1.5 floors · 2 apartments · 2,072 sq ft · built 1951 · class B3 · owner of record: Treecare2016, Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 308 days | Required only if the owner doesn't live there |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 19, 2026 | Construction CLASS - 2 PSWO AND ECB VIO ISSUED FOR WORK WITHOUT PERMIT. OBSERVED SEVERAL 2" DG. BLACK DRAIN PIPES WERE INSTALLED AT THE 1ST FLOOR BATHROOM DURING BATHROOM RENOVATION IN ADDITION, SEVERAL COPPER WATER SUPPLY LINES WERE #35680915H | Dec 15, 2026 PENDING | $1,250 |
| Aug 19, 2026 | Unknown CLASS - 1 PSWO AND ECB VIOLATION ISSUED FOR WORK WITHOUT PERMIT. OBSERVED INSTALLATION OF BX CABLE IN WALLS AND CEILING INCLUDING EL. SPLIT BOXES, THEINSTALLATION IS IN PROGRESS AT ATTIC, 1ST FLOOR AND CELLAR TO PROVIDE #35680916J | Dec 15, 2026 PENDING | $2,500 |
| Aug 19, 2026 | Construction CLASS - 2 WORK WITHOUT PERMIT(PSWO AND ECB VIO ISSUE OBSERVED THE EXISTING BATHROOM AT 1ST FLOOR LEVEL WAS DEMO INCLUDING ALL THE FIXTURES, FLOORING AND TILES. NO WORK PERMIT ON FILE AT D. O. B. FOR THE WORK IN PROGRESS #35680914X | Dec 15, 2026 PENDING | $1,250 |
None open.
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Aug 19, 2026 | ECB | Construction: PSWO AND ECB VIO ISSUED FOR WORK WITHOUT PERMIT. OBSERVED SEVERAL 2" DG. BLACK DRAIN PIPES WERE INSTALLED AT THE 1ST FLOOR BATHROOM DURING BATHROOM RENOVATION IN ADDITION, SEVERAL COPPER WATER SUPPLY LINES WERE | Open |
| Aug 19, 2026 | ECB | Unknown: PSWO AND ECB VIOLATION ISSUED FOR WORK WITHOUT PERMIT. OBSERVED INSTALLATION OF BX CABLE IN WALLS AND CEILING INCLUDING EL. SPLIT BOXES, THEINSTALLATION IS IN PROGRESS AT ATTIC, 1ST FLOOR AND CELLAR TO PROVIDE | Open |
| Aug 19, 2026 | ECB | Construction: WORK WITHOUT PERMIT(PSWO AND ECB VIO ISSUE OBSERVED THE EXISTING BATHROOM AT 1ST FLOOR LEVEL WAS DEMO INCLUDING ALL THE FIXTURES, FLOORING AND TILES. NO WORK PERMIT ON FILE AT D. O. B. FOR THE WORK IN PROGRESS | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 28, 2026, 12:13 AM ET. BBL 4031310024.