Queens · Block 3497 · Lot 50 · 11385

65-12 60 Place

2 floors · 2 apartments · 10,972 sq ft · built 1931 · class K4 · owner of record: T.C. Corp

10open violations
$72,500ECB/OATH penalties owed
0HPD class C (immediately hazardous)
1164dto Gas piping inspection (2029 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 68 days
Keep the report on file (not filed with DOB)
Annual property registration Check
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 312 days
Required only if the owner doesn't live there
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1164 days
Next cycle year 2029
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-08-07 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (5) · $72,500 owed
IssuedViolationHearingBalance
Aug 16, 2019Construction CLASS - 2
PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATION#3307.6.4.8. NOTE:AT THE TIME OF MY INSPECTION,I OBSERVED A SIDEWALK SHED ERECTED AT EXPOSURE 1. I ALSO OBSERVED THAT THERE WERE NO LIGHT BULB FUNCTIONING;T
#35438920R
Jan 14, 2020
DEFAULT
$10,000
May 20, 2019Site Safety CLASS - 1
FAILURE TO HAVE CONSTRUCTION SUPERINTENDENT.PRESENT AT SITE AS REQUIRES.AT THE TIME OF MY INSPECTION OF AN ACTIVE JOBSITE,UPON REQUEST FOR CONSTRUCTION SUPERINTENDENT PRESENT ON SITE,NONE WAS PROVIDED AND NO CO
#35418412M
Jan 14, 2020
DEFAULT
$25,000
May 20, 2019Construction CLASS - 1
BC3301.13.1/SITE SAFETY PLAN.AT TIME OF INSPECTION ON AN ACTIVE JOBSITE.I HAVE REQUESTED TO SEE SITE SAFETY PLAN FOR CONSTRUCTION SITE,NO SITE SAFETY PLAN WERE PROVIDED FOR THE SITE.REM:STOP ALL WORK PROVIDE SI
#35418417L
Jan 14, 2020
DEFAULT
$12,500
May 20, 2019Construction CLASS - 1
BC28-105-12.2/WORK DOES NOT CONFORM TO DESIGN DRAWINGS.NOTE:AT TIME OFMY INSPECTION OF AN ACTIVE JOBSITE I OBSERVED 1ST FLR DECKING EXTENDI NG APPROXIMATELY ONE FOOD BEYOND BEARING WALL LINE ABOVE THE EXIT DOOR
#35418419P
Jan 14, 2020
DEFAULT
$12,500
May 20, 2019Construction CLASS - 1
BC3301.2/FAILURE TO INSTITUTE AND MAINTAIN TEMPORARY CONSTRUCTION EQUIPMENT-OVERHEAD PROTECTION.NOTE:AT THE TIME OF MY INSPECTION OF AN ACTIVE JOBSITE,I OBSERVED CONSTRUCTION WORK BEING PERFORMED AT 1ST FLR DEC
#35418418N
Jan 14, 2020
DEFAULT
$12,500
DOB (3)
IssuedViolationStatus
Jan 12, 2023CONSTRUCTION
BOROUGH COMMISSIONER HAS ORDERED WORK STOPPED FOR #420663687 DUE TO GENERAL CONTRACTOR WITHDRAWAL.
#23-00078
DOB VIOLATION - ACTIVE
May 15, 2014LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
#19829
DOB VIOLATION - ACTIVE
Feb 10, 1997LOCAL LAW 62/91 - BOILERS

#35935
DOB VIOLATION - ACTIVE
DOB NOW Safety (2)
IssuedViolationStatus
Sep 18, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle B (premises is in Community District 5)
Active
May 15, 2014Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
Active
HPD (0)

None open.

Check the agency records