15 floors · 564 apartments · 484,479 sq ft · built 1954 · class D3 · owner of record: Nyc Housing Authority
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 46 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 46 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 62 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 484,479 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 167 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 167 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 11 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 411 days | Next cycle year 2027 |
| Energy audit and retro-commissioning (2035) Likely applies Local Law 87 · Calendar year 2035 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1605). Agency page | Dec 31, 2035 in 3333 days | Next due 2035 |
| Annual boiler inspection (5 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-02-02 (Accepted). Agency page | On file | 2026 reports accepted |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. Agency page | On file | Cycle 10 filing on record: UNSAFE (2025-08-13) |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jun 3, 2026 | Construction CLASS - 2 PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATION:NOTE:OBSERVED THE FOLLOWING SHED CONDITIONS.DETACH CROSS BRACE AND LOOSE PARAPET AT AREA OF BUILDING ENTRANCE.ALSO MISSING PARAPET POST CORNER OF EXPOSURE #35729926H | Jul 15, 2026 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jun 3, 2026 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT THE TIME OF INSPECTION OBSERVED THE FOLLOWING CONDITIONS. BROKEN WINDOW PANE AT THE 13 FLOOR AND DAMAGED JOINT ON EXPOSURE 3, SOUTH ELEVATION PARK AVENUE. REMEDY: REPAIR AND/OR REPLACE #SR1101NS | DOB VIOLATION - ACTIVE |
| May 20, 2025 | CONSTRUCTION PARTIAL VACATE ORDER DUE TO; LOOSE/CRACKED/SPALLING CONCRETE, STUCCO AND MORTAR JOINTS ON ROOF BULKHEAD/WATER TOWER ENCLOSURE. REMEDY: VACATE ENTIRE ROOF. RESTRICT ACCESS TO VACATED AREAS #SR11101RF | DOB VIOLATION - ACTIVE |
| May 15, 2025 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED DEFECTED BALCONY SLAB AT EXPOSURE 1 AND FACING EXPOSURE 4. DAMAGED MORTAR JOINTS AT EXPOSURE 2 AND 3. REMEDY: REPAIR AND/OR REPLACE #SR1102NS | DOB VIOLATION - ACTIVE |
| May 13, 2025 | CONSTRUCTION FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. EXPOSURES 2,3 &4 MULTIPLE CORRODED, SAGGING METAL LINTELS ON SEVERAL UPPER FLOORS ROOF:WATER TOWN BRICK ENCLOSURE HAS DEFECTIVE MASONRY WORK SUCH AS SPALLING & MISSING MORTAR JOINTS. REMEDY: REPAIR AND/OR REPLACE DEFECTIVE CONDITION ON RING BEAM #SR1103RF | DOB VIOLATION - ACTIVE |
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #00538 | DOB VIOLATION - ACTIVE |
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #00536 | DOB VIOLATION - ACTIVE |
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #00539 | DOB VIOLATION - ACTIVE |
| Jan 23, 2020 | FACADE SAFETY PROGRAM #HAZ88620 | DOB VIOLATION - ACTIVE |
| Jan 23, 2020 | FACADE SAFETY PROGRAM #HAZ88621 | DOB VIOLATION - ACTIVE |
| Jan 14, 2020 | FACADE SAFETY PROGRAM #HAZ88571 | DOB VIOLATION - ACTIVE |
| Jan 14, 2020 | FACADE SAFETY PROGRAM #HAZ88556 | DOB VIOLATION - ACTIVE |
| Jan 13, 2020 | FACADE SAFETY PROGRAM NYCHA UNSAFE CYCLE 8 REPORT FILED #HAZ88885 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| Jan 23, 2020 | Facades FISP CYCLE 8A UNSAFE REPORT FILED | Active |
| Jan 23, 2020 | Facades FISP CYCLE 8A UNSAFE REPORT FILED | Active |
| Jan 14, 2020 | Facades FISP CYCLE 8A UNSAFE REPORT FILED | Active |
| Jan 14, 2020 | Facades FISP CYCLE 8A UNSAFE REPORT FILED | Active |
| Jan 13, 2020 | Facades FISP NYCHA UNSAFE CYCLE 8 REPORT FILED | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 15, 2026, 5:27 AM ET. BBL 1016050024.