3 floors · 2 apartments · 3,376 sq ft · built 1920 · class S2 · owner of record: 653 Grand Street Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 63 days | Keep the report on file (not filed with DOB) |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 307 days | Required only if the owner doesn't live there |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 794 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 11, 2026 | Unknown CLASS - 2 AT TIME OF INSPECTION OBSERVED: ACTIVE JOBSITE FOR A THREE-STORY BUILDING DEMOLITION, NO ADEQUATE WINDOW PROTECTION AT EXPO# 3, CREATING HAZARDOUS CONDITIONS FOR PUBLIC AND PROPERTY. #39557806K | Jan 4, 2027 PENDING | $2,500 |
| Aug 11, 2026 | Construction CLASS - 1 AT THE TIME OF INSPECTION OBSERVED: DEMOLITION WORKS IN PROGRESS FOR A 3-STORY BUILDING AT EXPO# 3. A FREE-STANDING WALL AT EXPO #3-4 WAS VERTICALLY DEMOLISHED, CONTRARY TO APPROVED DEMOLITION SEQUENCE, CREATIN #39557809X | Jan 4, 2027 PENDING | $2,500 |
| Aug 11, 2026 | Unknown CLASS - 1 ATOI INSPECTION OF A THREE-STORY BUILDING DEMOLITION, OBSERVED WORK IN PROGRESS, WITH NO ADEQUATE PROTECTION PROVIDED FOR ADJOINING PROPERTY, CREATING A HAZARDOUS CONDITION OF FALLING DEBRIS OR MATERIALS. POSIN #39557807M | Jan 4, 2027 PENDING | $10,000 |
| Aug 11, 2026 | Unknown CLASS - 1 AT TIME OF INSPECTION, OBSERVED SUPPORTED SCAFFOLD IN USE , BUT NOT INSTALLED ADEQUATELY AS PER CODE. SCAFFOLDS WERE MISSING TOE BOARDS, GUARDRAILS. PLATFORM WASN'T FULLY PLANKED, AND PLANKS WEREN'T ADEQUATELY #39557808Y | Jan 4, 2027 PENDING | $5,000 |
None open.
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Aug 11, 2026 | ECB | Unknown: AT TIME OF INSPECTION OBSERVED: ACTIVE JOBSITE FOR A THREE-STORY BUILDING DEMOLITION, NO ADEQUATE WINDOW PROTECTION AT EXPO# 3, CREATING HAZARDOUS CONDITIONS FOR PUBLIC AND PROPERTY. | Open |
| Aug 11, 2026 | ECB | Construction: AT THE TIME OF INSPECTION OBSERVED: DEMOLITION WORKS IN PROGRESS FOR A 3-STORY BUILDING AT EXPO# 3. A FREE-STANDING WALL AT EXPO #3-4 WAS VERTICALLY DEMOLISHED, CONTRARY TO APPROVED DEMOLITION SEQUENCE, CREATIN | Open |
| Aug 11, 2026 | ECB | Unknown: ATOI INSPECTION OF A THREE-STORY BUILDING DEMOLITION, OBSERVED WORK IN PROGRESS, WITH NO ADEQUATE PROTECTION PROVIDED FOR ADJOINING PROPERTY, CREATING A HAZARDOUS CONDITION OF FALLING DEBRIS OR MATERIALS. POSIN | Open |
| Aug 11, 2026 | ECB | Unknown: AT TIME OF INSPECTION, OBSERVED SUPPORTED SCAFFOLD IN USE , BUT NOT INSTALLED ADEQUATELY AS PER CODE. SCAFFOLDS WERE MISSING TOE BOARDS, GUARDRAILS. PLATFORM WASN'T FULLY PLANKED, AND PLANKS WEREN'T ADEQUATELY | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 29, 2026, 2:34 PM ET. BBL 3027810033.