10 floors · 71 apartments · 75,686 sq ft · built 1928 · class D4 · owner of record: 65 West 95 St Owners
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 49 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 49 days | Annual |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-18 (Accepted). Agency page | Dec 31, 2026 in 49 days | 1 of 2 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 65 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 75,686 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 170 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 170 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 293 days | Registered through 2027-09-01 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1145 days | Next cycle year 2029 |
| Energy audit and retro-commissioning (2029) Likely applies Local Law 87 · Calendar year 2029 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1209). Agency page | Dec 31, 2029 in 1145 days | Next due 2029 |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $47,250 in late-filing or failure-to-file penalties. Agency page | On file | Cycle 10 filing on record: SWARMP (2026-10-06) |
None open.
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #03112 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #03099 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #07108 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #28395 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #02757 | DOB VIOLATION - ACTIVE |
| Jul 23, 2020 | ELEVATOR #9028/682702 | DOB VIOLATION - ACTIVE |
| Jul 23, 2020 | ELEVATOR #9028/682701 | DOB VIOLATION - ACTIVE |
| Mar 27, 2000 | LL10/80-LOCAL LAW 10/80 - FACADE #HZ751 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Nov 7, 2022 | B | Apt 3E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT THE CEILING AND ALL WALLS IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Dec 12, 2022 |
| Nov 7, 2022 | B | Apt 3E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT ALL WALLS IN THE KITCHEN LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Dec 12, 2022 |
| Nov 7, 2022 | C | Apt 3E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE KITCHEN LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 13, 2022 |
| Nov 7, 2022 | C | Apt 3E · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE GLASS PANE AT UPPER SASH WINDOW AT THE NORTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 13, 2022 |
| Nov 7, 2022 | C | Apt 3E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT THE CEILING AND ALL WALLS IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 13, 2022 |
| Nov 7, 2022 | B | Apt 3E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT THE CEILING AND ALL WALLS IN THE PRIVATE HALLWAY LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Dec 12, 2022 |
| Nov 7, 2022 | B | Apt 3E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Dec 12, 2022 |
| Aug 1, 2022 | B | Apt 3E · § 27-2026 ADM CODE REPLACE THE BROKEN OR DEFECTIVE SINK AT WASH BASIN IN THE BATHROOM LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 5, 2022 |
| Aug 1, 2022 | B | Apt 3E · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT NORTH WALL IN THE FOYER LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 5, 2022 |
| Jul 28, 2022 | B | Apt 3E · § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE FAUCET AT WASH BASIN IN THE BATHROOM LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 1, 2022 |
| Jul 28, 2022 | B | Apt 3E · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC WALL TILES AT WEST WALL IN THE BATHROOM LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 1, 2022 |
| Jul 28, 2022 | B | Apt 3E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND NORTH WALL IN THE BATHROOM LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 1, 2022 |
| Jul 28, 2022 | B | Apt 3E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING ANDALL WALLS IN THE PRIVATE HALLWAY LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 1, 2022 |
| Jul 28, 2022 | B | Apt 3E · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 1, 2022 |
| Jul 28, 2022 | B | Apt 3E · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 1, 2022 |
| Jul 28, 2022 | C | Apt 3E · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING INNER WINDOW GLASS PANE IN THE 1st ROOM FROM EAST LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 3, 2022 |
| Jul 28, 2022 | B | Apt 3E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS IN THE 1st ROOM FROM EAST LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 1, 2022 |
| Jul 28, 2022 | B | Apt 3E · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 1, 2022 |
| Mar 18, 2022 | B | Apt 3E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILING IN THE FOYER LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION FROM NORTH AT EAST | Apr 22, 2022 |
| Mar 18, 2022 | B | Apt 3E · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE COUNTERBALANCE TO NORTH 2 WINDOW (UPPER AND LOWER SASHES) IN THE 2nd ROOM FROM EAST LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION FROM NORTH AT EAST | Apr 22, 2022 |
| Mar 18, 2022 | B | Apt 3E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION FROM NORTH AT EAST | Apr 22, 2022 |
| Mar 18, 2022 | B | Apt 3E · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE GASKET SEAL ON REFRIGERATOR DOOR IN THE KITCHEN LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION FROM NORTH AT EAST | Apr 22, 2022 |
| Mar 18, 2022 | B | Apt 3E · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE BASE CABINET SINK AT WEST WALL IN THE KITCHEN LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION FROM NORTH AT EAST | Apr 22, 2022 |
| Mar 18, 2022 | B | Apt 3E · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR CABINETS AT WEST WALL IN THE KITCHEN LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION FROM NORTH AT EAST | Apr 22, 2022 |
| Mar 18, 2022 | B | Apt 3E · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD CABINETS AT WEST WALL IN THE KITCHEN LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION FROM NORTH AT EAST | Apr 22, 2022 |
| Mar 18, 2022 | B | Apt 3E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION FROM NORTH AT EAST | Apr 22, 2022 |
| Mar 18, 2022 | B | Apt 3E · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR THROUGHOUT IN THE PRIVATE HALLWAY LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION FROM NORTH AT EAST | Apr 22, 2022 |
| Mar 18, 2022 | B | Apt 3E · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION FROM NORTH AT EAST | Apr 22, 2022 |
| Mar 18, 2022 | B | Apt 3E · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT NORTH, WEST AND SOUTH WALLS IN THE BATHROOM LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION FROM NORTH AT EAST | Apr 22, 2022 |
| Mar 18, 2022 | B | Apt 3E · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION FROM NORTH AT EAST | Apr 22, 2022 |
| Mar 18, 2022 | B | Apt 3E · § 27-2026 ADM CODE REPLACE THE BROKEN OR DEFECTIVE WASH BASIN AT WEST WALL IN THE BATHROOM LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION FROM NORTH AT EAST | Apr 22, 2022 |
| Mar 18, 2022 | B | Apt 3E · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE MECHANICAL STOPPER AT BATHTUB IN THE BATHROOM LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION FROM NORTH AT EAST | Apr 22, 2022 |
| Mar 18, 2022 | B | Apt 3E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILING IN THE 4th ROOM FROM EAST LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION FROM NORTH AT EAST | Apr 22, 2022 |
| Mar 18, 2022 | B | Apt 3E · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT CEILING IN EAST CLOSET IN THE 4th ROOM FROM EAST LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION FROM NORTH AT EAST | Apr 22, 2022 |
| Mar 18, 2022 | B | Apt 3E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT ALL WALLS AND CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION FROM NORTH AT EAST | Apr 22, 2022 |
| Mar 18, 2022 | B | Apt 3E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILING IN THE BATHROOM LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION FROM NORTH AT EAST | Apr 22, 2022 |
| Mar 18, 2022 | B | Apt 3E · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT CEILING IN EAST CLOSET IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION FROM NORTH AT EAST | Apr 22, 2022 |
| Nov 9, 2017 | A | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY | Feb 12, 2018 |
| Nov 9, 2017 | B | Apt 6B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WALLS AND CEILING IN THE BATHROOM LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST | Dec 14, 2017 |
| Nov 9, 2017 | B | Apt 6B · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST | Dec 14, 2017 |
| Dec 21, 2016 | A | § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY | Mar 26, 2017 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 12, 2026, 3:45 AM ET. BBL 1012090006.