IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 2, 2022 |
| Jul 29, 2022 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE METAL ROOF CORNICE AT BUILDING FRONT WALL | Sep 2, 2022 |
| Jul 29, 2022 | B | Apt 2A · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 2, 2022 |
| Jul 29, 2022 | B | Apt 2A · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 2, 2022 |
| Jul 21, 2022 | A | Apt BLDG · § 27-2005 ADM CODE REFIT LOWER WINDOW SASH IN THE 1st ROOM FROM NORTH LOCATED AT APT BLDG, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 24, 2022 |
| Jul 21, 2022 | C | Apt BLDG · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT BLDG, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 16, 2022 |
| Jul 21, 2022 | C | Apt BLDG · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT BLDG, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 16, 2022 |
| Jul 21, 2022 | B | Apt 3A · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE DOOR IN THE ENTRANCE LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 25, 2022 |
| Jul 20, 2022 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING , EAST ,WEST AND SOUTH WALL AT PUBLIC HALL, 3rd STORY | Oct 23, 2022 |
| Jul 20, 2022 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL CEILING ,EAST,WEST,AND SOUTH WALL. AT PUBLIC HALL, 3rd STORY | Aug 24, 2022 |
| Apr 6, 2021 | C | Apt 1A · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1A, 1st STORY | May 2, 2021 |
| Apr 6, 2021 | A | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED | Jul 10, 2021 |
| Sep 8, 2020 | B | Apt 2A · § 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 13, 2020 |
| Jan 23, 2020 | C | Apt 2B · § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT RANGE IN THE KITCHEN LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jan 31, 2020 |
| Nov 14, 2019 | A | Apt 1A · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE KITCHEN LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Feb 17, 2020 |
| Nov 14, 2019 | A | Apt 1A · § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE CERAMIC SOAP DISH IN THE BATHROOM LOCATED AT APT 1A, 1st STORY | Feb 17, 2020 |
| Jun 3, 2019 | B | § 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE THE FRONT YARD | Jul 8, 2019 |
| Feb 22, 2019 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT VESTIBULE CEILING , 1st STORY | May 28, 2019 |
| Feb 7, 2019 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT PUBLIC HALL, 1st STORY | May 13, 2019 |
| Feb 7, 2019 | C | Apt 1B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Feb 15, 2019 |
| Feb 7, 2019 | C | Apt 3B · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOWER SASH COUNTER BALANCE AT SOUTH-1 WINDOW IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Feb 15, 2019 |
| Feb 7, 2019 | C | Apt 1B · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE FIRE PROOF METAL DOOR IN THE ENTRANCE LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Feb 15, 2019 |
| Feb 7, 2019 | C | Apt 3A · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE DOOR IN THE ENTRANCE LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Feb 15, 2019 |
| Jul 5, 2017 | C | Apt 3A · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Jul 1, 2017 |
Showing 60 of 65. Full list on the agency site.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 7, 2026 | DOB Safety | AEUHAZ: | Open |
| Sep 30, 2026 | DOB Safety | AEUHAZ: | Open |
| Sep 30, 2026 | DOB Safety | AEUHAZ: | Open |
| Aug 31, 2026 | DOB | CONSTRUCTION: FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.NOTED AT THE T IME OF INSPECTION,I OBSERVED AT EXP1,DAMAGED ROOF CORNICE AND OPEN/EXP OSED MASONRY.AT EXP2,CRACK ON STONE AND MASONRY OBSERVED AT FIRST FL.A T EXP3,CRACK/STEP CRACK AND SPALLING STUCCO OBSERVED ON MULTIPLE LOCAT IONS.REMEDY:REPA | Open |
| Aug 31, 2026 | ECB | Construction: FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY. NOTED AT THE TIME OF INSPECTION I OBSERVED FLOWER POT IS STORED ON THE FIRE ESCAPE HORIZONTAL LANDINGS AT EXPOSURE 3(NORTH ELEVATION) 3RD FLOOR. THE STORAGE OF T | Open |
| Aug 20, 2026 | ECB | Construction: FAILURE TO OBEY VACATE ORDER FROM THE COMMISSIONER PER 28-207.4. FULL VACATE ORDER WAS ISSUED 07/02/2022 UNDER COMPLAINT #3861955 WITH FULL VACATE ORDER STILL IN EFFECT. AT TIME OF INSPECTION, OBSERVED (APT 2A | Open |
| Jul 8, 2026 | ECB | Construction: FAILURE TO OBEY A VACATE ORDER FROM THE COMMISSIONER : FULL VACATE ORDER ISSUED ON 07-02-2022 UNDER COMPLAINT #3861955 FOR ENTIRE BUILDING, DUE TO DAMAGES SUSTAINED BY FIRE. AT TIME OF INSPECTION OBSERVED APT. | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 26, 2026, 4:25 PM ET. BBL 3014970001.