2 floors · 8,350 sq ft · built 1931 · class F4 · owner of record: Zbl 66 Street Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 45 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 11 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 410 days | Next cycle year 2027 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Mar 26, 2026 | Construction CLASS - 1 4 STORY BUILDING UNDER A PSWO ISSUED ON 08-30-25 REFERENCE COMPLAINT 3A27579 BY BADGE :#2797 FOR PERMIT 321780836-I1/COMP#3A17413 ON 06-12-25. DOB RECORDS SHOWED WALLS WERE NOT COMPLETE OR PAINTED/STUCCO AND SW #39552223X | Jan 12, 2027 | $10,000 |
| Aug 30, 2025 | Unknown CLASS - 2 BC 3303.3 WATCHPERSON. AT THE TIME OF MY INSPECTION O A 4 STORY BUILDING UNDER ALTERATION , UPON SEVERAL BANGING ON CONSTRUCTION FENCE AND LOUD BANGING ON SITE ENTRY DOORS TO ALERT WATCH PERSON , NONE WAS PRE #39544305J | Jan 21, 2027 | $2,500 |
| Aug 30, 2025 | Construction CLASS - 1 AT THE TIME OF MY INSPECTION OF A 4 STORY BUILDING UNDER ALTERATION I OBSERVED SUPPORTED SCAFFOLD AT EXPOSURES 1,2,3,4 WITH TARP AFFIXED TO SCAFFOLD FRAMINGS CONTRARY THE APPROVED CONSTRUCTION APPROVED DESIGN D #39544304H | Jan 21, 2027 | $2,500 |
| Jul 1, 2025 | Construction CLASS - 2 GC FAIL TO FILE CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. NO CORRECTIVE MEASURES ON RECORD FOR VIOLATION# 039537631J ISSUED 03042025. #39541830Y | Jun 9, 2026 IN VIOLATION | $625 |
| Jun 12, 2025 | Unknown CLASS - 2 UPON INSPECTION I OBSERVED PIPE SCAFFOLD INSTALLED ON THE 3 FLOOR IN A UNSAFE MANNER CONTRARY TO CODE 3314.1. I OBSERVED PIPE SCAFFOLD INSTALLED AT THE EDGE OF BUILDING WITH NO STACKING PINS INSTALLED. NO GUARD #39541349H | Jan 8, 2027 | $2,530 |
| Jun 12, 2025 | Construction CLASS - 2 UPON INSPECTION OF AN ACTIVE 3 STORY ALT CONSTRUCTION SITE I OBSERVED A TEMP PLATFORM INSTALLED AT ROOF LEVEL INSIDE THE ELEVATOR SHAFT. UPON REQUEST TO SEE DESIGN DRAWINGS FOR THE INSTALLED TEMP PLATFORM NONE #39541348X | Jan 8, 2027 | $1,280 |
| Jun 12, 2025 | Construction CLASS - 1 UPON INSPECTION OF AN ACTIVE 3 STORY ALT CONSTRUCTION SITE I OBSERVED WORKERS ON ROOF DOING MASONRY WORK WITH 1 HAZARDOUS MEANS OF EGRESS PROVIDED. AFTER REVIEW OF SSP 2 SAFE MEANS OF EGRESS SHOULD BE PROVIDED #39541347Y | Jan 8, 2027 | $2,530 |
| Mar 21, 2025 | Construction CLASS - 2 UPON INSPECTION I OBSERVED A FENCE INSTALLED AT EXPOSURES 1&2 NOT CONSTRUCTED OR MAINTAINED ACCORDING TO CODE. PROTRUDING NAILS, SCREWS AND DAMAGED WOOD PANELS. WOOD FENCE PANELS BOWING AND BELLYING OUT AT THE #39538240R | Jun 8, 2026 IN VIOLATION | $1,000 |
| Mar 21, 2025 | Construction CLASS - 2 UPON INSPECTION I OBSERVED A TEMP CONSTRUCTION FENCE INSTALLED AT EXPOSURES 1&2 WITH NO FENCE PROJECT INFORMATION PANEL INSTALLED AT EXPOSURE 2 CONTRARY TO CODE 3301.9.1.2 POSTING OF PROJECT INFORMATION PANELS. #39538241Z | Jun 8, 2026 IN VIOLATION | $1,250 |
| Mar 5, 2025 | Construction CLASS - 2 UPON INSPECTION OF AN ACTIVE 3 STORY ALT CONSTRUCTION SITE I OBSERVED ADJOINING PROPERTIES AT EXPOSURES 3 AND 4 WITH NO ROOF AND OVERHEAD PROTECTION INSTALLED. AFTER REVIEW OF THE PROVIDED SITE SAFETY PLAN ROOF #39537614H | Jan 25, 2027 | $3,125 |
| Mar 5, 2025 | Construction CLASS - 2 UPON INSPECTION OF AN ACTIVE 3 STORY ALT CONSTRUCTION SITE I OBSERVED A SIDEWALK SHED INSTALLED AT EXPOSURES 1 & 2. UPON REQUEST TO SEE THE INSTALLATION LETTER FOR THE SIDEWALK SHED ( A DOCUMENT TO BE KEPT ON S #39537617N | Jan 25, 2027 | $3,125 |
| Mar 4, 2025 | Unknown CLASS - 1 BC 3303.3WATCHPERSON.OBSERVED CLOSED SITE WITH NO ACTIVE WORK, NO WORKERS ON SITE, UPON WALK ENTIRE PERIMETER, LOOK THROUGH VIEWING PANEL, KNOCKED ON FENCE, CALLING OUT FOR WATCHPERSON, NO WATCHPERSON COULD BE #39537631J | Jun 9, 2026 IN VIOLATION | $2,500 |
| Jan 26, 2023 | Construction CLASS - 2 2 STORY VERTICAL ENLARGEMENT INTO 3 STORY COMMERCIAL, WITH 44F FINAL HEIGHT. I OBSERVED ACTIVE SITE WITH SEVERAL WORKERS ON CELLAR, 1ST AND 2ND FLOORS. NO SIDEWALK SHED(SWS) INSTALLED AT EXP1 WHILE EXTERIOR WAL #39512153N | Oct 23, 2023 IN VIOLATION | $625 |
| Issued | Violation | Status |
|---|---|---|
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #28372 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 11) | Active |
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 11) | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)